Concrete Steps, Fill & Pour Cost Calculator
Turn an already specified straight stair layout into a transparent concrete quantity and supply estimate. Define risers, ordinary treads and one top landing, then choose a solid block or an explicitly drawn central fill core. Linked centreline and plan diagrams show where fill is deducted and how much concrete remains in each segment. Compare allowance, whole-bag yield, ready-mix increments, minimum orders and short-load fees without hiding surplus or pricing jumps. Discrete allowance scenarios and complete CSV retain the same exact quantities as the tables. This is a geometric pour and concrete-supply estimate, not a stair-layout recommendation, structural design, reinforcement schedule or complete installation quote. Prices and dimensions are editable illustrative assumptions.
See the pour before you order
Inspect stair and fill geometry, reconcile concrete quantities, and compare bagged and ready-mix supply quotes.
Stair geometry
N risers means N−1 ordinary treads followed by one top landing. Enter an already specified layout; these dimensions are illustrative, not approved construction requirements.
Supported range: 1–50.
Supported range: 1–500.
Supported range: 1–2000.
Supported range: 1–10000.
Supported range: 1–10000.
No footing, base slab, nosing or tread drainage pitch is added.
Authored fill core
A central constant-width core starts and ends at your setbacks. Its top connects the entered front and rear heights with a straight line above the flat base. Fill must stay strictly below every intersected step surface.
Must not exceed stair width; the core is centred between the sides.
Supported range: 0–100000.
Supported range: 0–100000.
Supported range: 0–25000.
Supported range: 0–25000.
Core volume is in-place geometric displacement, not loose fill to buy. No compaction factor or structural adequacy is inferred.
Concrete supply assumptions
0–50%; entered allowance is separate from surplus created by order rounding.
Synthetic USD prices. Concrete supply only: tax, labor, pumps, waiting, reinforcement, forms, footings and finishing are excluded. Lower quoted cost is not a construction recommendation.
Net concrete 0.82836 m³; 54 bags or 1 m³ ready-mix at the entered allowance.
Net concrete
0.82836 m³
Solid reference 1.22688 m³; core displacement 0.39852 m³.
Required with allowance
0.9112 m³
Added allowance 0.08284 m³.
Bagged quote
$430.00
54 bags; 0.918 m³ approximate yield.
Ready-mix quote
$355.00
1 m³ purchased; short-load fee $75.
Ready-mix has the lower entered supply quote. Bag minus ready-mix cost: $75.00 (rounded to cents; exact values in CSV). Bag surplus above required volume: 0.0068 m³; ready-mix surplus: 0.0888 m³.
Inspect a segment
Segment 1: 0.06048 m³ gross − 0.0048 m³ core = 0.05568 m³ concrete.
Minimum vertical separation over the core: 120.73171 mm. Segment 1, x=280 mm. This is a vertical geometric gap, not structural thickness or reinforcement cover.
Where the concrete goes
Blue is the full stair envelope; hatched amber is the authored fill core. Dark outlines identify selected segment 1. Side view is through the centreline of the core; the plan shows its actual width.
Length 1,840 mm · total rise 720 mm. Geometry uses a flat reference base; no separate footing or base slab is included.
Stair width 1,200 mm; core width 900 mm, side separation 150 mm each.
Each drawing preserves its own dimensional proportions. Very thin sections may be difficult to see; inspect the exact coordinates and separation values below. Geometry does not establish structural thickness, reinforcement cover or stair compliance.
Segment quantity reconciliation
| Segment | Start → end (mm) | Top height (mm) | Gross (m³) | Core (m³) | Net (m³) |
|---|---|---|---|---|---|
| 1 · tread | 0 → 280 | 180 | 0.06048 | 0.0048 | 0.05568 |
| 2 · tread | 280 → 560 | 360 | 0.12096 | 0.02655 | 0.09441 |
| 3 · tread | 560 → 840 | 540 | 0.18144 | 0.04979 | 0.13165 |
| 4 · landing | 840 → 1,840 | 720 | 0.864 | 0.31738 | 0.54662 |
Vertical: 0–638 USD. Horizontal: concrete allowance, 0–50%. Blue circles: bags. Purple squares: ready-mix.
