Water & Wastewater Utility Bill Calculator

Compare two meter-use scenarios under the same entered utility bill. See what goes to water and wastewater, how a documented sewer-volume cap changes the bill, and the exact whole-gallon boundary for a chosen budget.

Metered utility bill comparison

Compare water and wastewater bills

Edit water use, charges and budget
Water charges
Wastewater charges

Both bills meet the entered budget.

Bill A · 5 kgal

$67.00

$33.00 below budget

Water
$24.00
Wastewater
$43.00
Wastewater billed volume
5 kgal

Bill B · 10 kgal

$100.00

Exactly at budget

Water
$52.00
Wastewater
$48.00
Wastewater billed volume
6 kgal

Whole-gallon budget boundary

10,000 gal at $100.00

Next gallon 10,001 gal at $100.01

Inspect modeled bills by water use

Modeled bill by water use

0 to $150.00

0 kgal11.25 kgal
  • Combined bill
  • Water
  • Wastewater
  • $100.00 budget
  • Selected bill

Bill A · 5,000 gal

$67.00 total · $33.00 below budget

Water
$24.00
Wastewater
$43.00

Water blocks 4,000 gal · 1,000 gal · 0 gal

Wastewater billed on 5,000 gal

Review the exact utility bill ledger
Water use and modeled charges
Modeled billWater use (gal)Water blocks (gal)Wastewater (gal)Water chargeWastewater chargeTotal
Bill A50004000 / 1000 / 05000$24.00$43.00$67.00
Bill B100004000 / 4000 / 20006000$52.00$48.00$100.00
Fixed charges00 / 0 / 00$12.00$18.00$30.00
Last within range100004000 / 4000 / 20006000$52.00$48.00$100.00
First above budget100014000 / 4000 / 20016000$52.01$48.00$100.01

How to use this calculator

  1. Enter both metered-use scenarios in thousands of US gallons and set a dollar budget.
  2. Copy fixed charges and water tier cutoffs and rates for one billing period.
  3. Choose actual water use or a documented cap as the wastewater volume basis. Enter the wastewater rate.
  4. Compare water and sewer charges, the last qualifying whole-gallon use and the first bill above your budget.
  5. Inspect a plotted use level and download the exact ledger.

The Formula

The mathematical logic powering this calculation is:

Enter one billing period’s fixed water and wastewater charges, tier cutoffs and rates in USD per thousand US gallons. A kgal is 1,000 US gallons. Water meters A and B are alternative use levels for the same tariff. The first block takes up to the first cutoff, the second takes additional gallons up to the second cutoff, and the third receives the remainder. Equal cutoffs make the middle block zero. Use equal rates across blocks for a flat water rate.

Wastewater volume equals current water use in actual-use mode. In capped mode it is the smaller of current use and the entered documented cap. Enter the cap that applies to this period from your bill or utility, such as a published winter-use benchmark already calculated for your account. The worksheet does not derive that benchmark.

Sum the three water volume charges and round that subtotal to cents once, half up. Round the wastewater volume charge separately, half up. Add each fixed charge to its rounded volume subtotal and combine both services to get the modeled bill. The export retains exact gallons and cents. The plotted line connects selected exact bills, including available cutoffs and the budget boundary. The actual modeled bill changes in cent steps as the metered volume grows.

Nonnegative rates make the total nondecreasing on the supported whole-gallon grid. If fixed charges alone meet the budget, find the largest whole gallon count whose rounded bill still meets it, and show the next gallon’s bill when it is within range. Equality qualifies. If the total at 1,000,000 gallons still meets the goal, report that checked limit. A budget below the fixed charges has no qualifying volume.

Volumes and cutoffs accept 0–1,000 kgal with up to three decimal places. Fixed charges and budget accept USD 0–1,000,000 with cents. Rates accept USD 0–10,000/kgal with up to four decimals. Example terms are illustrative. Use the billing period and charges shown on your statement. Taxes, credits, stormwater fees, separate sewer meters, tier proration and utility-specific rounding can alter a real bill.

Worked Example

If you input:

  • Current water use: 5 and 10 kgal
  • Water charges: USD 12 fixed. USD 2/kgal through 4 kgal, USD 4 through 8 kgal and USD 8 above.
  • Wastewater charges: USD 18 fixed plus USD 5/kgal, capped at 6 kgal.
  • Budget: USD 100

Result:

Bill A is $67 and Bill B is exactly $100. At 10,001 gallons the next bill is $100.01. The last whole-gallon use that meets the budget is 10,000 gallons.

Frequently Asked Questions

Why does the wastewater bill stop rising above the cap?

In capped mode only the wastewater volume charge stops rising. Water still uses the meter volume and applicable water blocks.

Where does the cap number come from?

Use the benchmark or cap already documented by your utility for the period. Its definition and the season when it applies can vary.

Why enter two cutoffs instead of two block widths?

Cutoffs are cumulative readings on the same meter. A first cutoff of 4 kgal and a second of 8 kgal give the middle block a width of 4 kgal.

What if zero consumption is already above my budget?

The fixed charges alone exceed it, so the worksheet has no qualifying volume.

Why compare the last gallon with the next one?

Cent rounding creates plateaus. The last qualifying gallon is the furthest volume within the entered whole-gallon model, including every equal-price point on its plateau.

Similar Calculators