Concrete Curb & Gutter Calculator | Profile and Pour Planner
Enter the dimensions of up to two documented curb and gutter profiles. See how the curb, sloped face and gutter pan contribute to volume. Compare ordering together or independently after allowances, supplier minimums and order increments.
Measure concrete from the curb and gutter profile
Trace the cross-section in strips and compare the concrete to order together or separately.
Net concrete across active runs
9.3125 yd³
With allowance 9.7781 yd³.
One combined order
10 yd³
$1,925.00
Separate orders
10.5 yd³
$2,140.00
One combined order selected.
10 yd³ ordered · $1,925.00.
Separate orders add 0.5 yd³ and $215.00.
Cross-section and strip areas
- Curb cap · 72 in²
- Gutter pan · 99 in²
What each order includes
- Net geometry
- Entered allowance
- Minimum and increment surplus
Edit Run A profile
Enter thickness above the base at each named edge. A vertical curb face has zero horizontal run.
Edit Run B profile
Enter zero length when this profile is absent.
Enter thickness above the base at each named edge. A vertical curb face has zero horizontal run.
Edit supplier terms
The minimum, increment and fee apply per order. A supplier can split an order across deliveries.
Review exact volume and order calculations
Run A
Curb cap · 6 × (12 + 12) ÷ 2 = 72 in²
Gutter pan · 18 × (6 + 5) ÷ 2 = 99 in²
Total 171 in² × 180 ft ÷ 3,888 = 95/12 yd³.
With allowance 133/16 yd³.
Run B
Curb cap · 6 × (7 + 7) ÷ 2 = 42 in²
Sloped curb face · 3/2 × (7 + 6) ÷ 2 = 39/4 in²
Gutter pan · 18 × (6 + 5) ÷ 2 = 99 in²
Total 603/4 in² × 36 ft ÷ 3,888 = 67/48 yd³.
With allowance 469/320 yd³.
One combined order
Combined · target 3129/320 yd³ · ordered 10 yd³ · surplus 71/320 yd³.
Separate orders
Run A · target 133/16 yd³ · ordered 17/2 yd³ · surplus 3/16 yd³.
Run B · target 469/320 yd³ · ordered 2 yd³ · surplus 171/320 yd³.
Show curb and gutter CSV text
How to use this calculator
- Measure the lengths of the constant profiles. Enter zero for Run B if only one profile is present.
- Enter widths and thicknesses from the project cross-section. Use zero horizontal run for a vertical curb face.
- Copy the confirmed concrete allowance, minimum, increment, unit price and per-order fee.
- Inspect both cross-sections and compare the rounded combined and separate order quantities.
- Download the exact strip areas, volumes and order ledger as CSV.
The Formula
The mathematical logic powering this calculation is:
Each profile models up to three adjacent strips: a curb cap, an optional straight sloped face, and a gutter pan. Use each strip's horizontal width and its concrete thickness at each end. The face uses the top-of-face and gutter-start thicknesses as endpoints. A zero horizontal face width joins the curb and gutter at a vertical line with zero face-strip area. Treat the bottom as a common reference in the diagram. Each strip area is width × (first thickness + last thickness) ÷ 2. Adjacent widths partition the profile, so each part of the shared section is counted once. Total area is the sum in square inches. Multiply by the run length in feet and divide by 3,888 (144 × 27) to obtain cubic yards.
Apply the entered percentage allowance to each geometric volume. The combined plan applies one supplier minimum and one rounding increment to the sum of both runs. Separate orders apply the same terms independently to each active run. For each order, take the larger of its target and the entered minimum. Round up to the next permitted increment, leaving an exact multiple unchanged. Multiply ordered volume by the entered unit price and add the fee for that order. Cost uses exact inputs before the displayed rounding to dollars and cents. When Run B has zero length, it is inactive and adds no minimum or fee.
Use as a quantity takeoff from project records. The chart is a straight-sided representation of a constant thickness profile. Account for curved details, openings and transition lengths in your own takeoff before using the worksheet. The supplier inputs apply to the entered order terms. One order can span several deliveries. The worked example uses illustrative geometry and terms.Worked Example
If you input:
- Run A: 180 ft at 171 in²
- Run B: 36 ft at 150.75 in²
- Volume allowance: 5%
- Supplier terms: 2 yd³ minimum and 0.5 yd³ increments. $180 per yd³ and $125 per order.
Result:
The net volume is 9.3125 yd³. One combined order rounds to 10 yd³ for $1,925.00. Separate orders round to 8.5 and 2 yd³ for $2,140.00 total.
Frequently Asked Questions
Why is the curb face entered as a horizontal run?
The face strip uses the horizontal width and endpoint thicknesses so that its exact area is a trapezoid. A vertical face contributes no area of its own.
What if the gutter thickness changes across the profile?
Enter the near and outer concrete thicknesses separately. The mean thickness applies to that straight-sided strip.
What if the curb profile changes along the route?
Enter separately measured lengths for the two constant profiles. A longitudinal transition that varies continuously needs a separate quantity takeoff.
Why can separate orders need more concrete?
Separate orders can hit a minimum or round up by an increment more than once. The comparison uses the same entered supplier terms for both options.
Does the combined result mean one truck?
It applies the supplier's order terms once. Confirm the actual delivery count and schedule with your supplier.
What happens if I only have one run?
Set Run B length to zero. Its profile and charges are inactive, so combined and separate order quantities match.
Similar Calculators
Concrete Slab Pour Schedule & Delivery Quote Planner
Compare ready-mix concrete delivery quotes for a slab pour. Schedule individual loads, check the site cutoff and calculate short-load and overtime charges.
Concrete Slab Calculator
Estimate concrete slab volume, cubic yards, bag count, waste allowance, and material cost.
Concrete Steps, Fill & Pour Cost Calculator
Calculate concrete for steps and a landing, deduct an authored fill core, inspect profile and plan diagrams, and compare whole bags with ready-mix order costs.
Sonotube & Concrete Tube Form Calculator
Calculate concrete bags and cubic yards for round tube forms. Add cylindrical bases, compare single or phased orders and see delivery minimums and fees.