Bathroom Fan CFM Calculator & Humidity Timer

Model the period after a shower with a fixed room volume and fixed replacement-air moisture. Enter two measured CFM values and a timer, then compare their humidity curves and find when each reaches your stated target.

Bathroom ventilation

Compare delivered bathroom fan airflow and timing

Check humidity at the timer for two measured exhaust flows.

Only Case B meets the timer target.

Exhaust airflow and timer
Humidity at one room temperature
Room dimensions
Case A timer humidity
60.66% RH
Above target
Case B timer humidity
50.25% RH
At or below target

Modeled humidity during the timer

Case A · 60.66% RH

Case B · 50.25% RH

Solid teal shows A and dashed blue B. The dashed brown line is the target. The gray dotted line shows the replacement humidity.

Delivered airflow at the timer

44.3615 CFM or higher

Minimum flow at four-decimal input precision for this timer.

Enclosed volume
640 ft³

Exhaust and target ledger

Case A · 30 CFM

2.8125 air changes per hour

First at target after 29.5743 min.

Case B · 65 CFM

6.09375 air changes per hour

First at target after 13.6497 min.

Humidity trace CSV

How to use this calculator

  1. Measure the enclosed bathroom footprint and average ceiling height.
  2. Record initial and target humidity at a stable indoor temperature. Use the replacement air’s humidity expressed at that same temperature.
  3. Enter two delivered CFM values measured under the conditions you want to compare, plus the planned timer duration.
  4. Compare humidity at timer shutoff, the modeled flow threshold and the two curves. Review the calculation ledger and export it if needed.

The Formula

The mathematical logic powering this calculation is:

Use an enclosed room volume V in cubic feet from measured length × width × average ceiling height. Use delivered exhaust airflow Q in cubic feet per minute under your entered conditions. Air changes per hour equal 60Q/V. Replacement air humidity must be expressed at the same indoor temperature as the initial and target values. For example, enter the measured humidity of replacement air at that indoor temperature, or convert its moisture state before using such a value.

With continued moisture production and temperature changes outside the model, let initial room humidity be H₀ and replacement humidity be Hₛ. The well-mixed mass balance with a fixed air exchange gives H(t) = Hₛ + (H₀ − Hₛ) exp(−Qt/V) at t minutes. This applies the constant-volume ventilation-decay relationship to moisture concentration at fixed temperature. Moisture re-release from wet surfaces, simultaneous uncontrolled air changes, or a varying supply state can shift the observed curve.

When the room starts above the target Hₜ and Hₛ is lower than Hₜ, the minimum modeled airflow for positive time t is V/t × ln[(H₀ − Hₛ)/(Hₜ − Hₛ)]. Conversely, elapsed time at a measured positive Q is V/Q × that log ratio. If the incoming air is at the target, a room that starts above approaches the target from above. If the incoming air is above the target, reaching it from above is infeasible in this model.

If the room starts at or below the target and replacement air is above it, increasing air exchange can raise humidity. For positive time, maximum flow to remain at or below the target is V/t × ln[(Hₛ − H₀)/(Hₛ − Hₜ)]. For zero timer duration, the initial reading is the result. For zero delivered flow, the calculated moisture state stays at its starting value. Exact equality at the entered target is within the target. A displayed rounded value can differ from the unrounded comparison.

Inputs allow four decimal places. Dimensions span 0.0001–100 ft, humidity 0–100% RH, airflow 0–5,000 CFM and timer 0–240 min. The model compares moisture under these assumptions; follow local mechanical ventilation requirements and verify actual airflow independently.

Worked Example

If you input:

  • Bathroom: 10 × 8 × 8 ft
  • Humidity: 85% initial, 45% replacement and 55% target at the same temperature
  • Delivered airflow: 30 and 65 CFM
  • Timer: 20 minutes

Result:

The 640 ft³ example needs about 44.36 CFM to reach the 55% target within 20 minutes. Case A ends around 60.66% and Case B around 50.25%. Case B first reaches the target after about 13.65 minutes.

Frequently Asked Questions

Should I enter measured airflow or the fan label?

Use measured delivered airflow at the bathroom grille under the compared conditions. Duct and opening differences can make installed airflow differ from the label.

Should I use outdoor relative humidity directly?

Express the replacement air at the same temperature as the room. Relative humidity changes when air temperature changes even when its moisture content stays the same.

Why could higher airflow increase the humidity?

If replacement air contains more moisture than the starting room at the shared temperature, ventilation moves the room toward that wetter replacement state.

Why might reaching the target take longer in practice?

Evaporation from wet surfaces, an ongoing shower and weaker mixing can alter the observed room curve. Treat the result as a one-zone comparison and check real readings.

What if the replacement humidity equals my target?

A room starting above approaches that humidity from above. It takes a finite time to get within an entered margin above it, while exact equality is asymptotic in this model.

What happens at zero timer duration?

The timer result is the initial humidity for both cases. Any time-to-target shown refers to continued operation at the entered delivered airflow.

Similar Calculators