First-Pass Yield & Rework Audit
Audit two completed lots through the same sequence. See how many units passed every stage on their first attempt, how many finished with rework history, and where units left the clean path. Compare measured clean-through yield with the product of the local first-pass rates and calculate the whole-unit gap to your entered target.
Compare first-pass yield and rework by stage
Follow the same units through a completed serial process and reconcile what passed first time, was recovered, or was scrapped.
Completed lots and common stages
Use the same stage names and order for both lots. Unaccepted units are treated as scrap.
Clean-through yield change B versus A +8.00 pp.
Lot A
81.00%
Clean through all stages · 81 of 100 started
95.00% finally accepted
9 more clean units to reach target
Lot B
89.00%
Clean through all stages · 89 of 100 started
97.00% finally accepted
1 more clean unit to reach target
Follow the first-pass cohort
Each bar accounts for the entire starting lot. The marker shows the 90% clean-through target.
- Untouched
- Accepted with rework
- Scrapped by this stage
Form
Lot A · 90.00% untouched
90 untouched, 8 accepted with rework, 2 scrapped to date
Lot B · 94.00% untouched
94 untouched, 5 accepted with rework, 1 scrapped to date
Finish
Lot A · 84.00% untouched
84 untouched, 12 accepted with rework, 4 scrapped to date
Lot B · 90.00% untouched
90 untouched, 8 accepted with rework, 2 scrapped to date
Inspect
Lot A · 81.00% untouched
81 untouched, 14 accepted with rework, 5 scrapped to date
Lot B · 89.00% untouched
89 untouched, 8 accepted with rework, 3 scrapped to date
Audit the stage arithmetic
Lot A
Product of local first-pass rates · 80.09%
Measured clean-through yield · 81.00%
Lot B
Product of local first-pass rates · 87.43%
Measured clean-through yield · 89.00%
Local rates can include units reworked at earlier stages. The tracked clean cohort follows the same units through the full sequence.
Open stage ledger
Lot A · Form
- Entered
- 100
- First-time accepted at stage
- 90
- Accepted after rework at stage
- 8
- Scrapped at stage
- 2
- Untouched at entry → exit
- 100 → 90
- Local first-pass yield
- 90.00%
- Conditional clean pass
- 90.00%
Lot A · Finish
- Entered
- 98
- First-time accepted at stage
- 91
- Accepted after rework at stage
- 5
- Scrapped at stage
- 2
- Untouched at entry → exit
- 90 → 84
- Local first-pass yield
- 92.86%
- Conditional clean pass
- 93.33%
Lot A · Inspect
- Entered
- 96
- First-time accepted at stage
- 92
- Accepted after rework at stage
- 3
- Scrapped at stage
- 1
- Untouched at entry → exit
- 84 → 81
- Local first-pass yield
- 95.83%
- Conditional clean pass
- 96.43%
Lot B · Form
- Entered
- 100
- First-time accepted at stage
- 94
- Accepted after rework at stage
- 5
- Scrapped at stage
- 1
- Untouched at entry → exit
- 100 → 94
- Local first-pass yield
- 94.00%
- Conditional clean pass
- 94.00%
Lot B · Finish
- Entered
- 99
- First-time accepted at stage
- 94
- Accepted after rework at stage
- 4
- Scrapped at stage
- 1
- Untouched at entry → exit
- 94 → 90
- Local first-pass yield
- 94.95%
- Conditional clean pass
- 95.74%
Lot B · Inspect
- Entered
- 98
- First-time accepted at stage
- 96
- Accepted after rework at stage
- 1
- Scrapped at stage
- 1
- Untouched at entry → exit
- 90 → 89
- Local first-pass yield
- 97.96%
- Conditional clean pass
- 98.89%
Open CSV text
How to use this calculator
- Enter the starting unit count for each completed lot and a clean-through percentage target.
- List the same stages in production order for both lots.
- Enter each lot's first-pass count and accepted-after-rework count at every stage. Unaccepted units count as scrap.
- From stage two onward, enter the overlap of stage first-pass units with units untouched before that stage. Obtain this count from the lot's unit-level records.
- Review the clean-through bars, check the stage ledger and export the audit CSV.
