Vinyl Plank Installation Cost & Bid Audit

Audit vinyl plank flooring installation quotes against the same measured rooms. Check which bid covers each room’s work, reconcile separate carton pools and their ordered coverage, and compare known prices without counting omitted work as free.

Vinyl installation bids

Audit vinyl plank bids room by room

Bid and budget comparison

Bid B costs $145.55 less on matched scope.

Bid A

Complete entered price

$2,939.45

Stated installed area
450 ft²
Cartons in order
21
Purchased coverage
501.21 ft²
Price per installed ft²
$6.53

$89.45 over budget.

Bid B

Complete entered price

$2,793.90

Stated installed area
450 ft²
Cartons in order
21
Purchased coverage
504 ft²
Price per installed ft²
$6.21

$56.10 under budget.

Priced cost breakdown

The bars use the same USD scale and add known charges. See the coverage matrix for work left out of a bid.

Bid A$2,939.45

Bid B$2,793.90

  • Flooring cartons
  • Installation
  • Existing floor removal
  • Subfloor preparation
  • Transitions
  • Haul and disposal
  • Dashed line · $2,850.00 entered budget

Carton order audit

Bid A cartons

Pool 1 · 12 ordered · 12 minimum

250 ft² room area · 267.5 ft² with allowance · 283.68 ft² purchased

Pool 2 · 9 ordered · 9 minimum

200 ft² room area · 214 ft² with allowance · 217.53 ft² purchased

Bid B cartons

Pool 1 · 21 ordered · 21 minimum

450 ft² room area · 481.5 ft² with allowance · 504 ft² purchased

Room work coverage

Living · 250 ft²

Installation · 250 ft²
Bid A · Stated
Bid B · Stated
Transitions · 1 pieces
Bid A · Stated
Bid B · Stated

Kitchen · 200 ft²

Installation · 200 ft²
Bid A · Stated
Bid B · Stated
Existing floor removal · 200 ft²
Bid A · Stated
Bid B · Stated
Subfloor preparation · 60 ft²
Bid A · Stated
Bid B · Stated
Transitions · 2 pieces
Bid A · Stated
Bid B · Stated

Shared measured rooms and charges

Use measured installed area for labor. Enter any separate prepared or removed area and count each transition once. Use separate product pools when cartons cannot be shared.

450 ft² requested installation area

Room 1
Room 2

Enter the written bids

Mark the work stated in each room. Use In install price only when the entered installation price already covers the item. Enter separate tax only on a comparable written basis.

Living
Kitchen
Product pool 1
Product pool 2

Leave cartons blank to price the modeled minimum. Enter the actual count when auditing a written quantity.

Installation
Existing floor removal
Subfloor preparation
Transitions
Haul and disposal
Carton and charge ledgers
Independent carton purchases by product pool
Product poolMin cartonsOrderPurchased areaStandalone price
Bid A pool 11212 · Modeled283.68 ft²$691.20
Bid A pool 299 · Modeled217.53 ft²$551.25
Bid B pool 12121 · Modeled504 ft²$1,226.40
Entered and unresolved bid costs
WorkBid ABid B
Installation$1,125.00$1,057.50
Existing floor removal$240.00$220.00
Subfloor preparation$126.00$111.00
Transitions$96.00$84.00
Haul and disposal$110.00$95.00

Export the audit

Download vinyl bid CSV
View CSV text

How to use this calculator

  1. Enter the same installed, removal and preparation areas and transition counts for both proposals.
  2. Mark which bids state each room’s work. Assign the included room installations to one or two product pools per bid.
  3. Enter carton coverage, the allowance and per-carton price for each active pool. Enter a quoted order count when the written bid supplies one.
  4. Enter separate or included prices for installation, removal, prep, transitions and the selected shared charges. Review both cost and coverage, then download the audit.

The Formula

The mathematical logic powering this calculation is:

Enter the measured installed area for each of one to six nonoverlapping rooms. Record the documented area of existing floor removal and subfloor preparation, and count each shared transition once. Removal and preparation may overlap because they describe different work. For each bid, mark a room item only when its entire entered quantity is stated in that bid. Split a measured room into separate nonoverlapping rows for differently scoped portions. The coverage matrix keeps locations visible even when two bids cover the same total area.