Discrete modeled scenarios, without interpolation. Purchase rounding and short-load fees can cause jumps between samples. Enter any supported allowance to calculate it exactly.
Vertical: 0–1.38 m³. Horizontal: concrete allowance, 0–50%. Blue circles: bags. Purple squares: ready-mix.
Discrete modeled scenarios, without interpolation. Purchase rounding and short-load fees can cause jumps between samples. Enter any supported allowance to calculate it exactly.
Allowance scenario data
Integer allowances 0–50% plus your exact current allowance if fractional. A short-load fee can disappear when an order crosses its threshold, so a larger order can have a lower quote.
| Allowance (%) | Required (m³) | Bags | Bag quote (USD) | Ready order (m³) | Short-load fee (USD) | Ready quote (USD) |
|---|---|---|---|---|---|---|
| 0 | 0.82836 | 49 | 392.50 | 1 | 75 | 355.00 |
| 1 | 0.83664 | 50 | 400.00 | 1 | 75 | 355.00 |
| 2 | 0.84493 | 50 | 400.00 | 1 | 75 | 355.00 |
| 3 | 0.85321 | 51 | 407.50 | 1 | 75 | 355.00 |
| 4 | 0.86149 | 51 | 407.50 | 1 | 75 | 355.00 |
| 5 | 0.86978 | 52 | 415.00 | 1 | 75 | 355.00 |
| 6 | 0.87806 | 52 | 415.00 | 1 | 75 | 355.00 |
| 7 | 0.88635 | 53 | 422.50 | 1 | 75 | 355.00 |
| 8 | 0.89463 | 53 | 422.50 | 1 | 75 | 355.00 |
| 9 | 0.90291 | 54 | 430.00 | 1 | 75 | 355.00 |
| 10 | 0.9112 | 54 | 430.00 | 1 | 75 | 355.00 |
| 11 | 0.91948 | 55 | 437.50 | 1 | 75 | 355.00 |
| 12 | 0.92776 | 55 | 437.50 | 1 | 75 | 355.00 |
| 13 | 0.93605 | 56 | 445.00 | 1 | 75 | 355.00 |
| 14 | 0.94433 | 56 | 445.00 | 1 | 75 | 355.00 |
Export the complete pour estimate
Includes exact fractions, rounded quote displays, inactive drafts, all segments and every allowance scenario. Cells are quoted and prefixed as text for spreadsheet safety.
How to use this calculator
- Choose Filled stair example or Single landing & fee threshold. Enter Number of risers, Rise per step, Stair width and Top landing length; enter Ordinary tread going when there is more than one riser.
- Choose solid concrete or an authored fill core. For a core, enter its width, front/rear setbacks and endpoint heights. Use the diagrams to confirm the geometry rather than treating these inputs as structural recommendations.
- Enter Concrete allowance, then the actual approximate Yield per bag and quoted bag price/delivery. Keep allowance separate from the surplus created by whole bags.
- Enter Ready-mix rate, Order increment, Minimum purchased order, delivery and short-load terms. Confirm that the supplier’s minimum really means the delivered quantity assumed here.
- Select a Highlighted segment to inspect its profile, plan and gross/core/net contribution. Review the minimum vertical gap and any zero-separation warnings.
- Compare supply quotes and discrete allowance scenarios, including fee drops and order surplus. Download pour CSV or use Selectable CSV for all exact quantities, drafts and scenario rows.
The Formula
The mathematical logic powering this calculation is:
Counting convention: N risers create N−1 ordinary treads followed by one top landing. The final rise reaches that landing; there is no extra top tread added before it. N = 1 creates a single landing block. All dimensional inputs are millimetres. The model uses a flat reference base, horizontal tops, vertical risers, constant stair width and no nosing or drainage pitch.