The Formula
The mathematical logic powering this calculation is:
For one completed serial lot, entering units at each stage are the accepted units from its predecessor. Each unit is counted once at a stage. First-pass units are accepted at the initial attempt. Recovered units are accepted after any repeat, repair, rework or retest at that stage. Scrap is entering units − first-pass units − recovered units. Accepted units = first-pass units + recovered units. With a nonzero entering count, local first-pass yield = first-pass units ÷ entering units.
The tracked clean cohort starts as the whole lot. At each stage, enter how many local first-pass units were also untouched in all prior stages. If E units entered, C entered untouched and F passed locally first time, the overlap must be between max(0, F − (E − C)) and min(F, C). At the first stage, F is the overlap. Only this overlap remains untouched for the next stage. Accepted units with rework history = accepted units − untouched passers.
End-to-end clean yield = final untouched units ÷ original lot size. The product of the successive conditional clean-cohort rates gives the same yield when each conditional denominator is positive. The product of local first-pass yields uses all entrants at each stage, including units reworked earlier, and is reported as a separate index when all stages received units. The index does not recover the actual overlap from stage totals.
Final accepted yield = final accepted units ÷ original lot size. Target clean units = ceiling(lot size × target percentage ÷ 100). The gap is the positive difference between target count and final untouched units. Compare only aligned stage definitions and completed lots with the same unit and counting rules. The model covers a serial path with no replacement, splitting, branching, open work or merge from other lots.Worked Example
If you input:
- Lot A started / Lot B started: 100 / 100
- Clean-through target (%): 90
- Form · first pass / recovered: A 90 / 8 · B 94 / 5
- Finish · first pass / recovered / untouched first pass: A 91 / 5 / 84 · B 94 / 4 / 90
- Inspect · first pass / recovered / untouched first pass: A 92 / 3 / 81 · B 96 / 1 / 89
Result:
Lot A finishes with 81% clean-through yield and 95% final accepted yield. Lot B finishes at 89% and 97%. B improves clean-through yield by 8 percentage points and would need one more untouched finished unit to reach its 90% target at the same lot size.
Frequently Asked Questions
What counts as a first-pass unit?
A distinct unit accepted at that stage on the initial attempt. Repairs, retries and retesting before acceptance put the unit into recovered at that stage. Count a recovered unit once, even if it needed several attempts.
Why does clean-through yield differ from final accepted yield?
Final acceptance includes completed units fixed along the way. Clean-through requires first-pass acceptance at every stage. The gap counts finished units that needed at least one intervention.
Can I just multiply each stage's first-pass yield?
The worksheet reports that product as an index. Once reworked units continue, the local denominators can mix untouched and previously reworked units. Their product can disagree with the measured share of original units that passed every stage first time.
Where do I get the untouched first-pass count?
Filter the stage's first-pass units by their earlier stage history, using serial numbers, traveler records or equivalent identifiers. The displayed feasible counts catch impossible combinations. A feasible entry still needs traceable records.
Can I enter batches with open rework or routes that bypass stages?
Use fully dispositioned lots on one serial route. Each accepted unit enters the next stage, and the remaining units are treated as scrap. Work that is still pending, bypasses, replacements, and branch merges need a different flow model.
What does the whole-unit target gap mean?
It compares the required untouched count with the observed count at the entered lot size. For 101 started units and a 90% target, at least 91 must finish untouched. The gap measures how far the lot finished from target.
Similar Calculators
OEE Calculator
Calculate overall equipment effectiveness across production periods. Inspect availability, performance, first-pass quality and equivalent time losses.
Process Capability & Cpk Calculator
Compare Cp, Cpk and Cpm for two processes. Enter sample readings or summaries, set specification limits and see which change would meet your index goal.
Production Cycle Time & Batch Capacity Planner
Compare production cycle time, whole-lot shift output and bottleneck timing for two process sequences. See when planned batches finish and how much demand fits.
Dies per Wafer Calculator & Grid Layout
Count complete rectangular dies on a circular wafer. Compare grid shifts, rotation, scribe streets, edge exclusion and a gross die target.
Production Rework or Salvage Break-Even