Deck Footing Layout & Concrete Order Calculator
Reconcile post-center positions along already designed deck beams. Compare entered marks with a mathematical equal-panel layout using your documented spacing and required support stations. Turn the shown marks and supplied concrete form dimensions into a volume and supplier order. The worksheet keeps missing marks and spacing flags visible beside the quantity comparison.
Compare deck footing marks and concrete orders
Audit two post schedules using supplied beam plans, then compare the concrete quantities for their shown marks.
Post layouts and supplied form sizes
Use dimensions and limits supplied for your project. These examples illustrate quantities and spacing checks.
Designed beam runs
Use each beam’s own zero datum. Enter manual centers in increasing order, separated by commas.
Concrete delivery terms
Use the supplier’s terms and a documented field or fixed pump and truck loss. Enter zero for an amount that does not apply.
Option B costs $40.00 more at the entered concrete quote.
Review the flags before using quantities. Concrete is counted for the shown marks.
- Placed volume
- 0.7757 yd³
- Supplier order
- 1 yd³
2 gaps exceed the entered limit. 1 required mark missing.
- Placed volume
- 1.0586 yd³
- Supplier order
- 1.25 yd³
No entered-limit or endpoint flags.
Post marks and gaps by beam
Each strip uses the same horizontal scale. Grey end segments show distance outside the required end marks.
- Shown post
- Over entered limit
- Missing required mark
Concrete order reconciliation
Option A
0.1551 yd³ per shown mark
0.0388 yd³ field allowance
0.12 yd³ fixed loss
0.9345 yd³ before minimum and order step
Option B
0.1512 yd³ per shown mark
0.0529 yd³ field allowance
0.12 yd³ fixed loss
1.2316 yd³ before minimum and order step
Open station and gap ledger
| Option and beam | Stations | Distance | Entered plan check |
|---|---|---|---|
| Option A, beam 1 | 12 in to 96 in | 84 in | Above entered limit |
| Option A, beam 1 | 96 in to 180 in | 84 in | Above entered limit |
| Option A, beam 2 | 12 in to 84 in | 72 in | Within entered limit |
| Option A, beam 2 | 84 in to 156 in | 72 in | Required end mark missing |
| Option B, beam 1 | 12 in to 68 in | 56 in | Within entered limit |
| Option B, beam 1 | 68 in to 124 in | 56 in | Within entered limit |
| Option B, beam 1 | 124 in to 180 in | 56 in | Within entered limit |
| Option B, beam 2 | 12 in to 84 in | 72 in | Within entered limit |
| Option B, beam 2 | 84 in to 156 in | 72 in | Within entered limit |
Show copyable CSV
How to use this calculator
- Enter the designed beam runs, their required center stations and the documented limits for the project.
- For each option choose entered marks or equal panels. Enter any manual centers as an increasing comma-separated list.
- Enter the supplied form shape and dimensions for each option. Each shown mark contributes one footing of that size.
- Enter supplier minimum, order increment, material rate and any documented allowance or fixed loss, using zero when an item does not apply.
- Check the beam flags before comparing projected quantities. Review the ledger or download the detailed order arithmetic.
The Formula
The mathematical logic powering this calculation is:
For each designed beam enter the length, required first and last post centers, and an applicable maximum center spacing documented in your plan. Compare positions in inches from that beam’s own zero datum. Entered marks must increase strictly between the required stations inclusive. Gaps between marks are compared with the entered limit; a missing required end mark gets a separate flag. The distance from beam ends to the required stations is context only.
Equal panels use the smallest integer k such that k × entered limit ≥ distance between required stations. The k + 1 marks include both supplied stations and use exact fractions. This is a mathematical layout to compare dimensions, with no allowance for the rest of the structure.
For each shown mark, round form volume is π × diameter² × concrete thickness ÷ 4. Square form volume is side² × concrete thickness. Divide cubic inches by 46,656 for cubic yards. The count includes only shown marks. Order demand is placed volume plus the entered percentage allowance on placed concrete and the entered fixed pump or truck loss. Raise this amount to the supplier minimum, then round upward once to a multiple of the order increment. The quoted total uses ordered volume × entered rate + fixed delivery.
Enter 1–4 beam runs, lengths 1–1,200 in, limit 0.001–1,200 in, 1–25 entered marks per run or no more than 25 generated marks. Form diameter or side 0.001–120 in, concrete thickness 0.001–240 in. Allowance 0–100%, fixed loss and minimum 0–100 yd³, increment 0.001–100 yd³, rate $0–$1,000/yd³ and delivery $0–$10,000. Enter up to three decimals. The model compares exact station fractions and uses a fixed 40-place value of π for the volume calculation.
Footing dimensions and spacing reflect only the entered plan. Actual bearing, loads, frost and connection details must be established separately. The AWC guide illustrates why those criteria matter. It is a 2015 IRC-based reference and supplies no sizing table to this calculator. The examples are illustrative dimensions and quote terms.Worked Example
If you input:
- Beam 1: 192 in with required marks at 12 and 180 in, limit 72 in
- Beam 2: 168 in with required marks at 12 and 156 in, limit 72 in
- Option A: Five entered marks, round 16 in × 36 in forms
- Option B: Seven equal-panel marks, square 14 in × 14 in × 36 in forms
Result:
Option A shows five marks with two gaps over the entered limit and one missing required mark. Its shown round forms total 0.7757 yd³ and round to a 1 yd³ order at $260. Option B shows seven marks and 1.0586 yd³ of square forms, with a 1.25 yd³ order at $300 under the same entered quote terms. The shown quantities exclude unrecorded marks.
Frequently Asked Questions
Does the calculator tell me what footing size to use?
Enter the size and spacing documented for the project. The worksheet compares supplied dimensions and computes material quantities. Actual sizes depend on the design, site and applicable requirements.
What happens if one required end mark is missing?
The plot marks that station as missing and exposes the distance to the closest shown post. The order arithmetic counts the centers shown, so omissions are available for review before using quantities.
What is compared with my maximum spacing?
The calculator compares distance between consecutive entered post centers. A gap equal to the entered limit is within. End offsets outside the required station interval are not evaluated.
How are equal panels selected?
The calculator fits the smallest whole number of equal gaps between the two entered required stations that meet your documented maximum, within the worksheet count limit.
Which concrete losses are included?
Enter a percentage allowance and fixed loss based on your job and supplier. The percentage is applied once to the placed volume. The fixed loss is then added before applying the supplier minimum and increment.
Can I use a different form on the same option?
The worksheet uses one shape and size per alternative across its shown marks. If the drawings use several sizes within an alternative, reconcile the individual quantities separately.
Similar Calculators
Decking Joist Layout & Board Angle Planner
Check measured deck joist spacing against two entered limits. Compare diagonal board travel, exact bay widths and an equal-split layout.
Sonotube & Concrete Tube Form Calculator
Calculate concrete bags and cubic yards for round tube forms. Add cylindrical bases, compare single or phased orders and see delivery minimums and fees.
Foundation Squaring Calculator & Rectangle Layout Planner
Find the diagonal of a planned rectangle or audit four measured corners. Compare both tape diagonals and see estimated corner moves against your target.
Deck Post Spacing Calculator & Excluded Station Layout
Find the fewest post centers across a straight documented deck run while applying the permitted gaps, candidate station grid and entered exclusion zones.
