Epoxy Flooring System & Cost Planner
Build a complete floor-coating purchase plan from measured floor zones and actual supplier assumptions. Compare systems with separate primer, coating and topcoat layers, each with its own coverage range, number of coats, extra material allowance, mixed-kit yield and kit price. See how full-kit rounding changes project costs and leftover material, then add preparation, labor and other fixed costs. Lower and upper demand scenarios show where a larger kit saves money and where that advantage can reverse. Exact layer ledgers and CSV retain the quantities behind each chart. Examples are hypothetical, not market estimates, product endorsements or installation specifications. This planner does not determine product compatibility, substrate suitability, mixing ratios, curing times or taxes.
Plan the layers. See the whole-kit cost.
Compare complete floor-coating systems, expose coverage uncertainty and see how kit sizes change your purchase.
50 m² net floor. Selected system cost range USD 1,040 to USD 1,140.
Edit floor zones, systems and coating layers
Compare complete coating systems for the same floor. Enter actual supplier coverage, full mixed-kit yield and prices. The examples are hypothetical. This planner does not determine product compatibility, substrate moisture suitability, mixing instructions or curing times.
All costs use this label. Changing it does not convert money. Use one currency throughout.
Floor zones
Enter non-overlapping measured areas. Every layer in every alternative covers the same combined net floor. Deduct permanent uncoated areas in the same unit as the gross area.
Complete coating systems
Build an alternative from its primer, coating and topcoat layers. Each layer is a separate purchase; leftover material is never transferred between layers. Compare equivalent project scopes yourself.
Use your supplier or scenario name, up to 100 characters.
Applied to net square metres even when floor areas are entered in square feet. Avoid counting the same preparation labor again below.
Total person-hours for this system. Exclude labor already included in preparation or other costs. Remains charged at zero area if entered.
Your cost per person-hour. No staffing, local wage or payroll rules are inferred.
Added once per system, including at zero area. Enter any intended equipment, delivery or other costs not already included. No tax or fees are added automatically.
Such as Primer, Base coat or Topcoat. Keep distinct products as separate layers.
Whole number from 1 to 20. Each coat uses this layer’s entered coverage range. If coverage differs between coats, use separate layers.
Positive, up to 1,000,000. Lower coverage uses more material. Copy the range and its conditions from the actual product data; do not enter area per kit here.
At least lower coverage, up to 1,000,000. Higher coverage uses less material. Enter equal bounds for a single coverage assumption.
From 0 to 100, added to theoretical demand. Do not count the same allowance twice if the supplied coverage already includes it.
Positive, up to 1,000,000. Combined usable yield of the entire kit, not resin-only or hardener-only volume. Whole kits are purchased; this is not permission to split or mix partial kits.
Nonnegative, up to 1,000,000,000. Use the price for the same complete kit yield entered above.
Such as Primer, Base coat or Topcoat. Keep distinct products as separate layers.
Whole number from 1 to 20. Each coat uses this layer’s entered coverage range. If coverage differs between coats, use separate layers.
Positive, up to 1,000,000. Lower coverage uses more material. Copy the range and its conditions from the actual product data; do not enter area per kit here.
At least lower coverage, up to 1,000,000. Higher coverage uses less material. Enter equal bounds for a single coverage assumption.
From 0 to 100, added to theoretical demand. Do not count the same allowance twice if the supplied coverage already includes it.
Positive, up to 1,000,000. Combined usable yield of the entire kit, not resin-only or hardener-only volume. Whole kits are purchased; this is not permission to split or mix partial kits.
Nonnegative, up to 1,000,000,000. Use the price for the same complete kit yield entered above.
Required blanks remain invalid. Enter zero explicitly for costs or allowances that do not apply. Except areas and whole coat counts, inputs accept up to six decimal places. Preparation rates, labor inputs and fixed costs are nonnegative and capped at 1,000,000,000. Coverage scenarios are not confidence intervals or guaranteed installation costs.
The complete purchase, not just the liquid
These endpoints reflect your coverage range, not probabilities or a contractor quote. Lower coverage needs more material. Prices and coverage are supplied assumptions; no taxes, omitted work or local rates are inferred.
Compare the full cost range
Lowest lower endpoint: Larger kits. Lowest upper endpoint: Smaller kits.
No uniquely cheapest system is established across the entered ranges. Overlapping or touching intervals remain uncertain; endpoint rankings alone do not prove a winner.
Common scale: 0 to USD 1,150. Blue line runs from lower to upper cost; endpoint markers remain visible for equal values. Exact totals appear in the comparison table.
Smaller kitsUSD 1,040 – USD 1,140
Larger kitsUSD 970 – USD 1,150
What goes on the floor, and what is left?
