Sonotube & Concrete Tube Form Calculator

Measure concrete for up to three groups of round forms, with an optional wider cylindrical base below each shaft. Compare bag packs and ready-mix quotes for one consolidated order or separate orders for two pour phases. The shared-scale form profiles show the measured geometry, and the order comparison separates the allowance already included in your estimate from any extra material you have to buy.

Concrete quantity planning

Plan concrete for round forms

Measure tube and base volumes, then compare one consolidated order with purchases or deliveries for separate pour phases.

Form groups

Use measured inside diameters. Enter 0 for both base fields when there is no extension. Base depth starts below the entered shaft.

Group 1
Group 2
Edit bag and ready-mix quotes

Example prices are illustrative. The short-load fee applies when the rounded order is below the quoted threshold.

Concrete to plan for

35.2565 ft³

10 forms · 32.6449 ft³ measured volume + 2.61159 ft³ allowance

Purchase and delivery comparison

Bagged mix

59 bags · $383.50

Combined purchase

Separate orders · 60 bags · $390.00

Ready-mix

1.5 yd³ · $407.50

Combined delivery

Separate orders · 2.25 yd³ · $691.25

Volume supplied and left over

All bars share one scale. The blue section is the same 35.2565 ft³ target in each option.

  • Bags, combined35.4 ft³ supplied · 0.143476 ft³ extra

  • Bags, separate36 ft³ supplied · 0.743476 ft³ extra

  • Ready-mix, combined40.5 ft³ supplied · 5.24348 ft³ extra

  • Ready-mix, separate60.75 ft³ supplied · 25.4935 ft³ extra

Round form cross-sections

Each profile uses the same inch scale. The base starts below the shaft. The chart shows one form per group.

Group 1 · Phase A

6 forms · 4.31969 ft³ per form

3.14159 ft³ shaft + 1.1781 ft³ base

Group 2 · Phase B

4 forms · 1.6817 ft³ per form

Show group and order ledgers

Group 1

25.9181 ft³ geometry + 2.07345 ft³ allowance = 27.9916 ft³

Group 2

6.72679 ft³ geometry + 0.538143 ft³ allowance = 7.26493 ft³

Combined order

Concrete target
35.2565 ft³
Bag packs
59
Concrete bags
59
Bag purchase
$383.50
Ready-mix ordered
1.5 yd³
Ready-mix material
$247.50
Delivery fees
$95.00
Short-load fees
$65.00
Ready-mix total
$407.50

Phase A

Concrete target
27.9916 ft³
Bag packs
47
Concrete bags
47
Bag purchase
$305.50
Ready-mix ordered
1.25 yd³
Ready-mix material
$206.25
Delivery fees
$95.00
Short-load fees
$65.00
Ready-mix total
$366.25

Phase B

Concrete target
7.26493 ft³
Bag packs
13
Concrete bags
13
Bag purchase
$84.50
Ready-mix ordered
1 yd³
Ready-mix material
$165.00
Delivery fees
$95.00
Short-load fees
$65.00
Ready-mix total
$325.00

Separate orders total

Concrete target
35.2565 ft³
Bag packs
60
Concrete bags
60
Bag purchase
$390.00
Ready-mix ordered
2.25 yd³
Ready-mix material
$371.25
Delivery fees
$190.00
Short-load fees
$130.00
Ready-mix total
$691.25

Export the pour comparison

Save the measured groups, quote inputs and every order quantity and fee.

Download concrete tube CSV
Show selectable CSV

How to use this calculator

  1. Start with Two pour phases or Packs and minimums. Enter the number of matching forms, measured inside shaft diameter and concrete fill height in each group.
  2. If the form has a separate cylindrical base below the shaft, enter its diameter and depth. Assign each group to Phase A or Phase B and enter its volume allowance.
  3. Open Edit bag and ready-mix quotes. Enter the product's mixed yield, supplier pack size and per-bag price, then enter the ready-mix minimum, increment, rate and delivery terms.
  4. Compare combined and separate quantities, costs and surplus. Check the form cross-sections, then open Show group and order ledgers to inspect the allowance, purchase quantities and each phase's charges.
  5. Download concrete tube CSV to save the measurements, quote inputs and order ledger.

