Floor-Leveling Compound Depth & Bag Planner
Measure surface elevations on a rectangular grid relative to one datum. Compare two level finish planes to see the deepest point, the modeled area and volume, which cells exceed your entered product depth limits, and how coverage and reserve affect a whole-bag order.
Compare measured floor depths and bag orders
Use one measured floor to compare two finish elevations, material depth limits and whole-bag quotes.
Example yields come from the linked product references. Measurements and prices are illustrative. Enter the buildup limits and coverage for your specified product and floor.
120 ft² measured floor
Offer A
5–6 bags
$180.00–$216.00
- Geometric fill
- 2.5 ft³
- Buildup
- 0.125–0.625 in
- Added reserve
- 0 ft³
- Planned order volume
- 2.5 ft³
Offer B
4 bags
$168.00
- Geometric fill
- 2.5 ft³
- Buildup
- 0.125–0.625 in
- Added reserve
- 0 ft³
- Planned order volume
- 2.5 ft³
Offer B costs less across both yield estimates.
Offer A 5–6 bags. Offer B 4 bags. Offer B costs less across both yield estimates.
Measured floor and finish planes
Shared elevation scale from -0.5 in to 0.125 in. X runs from zero to 12 ft.
- Measured floor
- Offer A · 0.125 in
- Offer B · 0.125 in
Both offers select the same finish elevation.
Show selected survey row
| X (ft) | Floor (in) | A fill (in) | B fill (in) |
|---|---|---|---|
| 0 | 0 | 0.125 | 0.125 |
| 6 | -0.5 | 0.625 | 0.625 |
| 12 | 0 | 0.125 | 0.125 |
Buildup limit maps
Each cell shows whether its measured corners meet the entered limits. X increases to the right and Y increases downward.
Offer A
Within entered depth limits
Finish band under entered limits · 0.125 to 1 in
- Within limits · 4
0 sampled points too shallow · 0 too deep
Offer B
Within entered depth limits
Finish band under entered limits · 0.125 to 1 in
- Within limits · 4
0 sampled points too shallow · 0 too deep
Edit survey stations and elevations
Enter distances from the same corner and signed heights relative to one datum. The last distance on each axis defines the measured footprint.
Edit Offer A finish, depth and yield
Edit Offer B finish, depth and yield
Show measured cells and fill quantities
| Cell | Area (ft²) | Mean (in) | Fill (ft³) |
|---|---|---|---|
| Y1 X1 | 30 | 0.25 | 0.625 |
| Y1 X2 | 30 | 0.25 | 0.625 |
| Y2 X1 | 30 | 0.25 | 0.625 |
| Y2 X2 | 30 | 0.25 | 0.625 |
| Cell | Area (ft²) | Mean (in) | Fill (ft³) |
|---|---|---|---|
| Y1 X1 | 30 | 0.25 | 0.625 |
| Y1 X2 | 30 | 0.25 | 0.625 |
| Y2 X1 | 30 | 0.25 | 0.625 |
| Y2 X2 | 30 | 0.25 | 0.625 |
The cell name identifies its lower-distance corner.
Export results
Download floor leveling comparison CSVShow selectable CSV text
How to use this calculator
- Enter X and Y station distances from zero. Use the last X and Y distances as the measured rectangle’s total sides.
- Enter the elevation relative to your chosen datum at each grid intersection. Negative readings are below that datum.
- Enter each proposed finish elevation and the depth limits that apply to the specified work. Compare the finished planes with the survey line and check the depth map.
- Enter the coverage range per bag and its stated reference thickness, the material reserve, and your quoted price per bag.
- Compare geometric volume with the planned order and download the complete measured cells and two-offer estimate.
The Formula
The mathematical logic powering this calculation is:
All station distances start at zero on the same rectangular work area, and may be unevenly spaced. Enter measured elevations relative to a single datum, with positive values above it. Each proposal chooses a horizontal finish elevation F. Buildup at every survey point equals F minus its measured elevation. Calculate each rectangular cell using bilinear interpolation of the four measured heights. The mean of the four corner depths equals the area-average of that interpolated cell. Multiply the mean depth in inches by cell area in square feet. Sum cell contributions and divide by 12 for cubic feet. More measurements can reveal surface variation between existing stations.
