Shed Removal Cost & Salvage Loadout Calculator

Inventory the panels, roof sections and bundles from one measured removal batch. Set aside the pieces you plan to keep on site, then see how the remaining indivisible pieces can be assigned to trips under each quote's confirmed limits.

Shed removal

Plan shed removal around whole pieces

Quote A has the lower modeled removal cost.

2 kept · 7 for removal · 286 lb · 28 ft³

Quote A

$310.00

4 modeled trips · 3 bulk lower bound

$110.00 fixed + $50.00 per trip

Quote B

$315.00

3 modeled trips · 3 bulk lower bound

$135.00 fixed + $60.00 per trip

Edit the dismantled inventory

Group pieces with matching dimensions. Measure the space they occupy in a load. Count the pieces staying on site separately.

Wall panels
Roof sections
Framing bundles
Edit Quote A limits and costs
Edit Quote B limits and costs

Pieces kept and sent by group

  • Kept on site
  • For removal
Parts retained and assigned to removalEvery row shows matching pieces in a group. The solid part is retained on site. The outlined part goes into the trip packing model.Wall panels4Roof sections3Framing bundles2
Wall panels
1 kept · 3 for removal
Roof sections
1 kept · 2 for removal
Framing bundles
0 kept · 2 for removal

Trip payload and packed space

Plotted trip mass and occupied packed-space shares for Quote AThe limits outline the available payload and space. The selected trip has a square marker. Identical trips can share a point.Packed space100%0100%Share of available payload

Trip 1 · 88 lb · 6 ft³ · 96 in longest piece

Wall panels
1
Roof sections
0
Framing bundles
1
Show both trip ledgers

Quote A

Quote A trip stock and capacity terms
TripWall panelsRoof sectionsFraming bundlesMassPacked spaceLongest piece
110188 lb6 ft³96 in
210188 lb6 ft³96 in
311084 lb10 ft³80 in
401026 lb6 ft³72 in

Quote B

Quote B trip stock and capacity terms
TripWall panelsRoof sectionsFraming bundlesMassPacked spaceLongest piece
1102118 lb8 ft³96 in
211084 lb10 ft³80 in
311084 lb10 ft³80 in

Show shed removal CSV text

How to use this calculator

  1. Enter each matching group’s whole piece count and the number staying on site. Use zero for an unused group.
  2. Enter the physical length, measured mass and estimated packed space per piece.
  3. Enter confirmed limits and money terms for two quotes covering the same removal job.
  4. Compare the exact modeled trip count with the bulk lower bound. Inspect every trip's piece mix, mass and space.
  5. Download the inventory and fitted trip ledgers as CSV.

The Formula

The mathematical logic powering this calculation is:

Use up to three groups of matching whole pieces. A group can describe equal panels, roof sections or measured bundles. Subtract the count set aside for on-site reuse. Each remaining piece retains the group's length, mass and occupied packed space. Packed space is the measured or quoted space a piece consumes in the load. It can differ from the solid volume of the material.

The volume lower bound is the total packed space divided by the usable packed space per trip, rounded up. The payload lower bound is the total measured mass divided by available payload per trip, rounded up. The larger value is a simple lower bound. It does not allocate any physical pieces.

For each quote, check whether any required piece individually exceeds the quoted longest accepted piece, payload or packed-space bounds. The computation then tests whole per-trip combinations. A trip is allowed when its mass and space totals meet the entered limits and each piece is within the entered length limit. Its longest piece is the maximum length in that load. Equality fits. Find the smallest number of such trips that removes all pieces. Among equal optimal choices, show a heavier first trip before a lighter one, then prefer greater occupied space. The total cost equals the fixed removal cost plus the trip count times the written trip price. An all-kept batch has zero trips and still shows any entered fixed charges.

Use whole counts of 0–8 per group. Enter positive values from 0.01 to 600 in, 10,000 lb and 1,000 ft³ for the applicable measurements and limits, with up to two decimals. Prices accept $0–$100,000 in cents. The exact trip count applies to this abstract packing model with one unchanged vehicle profile and comparable confirmed scope per quote. Physical arrangement, access, loading restrictions, safe towing, weight distribution and acceptance of the material require separate confirmation. The worksheet doesn't plan the dismantling operation or assign disposal requirements.

Worked Example

If you input:

  • Removal stock: Three panels after salvage, two roof sections after salvage, and two framing bundles. 286 lb and 28 ft³ in total.
  • Quote A: 96 in maximum piece length, 100 lb and 10 ft³ per trip. $110 fixed and $50 per trip.
  • Quote B: 120 in maximum length, 120 lb and 10 ft³ per trip. $135 fixed and $60 per trip.

Result:

The bulk lower bound is three trips in both quotes. Quote A needs four trips and costs $310.00. Quote B fits three trips and costs $315.00. Increasing the longest framing bundles from 96 in to 96.01 in leaves only Quote B within the entered piece-length limits.

Frequently Asked Questions

Why can the bulk lower bound be too low?

It assumes material can be split as needed. Whole panels and bundles can leave unused payload or packed space that no remaining piece fits.

Should I enter solid wood volume?

Use the packed space a whole loaded piece occupies. For irregular pieces or shared stacking, confirm a usable space estimate for the loaded orientation.

What happens when one piece is longer than the quote allows?

The worksheet reports which group exceeds the limit and withholds that quote's total for the entered whole pieces.

How does local salvage change price?

The worksheet removes the items you keep on site from the transport inventory. That can reduce required trips while leaving the entered fixed removal cost in place.

Does a mathematical fit confirm a physical load arrangement?

The model checks total packed space and payload plus the maximum single-piece length. Confirm the actual loading shape, clearances and vehicle limits for the job.

Can I price trips with different fees or accepted waste?

Use this model when all trips under an offer have the same confirmed limits and price. Separate destinations or trips with different fees need their own quote.

Similar Calculators