Compare two garage conversion proposals on a measured section. Check how a raised finished floor changes clear height and alignment with adjacent floors. See precisely how much of the modeled strip falls below your target, and review the prices each proposal includes.
Compare garage conversion heights and quotes
Find where floor buildup, headroom and doorway levels agree. See which parts of each measured section fall short, then compare written prices.
Finished height and quote comparison
Proposal A
- Matching floor levels
- No common floor level
- Area below requested height
- 144 ft²
- Minimum clear height
- 82.5 in
- Quote
- $6,940.00
Proposal B
- Matching floor levels
- 5 in only
- Area below requested height
- 0 ft²
- Minimum clear height
- 83.5 in
- Quote
- $6,596.00 known
Review the entered floor, height and transition limits before ranking prices.
Edit survey and proposals
Measured garage section
Use one reference level for all slab, ceiling and threshold elevations. Each measured profile station represents the full width of this strip.
Slab and underside stations
Start at 0 ft and end at the entered room length. Include each change in the measured profile. The section connects adjacent measurements with straight lines.
Station 1
Station 2
Station 3
Adjacent finished floors
Record each chosen transition. The two allowances measure how far the garage finish may sit below or above the adjacent level you entered.
Transition 1
Proposal A
Proposal A floor and ceiling assembly
Enter each loss of overhead height from the surveyed underside. Enter zero when that height is kept.
Proposal A written charges
Proposal B
Proposal B floor and ceiling assembly
Enter each loss of overhead height from the surveyed underside. Enter zero when that height is kept.
Proposal B written charges
Floor levels that fit the entered limits
Floor buildup and doorway levels set the lower and upper bounds. The available headroom can lower the upper bound. The thin marker is the selected finish.
Proposal A
No common floor level
- Lower bound
- 5 in
- Upper bound
- 4 in
- Selected finish
- 5 in
- Entered limits
- Review below
Lower constraint · House threshold
Upper constraint · Headroom · Station 3
The bounds are separated by 1 in.
Proposal B
5 in only
- Lower bound
- 5 in
- Upper bound
- 5 in
- Selected finish
- 5 in
- Entered limits
- All met
Lower constraint · House threshold
Upper constraint · Headroom · Station 3
Slab, floor and overhead section
Both sections use the same scale. Lines show the measured slab and the selected floor and ceiling. The dashed target is the required underside elevation above the selected floor. Hatched spans fall below the entered clear height.
- Slab
- Finish floor
- Finished underside
- Existing underside
- Height target
Proposal A
Elevation from datum · -4.525 in to 95.025 in
- Low-headroom length
- 12 ft
- Low-headroom area
- 144 ft²
- Shallowest buildup
- 2 in
- Deepest buildup
- 5 in
Below height target at 12 ft to 24 ft.
- Floor buildup · Meets entered range
- Finished height · Below entered height
- House threshold · -0.5 in relative to adjacent floor · Within allowance
Show proposal a station ledger
- 0 ft
- Height 84.5 inBuildup 5 in
- 12 ft
- Height 83.5 inBuildup 3.5 in
- 24 ft
- Height 82.5 inBuildup 2 in
Proposal B
Elevation from datum · -4.525 in to 95.025 in
- Low-headroom length
- 0 ft
- Low-headroom area
- 0 ft²
- Shallowest buildup
- 2 in
- Deepest buildup
- 5 in
- Floor buildup · Meets entered range
- Finished height · Meets entered height
- House threshold · -0.5 in relative to adjacent floor · Within allowance
Show proposal b station ledger
- 0 ft
- Height 85.5 inBuildup 5 in
- 12 ft
- Height 84.5 inBuildup 3.5 in
- 24 ft
- Height 83.5 inBuildup 2 in
Written quote details and export
Area rates apply to the entered strip of 288 ft². Included means no added price. Unpriced work keeps the complete total open.
Proposal A
- Known subtotal
- $6,940.00
- Complete quote
- $6,940.00
Show proposal a quote lines
- Raised floor
- $4,032.00
- Ceiling work
- $1,728.00
- Slab preparation
- $1,000.00
- Door transitions
- $180.00
- Other written charges
- Included
Proposal B
- Known subtotal
- $6,596.00
- Complete quote
- Pending
Show proposal b quote lines
- Raised floor
- $6,336.00
- Ceiling work
- Included
- Slab preparation
- Unpriced
- Door transitions
- $260.00
- Other written charges
- Included
Show selectable CSV text
This worksheet evaluates the entered section and quote. Measured conditions, local requirements and the proposed assembly need their own project review.
How to use this calculator
- Enter the full strip dimensions and your documented requested height.
- Enter measured slab and underside stations on the same datum. Add each adjacent doorway level and its written transition allowances.
- Enter two proposed finished floor levels, documented buildup limits and ceiling changes at the same stations.