Smaller kits · higher demand scenario. Common scale: 0 to 15 mixed liters. Solid blue is required material including allowance; the outlined remainder is purchased surplus above that demand. Surplus stays with its own layer.
primer3 whole kits · 15 L purchased
Required 11 L · surplus 4 L. Small nonzero quantities may appear as exact fractions; very small chart segments can be subpixel.
topcoat3 whole kits · 15 L purchased
Required 13.75 L · surplus 1.25 L. Small nonzero quantities may appear as exact fractions; very small chart segments can be subpixel.
Where the selected system’s cost goes
Higher demand total: USD 1,140. Order: solid blue kits, purple outline preparation, dashed amber labor, grey outline other fixed costs.
- Coating kits: USD 750
- Preparation: USD 100
- Labor: USD 240
- Other fixed costs: USD 50
Entered labor and fixed costs remain even at zero area. Preparation is area-based. Do not count the same labor twice.
Exact system comparison
| System | Kits cost, low | Kits cost, high | Preparation | Labor | Other fixed | Total, low | Total, high |
|---|---|---|---|---|---|---|---|
| Smaller kits | 650 | 750 | 100 | 240 | 50 | 1040 | 1140 |
| Larger kits | 580 | 760 | 100 | 240 | 50 | 970 | 1150 |
Exact layer purchase ledger
Smaller kits. Each row is a separate layer and demand scenario. Effective area includes coats and extra allowance; it is not additional measured floor area.
| Layer | Demand | Effective area | Required L | Whole kits | Purchased L | Surplus L | Kit cost |
|---|---|---|---|---|---|---|---|
| primer | Lower | 55 | 55/8 | 2 | 10 | 25/8 | 200 |
| primer | Higher | 55 | 11 | 3 | 15 | 4 | 300 |
| topcoat | Lower | 55 | 11 | 3 | 15 | 4 | 450 |
| topcoat | Higher | 55 | 55/4 | 3 | 15 | 5/4 | 450 |
Save your coating plan
Export full inputs, both coverage scenarios, exact quantities and costs. The export contains all systems, regardless of the selected chart. Verify current product instructions and suitability separately.
How to use this calculator
- Load Compare kit sizes example or Just over one kit example, then open Edit floor zones, systems and coating layers. Set the currency label for all prices.
- Enter each non-overlapping gross floor area and uncoated deduction. Select square metres or square feet; both quantities convert together exactly.
- Create each complete coating system with preparation cost per square metre, additional person-hours, hourly cost and other fixed costs. Avoid counting preparation labor twice.
- For each layer enter its coverage bounds in square metres per mixed liter, whole coat count, extra allowance, full mixed-kit yield and price. Use actual supplier data for the intended surface and application conditions.
- Compare cost intervals, choose a system and demand scenario, then inspect required and purchased material, surplus and exact ledgers. Download the CSV or show its selectable text to retain both scenarios for every system.
The Formula
The mathematical logic powering this calculation is:
Net floor area = sum of each zone’s gross area minus its uncoated deduction. Zones must not overlap; each layer in every alternative covers the same net floor. Convert square feet to square metres using 1 ft² = 0.09290304 m² exactly. Area unit changes convert gross and deducted quantities together; exact fractions avoid conversion rounding.
For each separate layer, effective area = net m² × whole number of coats × (1 + extra allowance percent / 100). Required mixed liters = effective area / coverage in m² per mixed liter. Lower material demand uses the upper coverage value; higher demand uses the lower coverage value. Equal coverage values give one demand assumption. The allowance adds to theoretical demand, rather than dividing by a percentage loss. Do not double-count losses already included in your coverage figure. Manufacturer coverage depends on the product, surface and application conditions; the linked Sika data sheet illustrates a product-specific range, while WEST SYSTEM distinguishes porous initial coats from subsequent coating coverage. No manufacturer values are applied automatically.
For each layer and demand endpoint, whole kits = ceiling(required liters / full mixed-kit yield). Purchased liters = kits × kit yield; surplus = purchased liters − required liters; material cost = kits × kit price. Zero required volume needs zero kits. Different layers are rounded separately and surplus is never transferred between layers. Full mixed-kit yield means the combined usable yield of the supplied kit, not one component’s volume. This is purchase arithmetic, not permission to split kits or change mixing ratios.
System preparation cost = net m² × preparation rate per m². Labor cost = entered person-hours × hourly cost. Total cost = sum of layer kit costs + preparation + labor + other fixed cost. Labor and fixed costs remain at zero floor area if entered; cost per m² is unavailable at zero net area. Prices share one user currency label, which does not convert money. No tax, local market rate or omitted scope is inferred. All arithmetic and kit counts remain exact; rounding is for display only.
Compare both total endpoints. Lowest lower cost and lowest upper cost are distinct rankings with exact ties retained. For multiple systems, a uniquely cheapest system across the entered bounds requires its upper cost to be strictly below every other system’s lower cost. Overlapping or touching ranges do not establish a unique winner. These ranges are scenarios, not probability distributions, confidence intervals or guarantees of actual installation cost. Comparison assumes equivalent intended scope; the planner cannot verify product performance.