Assign each included room installation to one of two independent product pools in each bid. A pool is one material stock group that can be purchased and shared across its assigned rooms. For that pool, target coverage equals stated installed area × (1 + entered allowance / 100). Minimum cartons equal target coverage divided by the product’s documented ft² per carton, rounded upward once per pool. If you enter an actual quoted carton count, price that count and compare its coverage against the target. Purchased coverage equals count × ft² per carton. A shortfall is the positive difference from the entered target. A shortfall does not establish a cut plan or physical inability to finish the job. A blank count models the minimum purchase without claiming it is in the actual written bid.

Multiply carton rates by whole cartons, area rates by stated areas for their respective work, and transition rates by stated pieces. Round each extended area charge once to cents, with exact half cents rounding upward. Fixed quotes add their entered dollar amount. The installation line can hold a documented package price. A line marked In install price adds no standalone charge if the installation price is entered. Omitted and unpriced scope keeps the known subtotal available and the matched total incomplete. A separately priced zero is an explicit known amount. Do not assume another bid’s prices or another room’s coverage.

Haul and disposal and separately written tax can be selected as shared scope. Enter written tax or its confirmed inclusion on a comparable basis for both quotes. No tax rate, sales-tax rules or deduction from a bundled total is inferred. The entered complete price per installed ft² divides by included installed area, not purchased coverage. The optional budget compares complete project costs to an entered amount. A like-for-like cost difference requires all entered room work stated on both sides, resolved shared price lines and carton targets met in each active pool. Product specifications and finish equivalence remain outside the comparison.

Enter 0.01 to 100,000 ft² installed per room, up to that area for prep or removal and up to 100 transition pieces per room. Use carton coverage 0.01 to 1,000 ft², allowance 0 to 100 percent, and nonnegative USD rates and fixed charges through $1,000,000 each. Area, allowance and entered USD values support at most two decimals. Enter optional actual counts as whole nonnegative cartons up to 120,000,000. All sizes and charges are inputs; this worksheet supplies no price database, material approval, installation method, substrate assessment or local requirements.

Worked Example

If you input:

  • Shared measured rooms and charges: 250 ft² Living and 200 ft² Kitchen. The Kitchen has 200 ft² removal and 60 ft² preparation. Three transitions and haul/disposal are in scope; no added tax.
  • Bid A: Separate 23.64 and 24.17 ft² carton pools at 7% allowance, $57.60 and $61.25 per carton. Installation $2.50/ft², removal $1.20/ft², prep $2.10/ft², transitions $32 each and disposal $110.
  • Bid B: A shared 24 ft² carton pool for both rooms, 7% allowance, $58.40 per carton. Installation $2.35/ft², removal $1.10/ft², prep $1.85/ft², transitions $28 each and disposal $95.

Result:

Bid A buys 12 and 9 cartons for 501.21 ft² purchased coverage and totals $2,939.45. Bid B buys 21 cartons for 504 ft² purchased coverage and totals $2,793.90. Both cover 450 installed ft². With the entered scope matched, Bid B costs $145.55 less.

Frequently Asked Questions

What goes in a product pool?

Use a pool for documented cartons that can supply the same set of rooms. Keep separate product groups or nonshareable stock in separate pools, so carton remainders are not transferred.

Why are purchased square feet higher than installed square feet?

The entered allowance increases the material target, and purchasing only full cartons can add coverage again. Labor area remains the measured installed area stated in the bid.

What if the bid lists fewer cartons than the worksheet minimum?

Enter its actual count to price the written quantity. The worksheet reports the coverage shortfall against the entered allowance, even if the order nominally exceeds installed area.

Does an included price mean the work costs zero?

Use In install price when the entered installation price already covers the item. Omitted and unpriced work have distinct statuses and keep a direct complete comparison open.

How should I enter tax or haul charges?

Choose whether those charges belong in both bid comparisons. Enter the documented fixed amount, a confirmed inclusion in the main price, or an unresolved status.

Does this audit check plank cuts, preparation methods or flooring compatibility?

It compares written room work, area and whole-carton purchasing. Use the related layout calculator to examine plank cuts and entered geometry.

Similar Calculators