Subfloor Patch Layout & Replacement Quote Planner
Mark the affected area and enter eligible lines from your documented repair plan. Compare two rectangular openings and see where support lines, installed joints and usable stock dimensions change the number of sheets and the quote.
Compare subfloor openings, panels and quotes
See how documented support lines and stock dimensions change the floor opened, panels cut, and complete price.
Example dimensions and quotes are illustrative. Enter documented eligible lines, usable panel dimensions and written costs for your own scope.
19.79167 ft² marked damage
Proposal A
$408.00
- Opened area
- 32 ft²
- Extra floor opened
- 12.20833 ft²
- Installed panels
- 2
- Stock sheets
- 2
Proposal B
$401.00
- Opened area
- 32 ft²
- Extra floor opened
- 12.20833 ft²
- Installed panels
- 4
- Stock sheets
- 3
Proposal B is $7.00 lower for the entered scope.
Proposal A $408.00. Proposal B $401.00. Proposal B is $7.00 lower for the entered scope.
Damage, supports and patch boundaries
X runs across the joists. Y runs along them. The maps share one scale and show the support lines documented in the repair scope.
- Marked damage
- Proposed opening
- Documented support
- Panel seam
- Opening width across X
- 64 in
- Opening length along Y
- 72 in
- Installed panel area
- 32 ft²
- Installed joint space
- 0 ft²
- Opening width across X
- 64 in
- Opening length along Y
- 72 in
- Installed panel area
- 32 ft²
- Installed joint space
- 0 ft²
Stock sheet layouts
Each quote uses one of two fixed cut patterns. Blue rectangles are installed panels, dashed rectangles are remnants, and narrow red bands show saw loss.
Proposal A
X-first in quote · Area-only bound 1 sheet.
| Pattern | Sheets | Saw loss (ft²) |
|---|---|---|
| X-first | 2 | 0 |
| Y-first | 2 | 0 |
- P1 · 64 in × 48 in
- Sheet saw loss
- 0 ft²
- Sheet remnant
- 10.66667 ft²
Proposal B
X-first in quote · Area-only bound 2 sheets.
| Pattern | Sheets | Saw loss (ft²) |
|---|---|---|
| X-first | 3 | 0 |
| Y-first | 3 | 0 |
- P1 · 48 in × 48 in
- Sheet saw loss
- 0 ft²
- Sheet remnant
- 0 ft²
Edit damage and documented support lines
Use one datum for the damage and eligible coordinates. Enter lines documented for the full patch. Keep uncertain support outside the entered set.
Edit Proposal A opening and quote
Edit Proposal B opening and quote
Show installed pieces and cost ledger
| Piece | Width (in) | Length (in) |
|---|---|---|
| P1 | 64 | 48 |
| P2 | 64 | 24 |
| Piece | Width (in) | Length (in) |
|---|---|---|
| P1 | 48 | 48 |
| P2 | 16 | 48 |
| P3 | 48 | 24 |
| P4 | 16 | 24 |
| Quote line | Proposal A | Proposal B |
|---|---|---|
| Stock sheets | $84.00 | $93.00 |
| Opened-area labor | $224.00 | $208.00 |
| Other quoted work | $100.00 | $100.00 |
| Entered total | $408.00 | $401.00 |
Export results
Download subfloor comparison CSVShow selectable CSV text
How to use this calculator
- Enter the marked damage boundaries and the documented support lines measured from one datum.
- Choose the nearest enclosing supports or enter the four documented lines for each proposed opening.
- Enter the usable stock size in the documented direction, installed joint gap and actual saw kerf.
- Compare both cut patterns and inspect the physical pieces on a sheet. Enter written costs per sheet, per square foot opened and for other work.
- Compare the complete proposals and export the measurement, installed panels, stock layouts and quote ledger.
The Formula
The mathematical logic powering this calculation is:
Enter documented eligible X and Y support coordinates in one frame. X runs across the joists and Y runs along them. The nearest opening chooses the closest eligible line on or outside the marked damage at each edge. An entered opening must enclose the damage and use exact eligible coordinates. The marked and opened areas use their rectangular dimensions in inches divided by 144. Extra opening equals opened area minus the marked area.
Each proposal takes effective stock dimensions oriented to the documented product and repair scope. For a possible piece between two eligible coordinates, subtract one half of the entered field joint gap per interior edge. The opening perimeter has no added gap. The axis solver considers all forward supported intervals and minimizes the number of intervals that fit the entered stock face and keep a positive cut. For a tie it chooses the farther next seam. Cross the X and Y intervals to obtain rectangular installed pieces. Installed panel area plus joint space equals the opened area. The model assumes each eligible line can serve the entire proposed patch. Enter only lines documented as eligible under the repair scope.