Limits: 1–20 zones, 1–6 systems and 1–8 layers per system. Nonnegative gross and deducted areas accept up to 12 decimal places or integer fractions with up to 24 digits per part; deductions cannot exceed gross area. Combined net area is at most 100000000 m². Coverage and kit yield are positive through 1000000, in m²/L and L respectively. Coats are whole numbers 1–20, allowance 0–100%. Kit price, preparation rate, labor hours, labor rate and fixed costs are nonnegative through 1000000000. Non-area decimals accept up to six places. These are calculation bounds, not installation recommendations. Blank required fields invalidate results. No moisture assessment, thickness specification, pot-life forecast, curing or recoat schedule, product compatibility assessment or partial-kit mixing guidance is provided.Worked Example
If you input:
- Floor: 50 m² gross; zero deduction; USD prices
- Both systems: Preparation USD 2/m²; 8 additional labor hours at USD 30/hour; other fixed cost USD 50
- Primer: One coat; coverage 5–8 m²/L; 10% allowance
- Topcoat: One coat; coverage 4–5 m²/L; 10% allowance
- Smaller kits: Primer 5 L at USD 100; topcoat 5 L at USD 150
- Larger kits: Primer 10 L at USD 180; topcoat 15 L at USD 400
Result:
Both layers have 55 m² effective area. Primer demand is 6.875–11 L; topcoat demand is 11–13.75 L. Smaller kits require 2–3 primer kits and 3 topcoat kits, costing USD 650–750 in materials. Larger kits require 1–2 primer kits and 1 topcoat kit, costing USD 580–760. Add USD 100 preparation, USD 240 labor and USD 50 fixed costs to each system: smaller kits total USD 1040–1140, while larger kits total USD 970–1150. The lower-demand winner is larger kits; the higher-demand winner is smaller kits. The overlapping ranges do not establish one uniquely cheapest system. The threshold example uses 25.000000000001 m² at 5 m²/L with no allowance: demand is just above 5 L, so two 5 L kits are required rather than rounding it back to one.
Frequently Asked Questions
How much does an epoxy garage floor cost?
This planner calculates the cost of the quantities and prices you enter, including separate layer kit purchases, preparation, labor and fixed costs. It does not supply a location-based market price. Use current supplier prices and a complete scope; omitted repairs, taxes or other work are not added automatically.
Should coverage be entered per kit or per liter?
Enter square metres per mixed liter. If a supplier states area per complete kit, divide that area by the kit’s full mixed yield first. Enter the combined kit yield separately in liters. Resin-only volume and hardener-only volume are not interchangeable with full mixed yield.
Why can a larger kit cost less in one scenario and more in another?
Whole-kit purchases create steps. A larger kit can cover lower demand with one purchase but need a second kit when demand crosses its yield. In the example, larger kits cost 970 at lower demand and 1150 at higher demand, while smaller kits cost 1040–1140 in the same currency. Neither is a certain winner across those ranges.
Can leftover primer be used to reduce the topcoat order?
No such transfer is assumed. Each layer is a separate purchase, even when labels or prices match. Surplus means purchased material above that layer’s allowance-adjusted demand. It does not establish storage life, product compatibility or permission to mix partial kits.
What does the coverage range mean?
Lower coverage requires more material; upper coverage requires less. The two endpoints are scenarios based on your supplied bounds, not statistical confidence limits. Actual surface porosity, profile and application conditions may fall outside an assumed range. Check the product data and a suitable test area.
Are primer and subsequent coats calculated the same way?
They use the same quantity arithmetic but should have their own actual coverage assumptions. If subsequent coats have different coverage, create separate layers. The planner does not infer a primer requirement or choose a compatible coating system.
Why do costs remain when the floor area is zero?
Material and area-based preparation become zero, but entered labor hours and other fixed costs are still charged. Change those assumptions if they would actually be avoided. Cost per square metre is unavailable when there is no net floor area.
Does this tell me how to mix or apply the coating?
No. It is a quantity and purchasing comparison. It does not specify mixing ratios, partial-kit procedures, moisture suitability, thickness, pot life, cure time or recoat windows. Follow the current manufacturer instructions for the selected products and conditions.
Similar Calculators
Paint Coverage Calculator
Estimate paintable wall area, paint needed, gallons to buy, and project cost with room-by-room deductions.
Concrete Slab Calculator
Estimate concrete slab volume, cubic yards, bag count, waste allowance, and material cost.
Grout Coverage & Pack Cost Planner
Estimate grout volume from tile and joint geometry, compare product coverage and whole-pack costs, and plan separate orders for colors or work groups.
