Natural Gas Bill Calculator & Therm Rate Comparison

Use your statement’s Ccf-to-therm factor or enter the billed therms directly. Separate commodity, tiered delivery and fixed service costs for two rate schedules. Identify the usage where the entered schedules have equal unrounded charges.

Gas tariff comparison

Compare natural gas bills from metered usage

One billing period
Plan A
Plan B
Plan A has the lower modeled gas bill.
Modeled therms
42 therms
40 Ccf × 1.05
Plan A
$56.00
42 therm baseline
Plan B
$56.20
0 therm baseline

Modeled charges across gas usage

The vertical guide marks your usage. The lines show charges before the final cent rounding.

  • Plan A
  • Plan B
$0$43.75$87.5063 therms
Equal unrounded charges in this range
  • 40 therms
  • 42.5 therms

Charges at your billed usage

Plan A

42 within baseline · 0 therms above

Service and fixed
$14.00
Gas supply
$25.20
Baseline delivery
$16.80
Above-baseline delivery
$0.00

Plan B

0 within baseline · 42 therms above

Service and fixed
$10.00
Gas supply
$25.20
Baseline delivery
$0.00
Above-baseline delivery
$21.00

Line amounts are displayed to cents. The modeled total is rounded after adding the exact amounts.

Review exact gas charges and tariff CSV

Exact modeled totals before rounding · Plan A 56 USD · Plan B 281/5 USD

How to use this calculator

  1. Choose Ccf with the bill’s conversion factor, or enter the billed therms directly.
  2. Enter the number of days covered by the statement.
  3. For both plans copy the baseline allowance, supply and delivery rates and the daily or fixed service charges. Use dollars per therm.
  4. Compare the modeled charges, inspect both cost curves and export the exact tariff worksheet.

The Formula

The mathematical logic powering this calculation is:

Billed therms equal metered Ccf times the statement’s therm factor when volume is entered. Use the documented factor for this period and meter. A Ccf is 100 cubic feet and a therm is 100,000 Btu. Enter billed therms directly when already provided.
On each rate schedule, multiply the daily baseline allowance by billing days to find the period’s cutoff. Delivery applies the baseline rate to therms up to this cutoff and the higher-block rate to the remaining usage. Supply applies its stated uniform USD/therm rate to all billed therms. Service and fixed cost equal daily charge times billing days plus the fixed charge. To represent flat delivery, enter the same rate in both delivery fields. When the schedule combines supply and delivery into one rate, enter the applicable combined rate in delivery and use zero for the separate supply line.
The estimate adds exact line amounts then rounds the total once to cents, half up. Line displays can differ by a cent from the sum. Plot corners mark where a rate’s baseline changes slope. A diamond identifies an exact unrounded equality point. A reported equality interval gives a range where charges coincide. Cent-rounded displayed equality can also occur near an unrounded crossing.
Use one billing period of 1–92 days, up to 100,000 Ccf or entered therms, and 0.01–5 therms/Ccf when converting. The worksheet covers one uniform rate schedule per plan for that period. It leaves out delivery riders, credits, taxes, seasonal rate changes, minimum bill adjustments and electric charges. Utility bills can round and apply charges differently. Compare carefully with the period and rate lines on the statement. All example terms are illustrative.

Worked Example

If you input:

  • Usage: 40 Ccf × 1.05 therms/Ccf over 30 days.
  • Plan A: 1.4 therms/day, $0.60 supply, $0.40/$0.90 tiered delivery, $0.20 daily and $8 fixed.
  • Plan B: $0.60 supply and $0.50 flat delivery, plus $10 fixed.

Result:

The bills use 42 therms. Plan A totals $56.00 and Plan B is $56.20. Their entered schedules match at 40 and 42.5 therms before rounding.

Frequently Asked Questions

Is one Ccf the same as one therm?

Ccf measures volume and a therm measures heat energy. The bill’s conversion factor gives thermal energy for that measured volume.

Does every therm move to the higher rate above the baseline?

In the modeled tiers the baseline usage retains the lower-block rate. Only usage above the period’s cutoff enters the higher block.

Why might the estimated gas bill differ from my statement?

Use the same billing days, usage, factor and line rates first. Rebates, fees, rate changes, credits, taxes and utility-specific rounding can create remaining differences.

What does one plotted equality point mean?

At that usage both entered schedules produce the same unrounded bill. The rounded totals can still coincide at some nearby values.

Similar Calculators