Shed quote worksheet

Compare shed quotes on matched scope

Quote comparison

Quote A costs $220.00 less on matched scope.

Quote A · Kit quote

10 × 12 ft · 120 ft²

Matches requested footprint

Scoped total with reserve

$6,193.00

Known subtotal
$5,630.00
Reserve on known subtotal
$563.00
Per outer ft²
$51.61

$107.00 under budget.

Quote dated 2026-11-05.

Quote B · Installed quote

12 × 10 ft · 120 ft²

Matches requested footprint

Scoped total with reserve

$6,413.00

Known subtotal
$5,830.00
Reserve on known subtotal
$583.00
Per outer ft²
$53.44

$113.00 over budget.

Quote dated 2026-11-12.

Cost and scope breakdown

Cost stack with budget

The bars share a USD scale. Incomplete quotes show priced items and the reserve on those items.

Quote A$6,193.00

Quote B$6,413.00

  • Site preparation
  • Base and foundation
  • Floor system
  • Shell and package
  • Delivery
  • Assembly and labor
  • Permit and review
  • Reserve
  • Dashed line · $6,300.00 budget

Quote A remaining scope

No unpriced or omitted requested items.

Quote B remaining scope

No unpriced or omitted requested items.

Requested shed and budget

Enter the shed’s outer rectangle. Exclude roof overhangs, land and site clearance from these dimensions.

10 × 12 ft · 120 ft² requested · 10.00% reserve

Shared written scope

Include only items you want counted in both proposals. The shell is always counted. The full shell package price still applies when another item is outside scope.

Edit quote terms

Use In package when the written shell line already covers the item. Use Unpriced for an unresolved charge and Omitted if the quote leaves it out.

Site preparation
Base and foundation
Floor system
Shell and package
Delivery
Assembly and labor
Permit and review
Component cost ledger
Shed component quotes and known costs
Requested componentQuote AQuote B
Site preparation$510.00 · Qty × rate$300.00 · Lump sum
Base and foundation$600.00 · Qty × rate$440.00 · Lump sum
Floor system$480.00 · Lump sumIncluded in package
Shell and package$2,900.00 · Lump sum$4,800.00 · Lump sum
Delivery$250.00 · Lump sum$180.00 · Lump sum
Assembly and labor$780.00 · Qty × rateIncluded in package
Permit and review$110.00 · Lump sum$110.00 · Lump sum
Reserve on known costs$563.00$583.00

Export the comparison

Download shed comparison CSV
View CSV text

How to use this calculator

  1. Enter the requested outer length and width, a contingency percentage and any common budget.
  2. Check the work that belongs in both proposals. Include permit and review fees if they are part of the written project scope.
  3. Enter each quote’s stated dimensions and date. Enter a lump sum or a documented quantity and unit rate for each priced item.
  4. Mark items already priced in the package and items that remain unpriced or omitted. Check the cost bars and remaining-scope lists.
  5. Review the ledger and download the CSV to keep pricing modes, quantities, scope gaps and both budgets together.

The Formula

The mathematical logic powering this calculation is:

Use the requested and quoted outer lengths and widths in feet. Area equals outer length × outer width. A quote matches when both side lengths equal the requested rectangle, with a 90-degree rotation allowed. Equal area alone does not match different side lengths. Use a consistent measurement basis across documents. The worksheet excludes roof overhangs, site access, setbacks, land and clearance from this rectangle and does not estimate interior area or needed materials.

Select the work that belongs in both quotes. Shell and package is always included in the requested scope. For each other requested component, enter a lump sum, quantity × unit rate, In package, Unpriced or Omitted. A unit-price line rounds to the nearest cent, with exact half cents rounding upward. In package means the written shell price already contains the item, so it adds zero standalone cost. If the shell price is unresolved, its bundled items remain unresolved too. A known $0 scope item can be entered as a lump sum. Include applicable taxes and charges in the entered amount or rate. Shared scope excludes standalone charges for unchecked items without changing the full package price on either side.

Add the known standalone line amounts once. Multiply the subtotal by the entered contingency percentage and round once to the nearest cent, with exact half cents rounding upward. The plan amount equals known subtotal plus this reserve. Until all requested scope is priced or included in a priced package, the plan amount is a known subtotal with reserve only. Area cost and budget headroom require complete pricing for that quote. The price per outer ft² divides the complete amount by that quote’s exact entered area. Budget headroom equals entered budget minus the complete amount. Compare the two complete amounts only when both have the requested dimensions and all requested pricing is resolved.

Footprint dimensions accept 0.01 to 1,000 feet with up to two decimals. Prices and budget accept $0 to $1,000,000 per line or rate, with two decimal places. Quantities accept 0.001 to 10,000 with up to three decimal places. Enter a unit label for each quantity line. The reserve accepts 0 to 100 percent with up to two decimals. Quote dates are optional calendar dates. Dates provide provenance without implying expiration. The worksheet uses entered quotes and common budget assumptions. It does not determine which site work, construction, permits or reviews are required.

Worked Example

If you input:

  • Requested shed and budget: 10 × 12 ft, 10% reserve and a $6,300 budget.
  • Shared written scope: Site preparation, base, floor, shell, delivery, assembly and permit/review all requested.
  • Quote A: 10 × 12-ft kit. $2,900 shell, $510 prep, $600 base, $480 floor, $250 delivery, $780 assembly and $110 permit/review.
  • Quote B: 12 × 10-ft installed. $4,800 package includes floor and assembly, plus $300 prep, $440 base, $180 delivery and $110 permit/review.

Result:

Quote A is $5,630 before reserve and $6,193 with its $563 reserve. Quote B is $5,830 before reserve and $6,413 with its $583 reserve. With both scopes and footprints matched, A costs $220 less and is $107 under budget. B is $113 over budget.

Frequently Asked Questions

What dimensions belong in the footprint?

Use the same outer shed dimensions across the target and both quotes, with no roof overhang, setbacks or outdoor clearance. A 10 ft by 12 ft quote matches a 12 ft by 10 ft request if all you are comparing is the outer rectangle.

Where do I enter work included in a kit or installed package?

Enter the complete written package amount on Shell and package, and select In package for each requested item documented as included. This retains the charge once.

What’s the difference between unpriced and omitted?

Unpriced records a price still outstanding for requested work. Omitted records requested work left out of the written quote. Both leave the matched total incomplete until covered or removed from common scope.

Is the reserve a quoted price?

The reserve is your planning percentage applied to currently known costs. It is separate from the written amounts. If pricing is incomplete, the reserve cannot fill in missing costs.

What if the two sheds have equal areas?

Both lengths must match the requested outer rectangle, allowing rotation. A 10-by-12-foot footprint covers the same area as an 8-by-15-foot footprint but retains different side lengths.

Does the permit row determine if I need permission?

It tracks confirmed quote scope and costs that you enter. Local permit decisions, taxes, engineering, access and site work depend on your project and are outside this calculation.

Similar Calculators