Production Rework or Salvage Break-Even
Model a lot at an inspection disposition gate. Enter the net amounts for immediate salvage, recovered units and the residual material. Compare the two outcomes after one lot-wide rework attempt and find exactly how many recovered units change the result. A separate budget check compares the upfront rework spend with available funds.
Compare rework and immediate salvage for one lot
Compare economics after inspection using approved paths and a separately confirmed rework budget.
Edit the lot, values and spend
Include future net amounts after the decision. Enter a negative unit value for net disposal cost.
Lot value comparison
Salvage now has the higher net value.
- Rework net
- $784.00
- Immediate salvage net
- $796.00
- Rework less salvage
- -$12.00
- Residual units after rework
- 118
Net value across recovered unit counts
- Rework net
- Salvage now net
82 of 200 units recovered · 41%
Rework spend and upfront budget
Rework spend exactly matches the upfront budget.
- Total recovered value
- $1,148.00
- Total residual value
- $236.00
Inspect exact recovered unit ranges
0–82 recovered units
Salvage now is higher
83 recovered units
Equal net value
84–200 recovered units
Rework is higher
Export the disposition comparison
View CSV text
How to use this calculator
- Enter the segregated lot size, an assumed whole-unit recovery count, and the immediate net salvage value per unit.
- Enter each recovered and residual unit’s value after any separate downstream costs. Enter a negative amount for net disposal cost.
- Enter fixed rework setup, cost for each attempted unit, and the upfront budget.
- Inspect the whole-unit outcomes, separate cash gate and signed values. Download the exact inputs and result.
The Formula
The mathematical logic powering this calculation is:
Salvage now net = whole lot × immediate net salvage value per unit. Rework spend = fixed setup plus lot size × rework cost per attempted unit. Every unit is attempted once. Rework net = recovered units × net recovered value per unit + residual units × net residual value per unit − upfront rework spend. Residual units = lot size minus recovered units. Compare rework net minus immediate salvage net. Use incremental amounts after this decision and include costs for each path once.
Changing one residual unit to a recovered unit changes rework net by the difference between the two unit values. This can be positive, zero or negative. The worksheet checks whole recovered counts from zero through lot size and shows every exact range and any tie. The upfront budget covers rework spend when spend is at or below the entered budget. Net proceeds from later sale or reuse do not fund the modeled upfront step.
Use only quality-approved disposition paths and an independently estimated recovered count. Recovered value can represent a documented sale or avoidable purchase cost from reuse. Negative net values can model a disposal cost. Keep the setup and per-attempt cost distinct from the net values entered. Rates accept up to $100,000 per unit in magnitude. Fixed setup and budget accept $0–$10 billion. Money accepts up to two decimals. The lot must contain 1–10,000 units. These are scenario amounts for one attempt, with no inferred release approval, success probability, capacity or repeat cycle.Worked Example
If you input:
- Lot: 200 units. $3.98 immediate salvage per unit. Model 82 recovered units.
- Rework: $14 per recovered unit, $2 per residual unit, $200 setup and $2 for each attempted unit.
- Budget: $600 upfront.
Result:
Immediate salvage is $796.00. Rework at 82 recoveries nets $784.00. At 83 recoveries the two options tie, and at 84 rework leads by $12.00. Rework costs $600.00 upfront in all three cases.
Frequently Asked Questions
Which sunk costs belong in this comparison?
The calculation starts at the disposition decision. Include incremental costs and values that change between the two paths. Amounts already incurred apply to both paths and can stay in the separate job-cost record.
How do I account for material that fails rework?
Use its separately confirmed net residual value. Enter a negative value if disposition costs more than the material returns.
Does more recovery always improve the rework scenario?
Only when the value for a recovered unit exceeds the net residual value. The ranges reflect the three rates entered.
Can rework have a higher net value and still be over budget?
Yes. The budget compares the full rework spend paid before recovery proceeds, independently of the forecast net value.
Similar Calculators
First-Pass Yield & Rework Audit
Compare two production lots by stage. Separate first-pass yield, units recovered after rework, scrap, and tracked clean-through yield.
Total Manufacturing Cost & Job Variance Calculator
Calculate manufacturing job costs and cost per accepted unit. Compare planned and recorded materials, labor and applied overhead and trace the difference in a waterfall.
Marginal Cost & Production Tier Calculator
Calculate the cost of making one more unit or moving to a new capacity tier. Compare two production quantities after step charges, sales and inventory costs.
Scrap Metal Calculator & Yard Quote Comparison
Compare written scrap metal quotes for up to six weighed lots. Deduct tare and weight adjustments, check yard minimums, and compare net proceeds after trip costs.