- Read the intersection of allowable elevations and check the proposed sections. Review any area below the height target and the governing limits.
- Enter written floor, ceiling, preparation and transition charges. Download the compared section and price ledger as CSV.
The Formula
The mathematical logic powering this calculation is:
Measure one rectangular strip using a common elevation datum. Use 2–8 increasing stations, with the first at zero and last at the strip length. Each station represents the full entered width and includes both the slab surface and existing underside elevation. Between adjacent stations the worksheet interpolates a straight line. Existing floor or ceiling discrepancies across the strip width and between samples are outside this representation.
For each proposal, the finished underside equals the measured underside minus the entered ceiling loss. At a station, floor buildup equals selected horizontal finish minus slab elevation. Clear height equals proposed underside minus finish. Minimum buildup sets a lower finish bound equal to the maximum of slab elevation plus entered minimum. Maximum buildup sets an upper bound equal to the minimum of slab elevation plus entered maximum. Requested clear height caps the floor at the minimum of proposed underside minus requested headroom. Each doorway defines an independent interval with its adjacent floor elevation minus the permitted downward difference and plus the permitted upward difference.
The greatest lower bound and least upper bound define the common interval. Equal bounds give one matching elevation. Reversed bounds give no common level. The entered finish remains visible even if it misses the interval. Since each segment is linear, endpoint checks are sufficient for the modeled full-height criterion. When a segment crosses the height target, the exact linear proportion gives the start or end of its deficient run. Sum the lengths strictly below the target. Multiply by full strip width to obtain the modeled area below. Exact equality meets the entered comparison.
Enter area prices or fixed totals for the raised floor and ceiling work. Area prices multiply the full rectangular strip area. Add written slab preparation, doorway transitions and other charges. Round each extended amount to the nearest cent, with half-up ties. Included contributes no incremental amount. An unpriced item leaves the complete total open. Quotes are independent of the numeric height checks, and comparative pricing uses complete totals that meet the entered geometric constraints. The transition charge applies only when at least one transition is entered.
Strip dimensions support 1–200 ft and distances and elevations support up to three decimals. Slab, underside and finished floor elevations may be signed. The finished underside must stay above the measured slab. The comparison uses the user's height and material limits rather than adopting permit criteria. It does not evaluate local code, floor and ceiling assemblies, moisture, actual use or egress.Worked Example
If you input:
- Measured strip: 12 × 24 ft at slab elevations 0, 1.5 and 3 in. Overhead elevations are 90.5, 89.5 and 88.5 in.
- Entered thresholds: 83.5 in requested clear height. An adjacent floor at 5.5 in permits the garage level to sit up to 0.5 in below or above.
- Both finishes: 5 in. A has 1 in of ceiling loss, while B retains the current measured underside.
Result:
For A, the doorway calls for a floor at least 5 in high and headroom caps it at 4 in. Its selected finish leaves 144 ft² below the height target. A's written quote is $6,940. For B, exactly 5 in meets the entered limits, with no area below the target and $6,596 in known charges.
Frequently Asked Questions
Why can a floor that matches a doorway still miss the headroom target?
Raising a level floor reduces the height to the finished overhead. The full band requires both the doorway difference and the section height to fit their entered criteria.
What does a one-level result mean?
The highest lower limit and lowest upper limit are equal. Exactly that finish satisfies all entered geometric checks under the section interpolation.
How is the area below the target measured?
The section checks where adjacent measured points straddle the target. It interpolates the crossing and multiplies the deficient length by the entered full width.
Do I enter a doorway opening height or the adjacent floor elevation?
Enter the adjacent finished floor elevation relative to the same datum. The doorway row checks the vertical difference between the floors. Its opening and head clearance are separate.
Does this calculate material quantity or select a floor assembly?
The worksheet compares entered assembly depth against the measured section. The Floor-Leveling Compound Depth & Bag Planner covers supported fill material takeoffs.
Which garage conversion height requirement does the calculator use?
Use the height specified for your project. The calculation compares your measured finished section to that entered target. The sources describe measurement and permitting context.
Similar Calculators
Floor-Leveling Compound Depth & Bag Planner
Estimate self-leveling compound from measured floor elevations. Compare finish heights, buildup limits, geometric volume, whole bags and material costs.
Subfloor Patch Layout & Replacement Quote Planner
Compare measured subfloor damage, documented repair openings, orientation-locked sheet cuts and entered replacement quotes.
Home Addition Cost & Bid Comparison Calculator
Compare home addition bids after replacing allowances and adding excluded work. See low, base and high project budgets, reserve and cost per square foot.
Garage Door Replacement Cost & Quote Planner
Compare garage door replacement quotes by measured opening, included labor and hardware, opener and haul-away. Add known omission allowances and optional maintenance.