A negative buildup means the entered plane lies below a measured point. The geometry stays visible and the fill calculation and purchase wait for a supported fill-only plane. The minimum and maximum modeled buildups occur at measured vertices. Check both against the entered depth limits, including equality. The finish elevation band under those limits is highest measured elevation plus minimum allowed depth through lowest measured elevation plus maximum allowed depth. The band is empty when the lower end exceeds the upper end. Positive geometric fill remains visible when the product depth check fails, and ordering waits.
Enter the product's low and high area coverage per bag and the common reference thickness for those coverage numbers. Each nominal yield equals the entered area times that reference thickness, in square-foot inches per bag. This is a volume interpolation from the entered yield. Increase geometric volume by your optional material reserve percentage before dividing by a bag yield. Round up for whole bags. The more generous yield gives the lower whole-bag count. The less generous yield gives the conservative count. Costs are bag count times the entered USD price. Site conditions and the actual product can change coverage.
The default coverage references are CUSTOM LevelQuik RS at 46–48 ft² per 50-lb bag at 1/8 in and ARDEX K 15 at 30 ft² per 55-lb bag at 1/4 in. CUSTOM lists up to 1.5 in thickness. The default uses an entered illustrative concrete-project minimum of 1/8 in for this offer. ARDEX lists 1/8 to 1.5 in neat and gives a nominal leveling thickness of 1/4 in. Use the applicable depth and coverage limits in your project documentation. The method compares entered geometry and quantity; it does not determine product or substrate suitability, preparation, aggregate mixes, tapering, load or installation requirements.
Use 2–6 stations on each axis, at 0–200 ft, in strictly increasing order. Measured and finish elevations are −24 to +24 in, entered buildup limits 0–12 in, bag areas 1–1,000 ft², reference thickness .01–12 in, reserve 0–50%, and bag price $0–$100,000. Dimensions and percentage accept up to three decimals, USD price accepts cents. Exact arithmetic is used at bag-count thresholds.Worked Example
If you input:
- X stations (ft): 0, 6 and 12
- Y stations (ft): 0, 5 and 10
- Surface elevations (in): 0 at the eight boundary points and −0.5 at the center
- Finish elevation and depth limits: 0.125 in finish and 0.125–1.5 in entered buildup limits for both
- Offer A coverage and price: 46–48 ft² per bag at 0.125 in; $36 per bag, 0% reserve
- Offer B coverage and price: 30 ft² per bag at 0.25 in; $42 per bag, 0% reserve
Result:
The 120 ft² floor has 0.125–0.625 in of modeled buildup under both offers. Average buildup is 0.25 in. The resulting 2.5 ft³ needs 5–6 bags at $180.00–$216.00 for Offer A and four bags at $168.00 for Offer B.
Frequently Asked Questions
Why can equal floor areas need different amounts of leveler?
Low and high areas require different fill depths under the same finish plane. The planner multiplies each surveyed rectangular cell by its own modeled mean buildup.
What does a negative measured elevation mean?
The point is below the chosen common datum. Buildup is a separate result. A negative buildup means the proposed finish plane lies below that existing surface point, so the planner holds the order.
What if the deepest point exceeds the product's entered depth limit?
The geometric quantity stays available when the plane is above the surveyed surface, but a bag estimate waits. The finish band shows whether any horizontal plane could satisfy both entered bounds with those measurements.
Can I estimate coverage from a single value on the bag?
Yes. Use the same number for both coverage endpoints and copy the stated reference thickness. With a range, the material order uses both ends.
How is reserve calculated?
Reserve adds a selected percentage to the geometric volume before whole bags are rounded. The measured geometry and buildup do not change.
How precise is the estimate between survey points?
Within each cell the model interpolates from four measured corners. It cannot see ridges or pits between the stations. Use a denser grid where the surface varies.
Similar Calculators
Concrete Slab Calculator
Estimate concrete slab volume, cubic yards, bag count, waste allowance, and material cost.
Plank Flooring Layout & Cost Calculator
Compare plank flooring layouts, staggered rows and compatible offcut reuse. Visualize cuts, check entered installation limits, estimate whole packs and project costs.
Epoxy Flooring System & Cost Planner
Compare epoxy flooring costs, coverage ranges and whole-kit purchases. Plan separate coating layers, surplus material, preparation and labor with exact ledgers.
Subfloor Patch Layout & Replacement Quote Planner
Compare measured subfloor damage, documented repair openings, orientation-locked sheet cuts and entered replacement quotes.
Garage Conversion Floor, Headroom & Quote Planner
Compare garage conversion quotes, finished floor levels and headroom. Check where measured slab, ceiling and doorway constraints agree.