Let R be rise, G ordinary going, W stair width and B landing length. Total rise H = NR; total length L = (N−1)G + B. Ordinary segment i, for i = 1…N−1, occupies x from (i−1)G to iG and has height iR. The landing occupies x from (N−1)G to L at height NR. Solid volume in mm³ = WR[GN(N−1)/2 + BN]. Divide by 10^9 for m³. No footing, below-grade extension or separate base slab is included.
In core mode, an authored constant-width central prism has width C, starts at a = front setback and ends at b = L − rear setback. Its top is h(x) = front height + (rear height − front height)(x−a)/(b−a), above the flat reference base. The core is centred across W. It can slope up, slope down or be level, but has no negative heights. It must have positive length, fit within the stair width and remain strictly below every stair surface it intersects.
For each segment, intersect its x interval with [a,b]. If overlap [u,v] has positive length, core volume is C(v−u)[h(u)+h(v)]/2. Both endpoint heights must be below that segment’s top. At a riser, positive overlaps on either side are tested against their own surface heights; a zero-length touch does not invent an extra overlapping section. Total concrete = sum of gross segment volumes minus sum of core volumes. The latter also reconciles to C(b−a)(front height + rear height)/2. All-zero core heights displace zero concrete.
Minimum vertical separation is the smallest top-height-minus-core-height at the positive-overlap endpoints, retaining all exact ties. This vertical measure is not normal slab thickness, reinforcement cover or a specified safe dimension. Side separation = (W−C)/2. Zero side or end separation is explicitly flagged; counting that geometry does not approve exposed fill. Core volume is in-place displacement, not a loose-material purchase quantity; no compaction factor is inferred.
Required concrete = net concrete × (1 + entered allowance/100). Bag count = ceil(required m³ × 1,000 / entered yield in litres). Purchased bag yield = bag count × yield/1,000. Bag supply cost = bag count × price + bag delivery. Approximate physical yield remains approximate even when the arithmetic is exact.
Ready-mix purchased order = ceil(max(required volume, minimum purchased volume)/order increment) × order increment. The minimum is both purchased and delivered in this quote model. A minimum charge for a smaller delivered volume is a different contract. Apply the short-load fee only when purchased quantity is strictly below the entered threshold; equality has no fee. Ready supply cost = purchased quantity × rate + delivery + applicable fee. A larger order can cost less when its short-load fee disappears.
Surplus = purchased volume − required volume, separately from the allowance already included in required volume. Cost difference = bag quote − ready-mix quote; positive means the entered ready quote is lower. Exact rational arithmetic controls all geometry, ceilings and costs. Currency displays round half-up to cents; exports retain exact fractions and rounded displays. A cheaper supply quote does not establish an appropriate product or pour method.
Scenario data covers integer allowances from 0 through 50%, plus the entered allowance if fractional. Plotted markers are discrete scenarios, with no interpolation or claim that all purchase transitions between samples are located. Enter any supported allowance for its exact scenario. CSV includes every segment, core vertex, limiting gap, supply quantity, quote, assumption and scenario; inactive drafts are retained.
Limits: 1–50 whole risers; rise 1–500 mm; ordinary going 1–2,000 mm; width and landing length 1–10,000 mm; core width 1–10,000 mm and no wider than the stair; front/rear setbacks 0–100,000 mm while leaving positive core length; core heights 0–25,000 mm subject to surface checks. Allowance is 0–50%, bag yield 0.1–100 L, bag price 0–10,000 USD, ready rate 0–10,000 USD/m³, increment 0.001–100 m³, minimum/short-load threshold 0–100 m³, and delivery/short-load fees 0–100,000 USD. Numeric drafts are unsigned plain decimals, at most 32 characters, with at most six fractional places or two for money. Ordinary going is inactive for one riser; core drafts are inactive in solid mode.
