Bathroom Remodel Cost & Quote Calculator

Compare bathroom renovation quotes for the same scope and see how proposed selections change the budget. Enter actual quoted prices for up to thirty shared work packages or product groups and compare up to four alternatives. Fixed prices, allowances and unpriced work stay distinct: a quote with missing scope cannot receive a complete project total or be called cheapest. Add proposed changes, credits, quoted tax and discounts, then hold a separate contingency reserve. A payment and funding timeline shows when cash is needed, even if the project fits the overall budget. The examples are editable assumptions rather than local price data. This calculator does not estimate contractor quality, determine tax or legal deposit limits, size plumbing or ventilation, verify construction code compliance, approve change orders or predict resale value. Quantity units are labels and must match each quote’s unit prices; no area or currency conversion is inferred.

Bathroom project planner

Compare the scope. Plan the payments.

Turn real quotes into a clear budget: see allowances, missing work, proposed changes and the cash needed at each milestone.

Example prices are editable assumptions, not regional averages. Compare the same written scope and quantity units. A lower modeled total does not establish contractor quality, legal payment terms or code compliance.

1. Budget and shared scope

Label only; changing it does not convert prices.

Overall spending ceiling, including contingency.

Cash you can actually use at day 0. Future funds belong in the funding plan.

0–100% of forecast pretax cost. Held from day 0, not paid as a contractor installment.

Use one scope row per comparable item or work package. For a lump-sum quote, use quantity 1 and unit “job”. Match unit prices to these quantity labels; no unit conversion is inferred.

Scope 1

Describe the same work or product for every quote.

Greater than zero; up to four decimals.

For example, job, each, sq ft or m².

Scope 2

Describe the same work or product for every quote.

Greater than zero; up to four decimals.

For example, job, each, sq ft or m².

Scope 3

Describe the same work or product for every quote.

Greater than zero; up to four decimals.

For example, job, each, sq ft or m².

2. Compare quotes for the same work

A supplier or scenario label; up to 80 characters.

Demolition · 1 job

Unpriced means missing, not free. Explicit zero prices are allowed.

Enter the actual unit price, including labor if this scope combines it.

Floor tile · 100 sq ft

Unpriced means missing, not free. Explicit zero prices are allowed.

Enter the actual unit price, including labor if this scope combines it.

Replaces the allowance for forecasting. This is not an approved contract change.

Vanity · 1 each

Unpriced means missing, not free. Explicit zero prices are allowed.

Enter the actual unit price, including labor if this scope combines it.

Replaces the allowance for forecasting. This is not an approved contract change.

One-time costs outside the shared rows. Avoid counting the same cost twice.

Enter the quoted amount. The tool does not determine tax rates or taxability.

Subtracted before tax and contingency.

Proposed changes and credits

Use signed amounts: positive for an added cost, negative for a credit. Include any adjustment in the quote’s tax field separately.

3. Quote A: payment milestones

Relative days from project start, 0–730. Percentages must total 100 and days must be in order. Contingency is excluded from contractor installments. The schedule does not establish legally permitted deposits or payments.

Milestone 1

For example, start, rough-in or completion.

Whole relative day; same-day milestones are allowed.

Up to two decimals. Cumulative rounding keeps the total exact.

Milestone 2

For example, start, rough-in or completion.

Whole relative day; same-day milestones are allowed.

Up to two decimals. Cumulative rounding keeps the total exact.

Milestone 3

For example, start, rough-in or completion.

Whole relative day; same-day milestones are allowed.

Up to two decimals. Cumulative rounding keeps the total exact.

4. Future funding for the project

Shared across quotes. Include only funds expected after the starting cash balance, without counting them twice. On a given day, incoming funding is available before that day’s payments. No borrowing costs or investment return are inferred.

Funding 1

For example, planned savings or an entered financing draw.

Whole relative day, 0–730.

Enter a nonnegative amount, with up to two decimals.

2 of 2 quotes fully priced. Selected quote planned total 5,700.00 USD; funding shortfall 700.00 USD.

Same-scope quote comparison

Only fully priced quotes qualify for lowest modeled cost. Missing scope is never treated as zero. Quality, inclusions and written terms still need review.

Same-scope quote comparison
QuoteScope statusKnown selected scopePlanned totalBudget headroomCash shortfallLowest complete cost
Quote AComplete4,600.00 USD5,700.00 USD300.00 USD700.00 USDYes
Quote BComplete5,100.00 USD6,140.00 USD-140.00 USD1,140.00 USD—

Planned project total

5,700.00 USD

Contract plus held contingency.