The Formula

The mathematical logic powering this calculation is:

A form shaft is a right cylinder with measured inside diameter d and concrete fill height h in inches. Shaft volume = πd²h/(4 × 1,728) cubic feet. An optional cylindrical base below the shaft uses the same equation with its own diameter and depth. The shaft height ends at the top of this base, so the two cylinders share no volume. Enter 0 for both base dimensions if the form has no extension. A base with positive depth must have diameter at least equal to the shaft.
Group geometric volume = form count × (shaft volume + base volume). Group target = geometric volume × (1 + allowance/100). The project target sums all groups; an individual phase sums only groups assigned to it.
For target T cubic feet, bag packs = ceil(T / (mixed yield per bag × bags per pack)). Purchased bags = packs × bags per pack. Bag supply = purchased bags × yield; bag cost = purchased bags × price per bag.
Ready-mix target in cubic yards = T/27. The supplier's minimum is purchased and delivered in this quote model. Ordered cubic yards = increment × ceil(max(ready-mix target, order minimum) / increment). Material cost = ordered amount × cubic yard rate, rounded half up to cents for each order. Add the fee per delivery and the short-load charge only if the ordered volume is strictly under the entered threshold.
Extra supplied volume is delivered quantity or mixed bag yield minus the target. The combined order applies each pack, minimum, increment and fee once. Separate orders apply those terms independently to each nonempty phase before summing. This assumes a shared quote, and independently purchased bags are counted separately in each phase. Allowance and surplus are reported separately.
The model uses π = 3.141592653589793 with exact decimal arithmetic for subsequent limits, volumes, roundups and currency. Geometry is displayed with up to six significant digits. CSV reports dimensions in inches, concrete quantities in ft³ and yd³, and amounts in USD.
Enter 1–3 groups, each with 1–500 matching forms. Shaft diameter is 1–120 in and shaft height 1–600 in. Base diameter is 0–240 in and depth 0–120 in. Volume allowance is 0–100%. Bag yield is 0.01–10 ft³ and pack size 1–100 bags. Ready-mix order minimum and short-load threshold are 0–100 yd³ with increments of 0.01–25 yd³. Bag prices are up to $1,000, ready-mix rates up to $2,000/yd³, and delivery and short-load fees up to $10,000. Decimal fields allow four decimal places and money allows two.
The estimate covers the entered shapes and supply prices. The order comparison leaves out labor, forms, reinforcement, pumping, tax, scheduling, physical yield changes and structural design. Use the project drawings for dimensions and the current supplier quote for delivery terms.

Worked Example

If you input:

  • Phase A: Six 12 × 48 in shafts with 18 × 8 in bases, 8% allowance
  • Phase B: Four 10 × 37 in shafts, no bases, 8% allowance
  • Bag quote: 0.60 ft³ per bag, $6.50 each
  • Ready-mix quote: $165/yd³, 1 yd³ minimum and 0.25 yd³ increment, $95 delivery, $65 short-load fee below 2 yd³

Result:

The 10 forms hold 32.6449 ft³ before allowance, with a 35.2565 ft³ total target. Buying together takes 59 bags ($383.50) versus 60 bags ($390.00) in separate phases. One ready-mix order rounds to 1.5 yd³ ($407.50). Separate orders round to 1.25 and 1 yd³ ($691.25 combined).

Frequently Asked Questions

How many bags of concrete fill a 12-inch tube 4 feet deep?

A measured 12-inch inside diameter and 48-inch shaft fill take about 3.142 ft³ without a base or allowance. At 0.60 ft³ of mixed yield per bag, buy six whole bags if they are sold individually.

Do I measure the shaft diameter or use the package label?

Use the measured inside diameter. Volume scales with diameter squared, so a small difference in the diameter affects the result. Use the concrete fill height if it is shorter than the form.

How does the optional base affect concrete volume?

A cylindrical base below the shaft adds its complete volume. Enter shaft fill height above the base and base depth below it. Tapered or bell-shaped bases can use the manufacturer's stated volume outside this worksheet.

Why do separate phase orders cost more in the example?

In the two-phase example, each phase rounds up to an individual whole-bag count or ready-mix increment. Ready-mix delivery and short-load fees apply independently to both orders. The quote and measurement fields let you see how that changes for your job.

What happens at the short-load threshold?

The fee applies when the rounded ordered volume is below the threshold. At the threshold or above, it is zero. Check the quote for fees tied to a different measure.

Where does the example bag yield come from?

QUIKRETE Concrete Mix 1101 lists an approximate 0.60 ft³ yield for its 80 lb bag. Use the mixed yield for the specific product you plan to buy.