Excluded: structural adequacy, reinforcement, stairs or building-code checks, headroom, slip resistance, turns, winders, curved/nosed edges, tread drainage pitch, below-grade concrete, foundations, formwork design, loose-fill ordering, mix design, tax, labor, pumps, waiting time, finishing and disposal. Use independently specified dimensions and actual supplier terms.Worked Example
If you input:
- Stair geometry: 4 risers × 180 mm; 3 ordinary treads × 280 mm; width 1,200 mm; landing 1,000 mm
- Fill core: Width 900 mm; front and rear setbacks 100 mm; endpoint heights 0 and 540 mm
- Concrete allowance: 10%
- Bag quote: 17 L per bag, USD 7.50 per bag, USD 25 delivery
- Ready-mix quote: USD 180/m³, 0.25 m³ increment, 1 m³ minimum, USD 100 delivery; USD 75 fee below 3 m³
Result:
The solid stair envelope is 1.22688 m³. The authored core displaces 0.39852 m³, leaving 0.82836 m³ of concrete. At 10% allowance, required volume is 0.911196 m³. Buying 54 bags at an approximate 17 L each supplies 0.918 m³, a surplus of 0.006804 m³, and costs USD 430.00 including entered delivery. The ready-mix minimum produces a 1 m³ order with 0.088804 m³ surplus. Its material, delivery and short-load fee total USD 355.00, USD 75.00 below the bag quote. Minimum vertical separation is 4,950/41 mm, approximately 120.73171 mm; this geometric gap is not a safe-thickness determination. Prices and dimensions are illustrative.
Frequently Asked Questions
Does the number of risers include the rise to the landing?
Yes. N risers produce N−1 ordinary treads followed by the top landing at height N × rise. With one riser there is only a landing block. The tool does not add another top tread in front of the landing, which avoids an easy source of double-counted concrete.
Can I simply subtract an estimated percentage for fill?
This tool deducts an explicit central prism instead. Its width, setbacks and endpoint heights define the volume, and every intersected segment is checked for surface contact. The side profile is through that core; the plan view shows that its width may be smaller than the stair width. No loose-fill or compaction estimate is included.
Is the displayed minimum gap a safe concrete thickness?
No. It is the minimum vertical distance from the authored core top to the intersected stair surfaces. It is not thickness normal to a slope, reinforcement cover or structural approval. Zero side/end separation is flagged, and a core that reaches a top surface is rejected, but passing those geometric checks does not establish buildability.
Why can a larger ready-mix order have a lower price?
A short-load fee may disappear when the rounded purchased order reaches its threshold. That reduction can exceed the added material price. The scenario chart uses separate points and the table shows the actual fee; it does not smooth the discontinuity away.
Does the minimum order represent a minimum charge or delivered volume?
Here it represents both purchased and delivered volume, rounded up to the entered increment. If your supplier charges for a minimum but delivers a smaller amount, these quote terms do not describe that arrangement. Confirm the contract before comparing surplus and cost.
Where does the default 17-litre bag yield come from?
The inspected QUIKRETE Concrete Mix 1101 sheet lists an approximate 17 L yield for an 80 lb bag. The field is editable because other products and conditions differ. The default is an illustrative quantity assumption, not an exact yield guarantee or a recommendation for a particular product.
Are allowance and purchased surplus the same thing?
No. Allowance increases the estimated concrete requirement. Whole bags, minimum orders and delivery increments can then create additional purchased volume beyond that requirement. Both quantities are shown separately so they are not added twice or confused with geometric fill displacement.
Does the estimate include installing the steps?
No. It compares concrete-supply quotes only. Tax, labor, reinforcement, footings, forms, pump and waiting charges, finishing and disposal are excluded. The geometry also omits drainage pitch, nosings and below-grade extensions. Use the related stair-layout and slab tools for their stated scopes.
Similar Calculators
Stair Layout Calculator
Compare straight and quarter-turn stair layouts by rise, going and available footprint. Explore riser counts and landing splits, solve a going that fits, and export scaled-layout coordinates.
Concrete Slab Calculator
Estimate concrete slab volume, cubic yards, bag count, waste allowance, and material cost.
Concrete Block, Mortar & Grout Order Calculator
Estimate concrete blocks, mortar and core-fill grout with opening diagrams. Compare whole-bag and bulk grout orders, delivery fees, short-load charges and tax.