Budget headroom

300.00 USD

Negative means over the overall budget.

Extra cash needed on schedule

700.00 USD

First deficit on day 30.

From quoted scope to planned total

Bars span the running total before and after each adjustment. Positive changes add cost; negative changes reduce it. A zero adjustment has no width.

0.00 USD5,700.00 USD
  1. Original priced scope4,000.00 USD · running 4,000.00 USD
  2. Allowance selections600.00 USD · running 4,600.00 USD
  3. Other quoted costs500.00 USD · running 5,100.00 USD
  4. Proposed changes0.00 USD · running 5,100.00 USD
  5. Discount-100.00 USD · running 5,000.00 USD
  6. Entered tax200.00 USD · running 5,200.00 USD
  7. Contingency held500.00 USD · running 5,700.00 USD

Cash available after each payment day

Step lines show end-of-day values and remain flat between events. Solid blue: spendable cash after holding contingency. Dashed purple: cumulative payments. Dotted slate: cumulative future funding, excluding starting cash. Negative spendable cash identifies a funding gap.

Top: 5,200.00 USDBottom: -700.00 USD
Day 0, after its eventsDay 30
Cash timeline exact values
DayFunding USDPayments USDCumulative funding USDCumulative payments USDReserve held USDSpendable cash USD
0052005205001980
1420002080200026005001900
300260020005200500-700

Contractor installments

Contractor installment allocation
MilestoneDayPayment USDCumulative USD
deposit0520520
rough1420802600
finish3026005200

Installments total 5,200.00 USD exactly. The 500.00 USD contingency stays separate as retained funds.

Allowance and scope detail

Original and selected scope costs
ScopePrice statusOriginal USDSelected USDChange USD
Demolitionfixed200020000
Floor tileallowance10001200200
Vanityallowance10001400400

Keep the quotes and cash plan

CSV contains all inputs, active results and explicit incomplete states for every quote. Copyable text is identical to the download.

How to use this calculator

  1. Load Refresh comparison example or Missing-scope example. Select Currency label and enter Total project budget, Cash available at project start and Contingency reserve. Currency labels do not convert entered amounts.
  2. Create the shared scope. Enter Scope name, Quantity and Quantity unit for each work package or product group. Use quantity 1 and unit job for a lump-sum item. The same scope applies to every quote.
  3. Choose Quote to edit and inspect. Set each item to Fixed quoted price, Allowance + selection or Unpriced scope. Enter actual unit prices and proposed selected prices where required. Add other quoted costs, entered tax and quoted discount.
  4. Add proposed changes or credits with signed amounts. Enter each quote’s payment milestones in day order, with percentages totaling 100. Add future project funding separately from starting cash.
  5. Compare complete project totals, missing scope, budget headroom and cash shortfalls. Inspect the selected quote’s cost waterfall, allowance detail, installment allocation and end-of-day cash timeline.
  6. Download remodeling CSV or Show copyable CSV to retain all assumptions and exact results for every quote, including explicit incomplete states. Correct required blank or invalid fields before export.

The Formula

The mathematical logic powering this calculation is:

For each priced scope row, original cost = quantity × quoted unit price, rounded half up to cents. Fixed scope keeps that cost. An allowance uses quantity × proposed selected unit price for its forecast cost, also rounded independently to cents. Allowance change = selected cost − original allowance. Unpriced rows have no cost estimate; they are not zero-priced work.

Known scope forecast = sum of priced forecast rows. For a fully priced quote, pretax forecast = known scope forecast + other quoted costs + signed proposed changes − discount. Pretax forecast cannot be negative. Contractor total = pretax forecast + entered tax. Held contingency = pretax forecast × contingency percentage, rounded half up to cents. Planned project total = contractor total + held contingency. Budget headroom = overall budget − planned total. Tax is entered as an amount, not calculated from a tax rule. Incomplete quotes retain known subtotals but have no final total, payment schedule or lowest-cost ranking.

For milestone k, cumulative amount due = contractor total × cumulative milestone percentage, rounded half up to cents. Installment k = cumulative amount due at k − cumulative amount due at k−1. Percentages must total exactly 100%, so the installments sum to the contractor total without a rounding mismatch. Milestone days are relative whole days from project start and must be nondecreasing.

For each event day, available spendable cash = starting cash + cumulative future funding − cumulative contractor payments − held contingency. Same-day funding is available before that day’s payments; events on the same day are aggregated. Contingency remains held from day 0 and is not paid as a contractor installment. Extra cash needed = max(0, negative of the lowest spendable cash balance). The first deficit day is the earliest event day with negative spendable cash. Budget headroom and payment-timing deficits measure different constraints.

