Interior Door Installation Cost & Retrofit Fit Planner
Compare two written options for one ordinary interior doorway. Screen a slab against the existing finished jamb and hardware records, then screen a prehung unit against the measured rough opening and wall depth. Rank the prices when both proposals cover the same finished work and meet the entered checks.
Compare an interior slab with a prehung door
Check the measurements and supplier limits for each option before comparing written prices.
The slab option meets the checks and costs less.
Prehung minus slab $225.00.
Reuse jamb with a slab
$500.00
Written total · Finished jamb basis
Meets the entered checks
Replace with a prehung unit
$725.00
Written total · Rough framing basis
Meets the entered checks
Inspect clearance at each measured station
Finished jamb readings minus the ordered slab dimensions.
- Top · 0.1875 in · Within limits
- Middle · 0.21875 in · Within limits
- Bottom · 0.25 in · Within limits
- Hinge side · 0.375 in · Within limits
- Center · 0.4375 in · Within limits
- Latch side · 0.5 in · Within limits
Edit slab measurements and limits
Finished jamb measurements and inches as decimals or fractions, for example 30 3/16.
Edit prehung measurements and limits
Rough framing measurements and inches as decimals or fractions, for example 30 3/16.
Edit slab hardware and prehung depth
Edit written quote lines
Use each written cost once. Enter zero for amounts already included on another line.
Review exact clearance and prep calculations
Slab clearances
- Top width · 483/16 − 30 = 3/16 in.
- Middle width · 967/32 − 30 = 7/32 in.
- Bottom width · 121/4 − 30 = 1/4 in.
- Hinge side height · 643/8 − 80 = 3/8 in.
- Center height · 1287/16 − 80 = 7/16 in.
- Latch side height · 161/2 − 80 = 1/2 in.
Prehung clearances
- Top width · 65/2 − 32 = 1/2 in.
- Middle width · 261/8 − 32 = 5/8 in.
- Bottom width · 131/4 − 32 = 3/4 in.
- Hinge side height · 165/2 − 82 = 1/2 in.
- Center height · 661/8 − 82 = 5/8 in.
- Latch side height · 331/4 − 82 = 3/4 in.
Slab prep
Factory-prepped slab.
0.125 in head gap fits the measured height clearance.
Allowed absolute prep offset 1/32 in.
- Hinge 1 · 7 − 7 = 0 in · Within tolerance.
- Hinge 2 · 1281/32 − 40 = 1/32 in · Within tolerance.
- Hinge 3 · 73 − 73 = 0 in · Within tolerance.
- Latch center · 37 − 37 = 0 in · Within tolerance.
Prehung jamb depth
Quoted jamb depth 37/8 in. Allowed absolute difference 1/16 in.
- Hinge side · 37/8 − 37/8 = 0 in · Within tolerance.
- Latch side · 75/16 − 37/8 = 1/16 in · Within tolerance.
Show door fit CSV text
How to use this calculator
- Enter the finished jamb and rough framing width and height measurements at the indicated stations.
- Enter the ordered slab size and actual outside size of the prehung unit, with each supplier's applicable clearance ranges.
- Copy the written slab preparation basis. For factory prep, enter the corresponding hinge and latch locations and the planned head gap.
- Enter prehung jamb depth, both wall readings, the documented tolerance, and each written quote price.
- Review exactly which measurements meet the limits. Confirm matching finished work before comparing the eligible prices.
The Formula
The mathematical logic powering this calculation is:
For the slab, use the measured finished jamb and the slab's actual ordered width and height. For the prehung unit, use the rough framing and the assembly's actual outside dimensions. For every width and height station, subtract the applicable ordered size from the measured opening. The result is a total clearance across that axis. Compare each result to the independently entered supplier minimum and maximum for that option. Equality passes. A total width or height clearance represents the combined available space across the axis.
For the prehung unit, compare each entered wall depth with the quoted jamb depth. The absolute difference must be at or below the entered depth tolerance. For a factory-prepped slab, use the same vertical features and reference points. Add the entered head gap to each measurement down from the slab top to express it from the finished jamb head. Subtract the existing point's measured distance down from the head. Compare the absolute difference with the entered tolerance. The head gap must fit in the available measured vertical clearance. Use the count of corresponding hinges in the records. A quote with on-site prep already confirmed lets the check proceed on that basis; unclear prep withholds price ranking.
Total each written quote from its independently entered product, labor, hardware/prep, and finish/removal prices. Use zero when a line has already been counted. The lower written total appears only if both entered checks pass and both quotes cover the same finished work, which may be achieved by different scopes such as reusing or replacing the jamb. The example uses illustrative price and tolerance entries. Fractions and mixed numbers such as 30 3/16 are accepted.
This is a document and measurement comparison for ordinary non-rated interior doors. Confirm handing, hardware and strike compatibility, stop position, squareness, plumb, floor finish and all applicable product details with the supplier. Use separately obtained project and product measurements.Worked Example
If you input:
- Slab: Actual 30 × 80 in, with written finished-jamb clearance ranges and factory prep.
- Prehung unit: Actual outside size 32 × 82 in, with independently entered rough opening and wall-depth limits.
- Written figures: $500 slab and $725 prehung, same confirmed finished work.
Result:
Both options meet the entered paper checks, and the slab costs $225.00 less. Reducing the top finished-jamb width to 30 1/8 in leaves 1/8 in total width clearance, below the slab's entered 3/16 in minimum.
Frequently Asked Questions
What is the difference between a slab and a prehung door?
A slab is the door panel itself. A prehung unit provides the panel hung in a frame. Their ordered dimensions apply to different measured openings.
Why ask for several width and height measurements?
The available opening can change along its edges. Subtract the product size at each station and check the minimum and maximum separately.
What is total width clearance?
It is opening width minus the ordered slab or assembly width. It does not allocate that total between left and right edges.
Why adjust hinge offsets by the head gap?
Factory locations are measured down from the slab top. Adding the planned gap converts them to the same vertical starting point as the existing jamb measurements.
Why can a price be visible without a lower-price result?
The written total is still useful as a record. Ranking requires matching scope and acceptable measured conditions for both alternatives.
Does passing these checks establish that a door can be installed?
The result screens the entered measurements and supplier thresholds. Verify product details, opening conditions and any project requirements separately.
Similar Calculators
Cabinet Layout Fit & Installation Quote Planner
Compare kitchen cabinet installation quotes and fit. Plot open drawers and appliances, find clearance conflicts, and inspect the aisle between opposing runs.
Garage Door Replacement Cost & Quote Planner
Compare garage door replacement quotes by measured opening, included labor and hardware, opener and haul-away. Add known omission allowances and optional maintenance.
Window Replacement Cost & Quote Calculator
Compare window replacement quotes by opening, installation, allowances and rebates. Explore optional heating savings, payback and net present value with charts and CSV.
Crown Molding Calculator & Installation Quote
Compare crown molding miter and bevel angles, whole-stick cut layouts and installation quotes for the same runs and walls.
Sound Transmission Loss & Partition Gap Calculator
Compare wall and door sound transmission with measured gap areas. See the power through each path and the allowable modeled gap by band.
Pocket Door Size, Travel & Clear Passage Calculator
Compare pocket door kits by required rough opening, wall thickness, leaf travel, usable pocket depth and finished clear passage.