Pack the installed pieces into the entered usable rectangular stock with rotations locked. The shared Plywood model supplies area-ranked X-first and Y-first guillotine patterns. Each split reserves the entered saw kerf in the stock. The installed joint gap describes space between pieces in the floor. Saw kerf describes material removed in the sheet. The default policy compares the two feasible patterns by whole sheets, then cut count, with X-first as the final tie-break. Each pattern reports an area-only lower bound. Its sheet count is proven only where a feasible pattern reaches that bound. Pieces cut after applying the gap must fit in the entered orientation.
Cost equals selected whole sheets times quoted sheet price, plus the opened area before joint gaps times the quoted labor rate, plus other entered costs. The labor line rounds half up to cents. Quotes use amounts you enter. The two examples show estimated scope and prices, with no default material or service pricing.
Geometry accepts 2–24 documented support coordinates on each axis, 0–500 in in strictly increasing order, stock dimensions 1–144 in and joint gap and kerf each 0–0.5 in. Inputs accept up to three decimals. Half of a joint gap retains an exact 0.0005 in step. Each proposal supports up to 36 installed pieces and 12 distinct locked sizes. Prices use up to two decimals. Sheet price and per-area labor can be 0–100,000 USD and fixed amount 0–1,000,000 USD.
The APA references distinguish strength axis, edge support, and manufacturer-specific spacing. This planner uses your documented orientation, eligible repair lines and usable stock, without assigning material strength, span ratings, fastener schedules, moisture suitability or structural approval.Worked Example
If you input:
- Marked damage: X 18–75 in and Y 20–70 in
- Documented X lines: 0, 16, 32, 48, 64, 80 and 96 in
- Documented Y lines: 0, 24, 48, 72 and 96 in
- Proposal A: Nearest supports, 96 × 48 in usable stock, $42 per sheet, $7 per ft² opened, $100 other
- Proposal B: Nearest supports, 48 × 48 in usable stock, $31 per sheet, $6.50 per ft² opened, $100 other
- Joint and stock losses: 0 in field joint gap and 0 in saw kerf for this arithmetic example
Result:
Marked damage is 19.79167 ft². Both nearest openings span X 16–80 in and Y 0–72 in. Each opens 32 ft², or 12.20833 ft² extra. Proposal A uses two sheets and totals $408.00; B uses three sheets and totals $401.00. A larger documented opening in the expanded example raises B to four sheets and $570.67.
Frequently Asked Questions
Why does opening the floor expose more area than the visible damage?
The marked rectangle can end between documented eligible lines. The nearest mode expands its edges to the closest lines that enclose it. The highlighted extra area shows that difference.
Which support coordinates should I enter?
Use lines documented as eligible for opening boundaries and seams in the repair scope. The planner treats each entered line as eligible along the full patch and does not identify hidden supports or evaluate their condition.
How are installed joint gaps and saw kerf different?
The field joint gap moves each interior piece edge away from its seam center by half the stated gap. The stock kerf changes how the finished pieces fit and how much stock is removed during cutting.
Can panel pieces rotate to fit a smaller sheet order?
The pieces retain their entered axes. Enter the usable X and Y stock sizes in the orientation documented for your product and repair.
Do the tested patterns guarantee the fewest sheets or cuts?
The worksheet compares two fixed feasible cut patterns. When a pattern reaches the area-only lower bound, that count is minimal under the entered constraints. Otherwise the sheet count describes the shown plan.
Why can the proposal with more sheets have a lower quote?
The sheet rate and the labor per opened square foot can differ between quotes. The ledger shows how the selected stock count, measured area and other costs combine.
Similar Calculators
Plywood Cut Planner
Plan rectangular plywood cuts with kerf and rotation constraints. Compare eight sheet layouts and inspect parts, cuts and remnants.
Decking Joist Layout & Board Angle Planner
Check measured deck joist spacing against two entered limits. Compare diagonal board travel, exact bay widths and an equal-split layout.
Plank Flooring Layout & Cost Calculator
Compare plank flooring layouts, staggered rows and compatible offcut reuse. Visualize cuts, check entered installation limits, estimate whole packs and project costs.
Floor-Leveling Compound Depth & Bag Planner
Estimate self-leveling compound from measured floor elevations. Compare finish heights, buildup limits, geometric volume, whole bags and material costs.