Money inputs support up to 100 million currency units with two decimals; signed changes support positive or negative amounts within that range. Quantities are positive through one million with four decimals. Contingency and milestone percentages support 0–100% with two decimals. Compare 1–4 quotes, 1–30 shared scope rows, up to 24 proposed changes and 24 payment milestones per quote, and up to 24 shared funding events. Relative days support 0–730. Exact integer-cent arithmetic is retained in tables and CSV. Currency selection changes labels only. Rankings identify the lowest complete modeled total and do not compare quality or suitability.

Worked Example

If you input:

  • Shared scope: Demolition: 1 job; floor tile: 100 sq ft; vanity: 1 each
  • Quote A: Demolition 2000; tile allowance 10/sq ft, selected 12/sq ft; vanity allowance 1000, selected 1400; other costs 500; tax 200; discount 100 USD
  • Quote B: Demolition 2100; tile 14/sq ft; vanity 1600; other costs 300; tax 200; no discount USD
  • Budget and funding: Budget 6000 USD; starting cash 3000 USD; 2000 USD arrives on day14; contingency 10%
  • Quote A payments: 10% on day0, 40% on day14, 50% on day30
  • Quote B payments: 20% on day0, 30% on day14, 50% on day30

Result:

Quote A’s original priced scope is 4000 USD. Selected allowances add 600 USD, giving 4600 USD forecast scope. Adding 500 USD other costs and subtracting the 100 USD discount gives 5000 USD pretax. With 200 USD tax and 500 USD held contingency, the planned total is 5700 USD and budget headroom is 300 USD. Contractor payments are 520, 2080 and 2600 USD. Despite fitting the budget, Quote A needs 700 USD extra cash by day30. Quote B’s planned total is 6140 USD, 140 USD over budget, and its funding shortfall is 1140 USD. Quote A has the lower complete modeled total; this is not a contractor quality ranking.

Frequently Asked Questions

Does this estimate local bathroom remodeling prices?

No. Enter written quote prices or your own clearly identified assumptions. The examples are not location-specific price data. Scope, access, materials, hidden conditions and labor arrangements affect actual costs. Use the tool to compare the same specifications across quotes rather than treating an unexplained average as your budget.

How is an allowance different from unpriced work?

An allowance has an original unit price and a proposed selected unit price. The calculator shows their cost difference using the shared quantity. Unpriced work has no estimate; it prevents a complete quote total, funding schedule and cheapest-quote ranking. Enter an explicit zero only when the item is genuinely included at no additional modeled cost.

Why can I have budget headroom and still need more cash?

The overall budget describes a spending ceiling, while cash availability depends on timing. Starting cash and scheduled funding may not cover a deposit or milestone when it is due, especially while contingency is held back. The timeline reports the largest deficit and first deficit day rather than assuming the entire budget is available immediately.

Is contingency paid to the contractor?

Not in this model. It is a separate reserve calculated from the forecast pretax cost and held from day0. Contractor installments allocate the pretax cost plus entered tax. If a contingency becomes an actual proposed expense, model it as a change or scope update and reconsider the remaining reserve to avoid counting the same cost twice.

How are taxes, discounts and change orders handled?

Discount reduces the forecast pretax cost. Proposed changes can add cost or provide credits; they cannot make a complete pretax total negative. Tax is a separately entered amount and is not recalculated automatically. Enter the appropriate quoted tax adjustment after changing the scope. The model does not approve a change order or determine legal or tax treatment.

Why are installments rounded cumulatively?

Rounding each percentage payment independently can produce a total one or more cents above or below the contract. The calculator rounds cumulative percentages and takes successive differences, ensuring that a 100% schedule allocates the exact contractor total. Very small installments can be zero and remain visible.

Does this validate a deposit or payment schedule?

No. It checks numerical days and percentage totals, not local deposit limits, work-completion requirements or enforceability. Enter an agreed or proposed schedule for comparison and separately verify applicable rules and written terms. Same-day funding is assumed available before that day’s payments; this does not guarantee bank settlement timing.

Can I use different units or currencies for different quotes?

Use one currency label for the comparison and match each quote’s unit price to the shared scope unit. Changing the currency label does not convert prices. For example, a row labeled sq ft requires prices per square foot in every quote. Use a separate scope row when products or work packages cannot be compared on the same basis.