Vinyl Plank Installation Cost & Bid Audit
Audit vinyl plank flooring installation quotes against the same measured rooms. Check which bid covers each room’s work, reconcile separate carton pools and their ordered coverage, and compare known prices without counting omitted work as free.
Audit vinyl plank bids room by room
Compare stated work, check whole-carton purchases by product pool and reconcile labor against installed area.
Bid and budget comparison
Bid B costs $145.55 less on matched scope.
Bid A
Complete entered price
$2,939.45
- Stated installed area
- 450 ft²
- Cartons in order
- 21
- Purchased coverage
- 501.21 ft²
- Price per installed ft²
- $6.53
$89.45 over budget.
Bid B
Complete entered price
$2,793.90
- Stated installed area
- 450 ft²
- Cartons in order
- 21
- Purchased coverage
- 504 ft²
- Price per installed ft²
- $6.21
$56.10 under budget.
Priced cost breakdown
The bars use the same USD scale and add known charges. See the coverage matrix for work left out of a bid.
Bid A$2,939.45
Bid B$2,793.90
- Flooring cartons
- Installation
- Existing floor removal
- Subfloor preparation
- Transitions
- Haul and disposal
- Dashed line · $2,850.00 entered budget
Carton order audit
Bid A cartons
Pool 1 · 12 ordered · 12 minimum
250 ft² room area · 267.5 ft² with allowance · 283.68 ft² purchased
Pool 2 · 9 ordered · 9 minimum
200 ft² room area · 214 ft² with allowance · 217.53 ft² purchased
Bid B cartons
Pool 1 · 21 ordered · 21 minimum
450 ft² room area · 481.5 ft² with allowance · 504 ft² purchased
Room work coverage
Living · 250 ft²
- Installation · 250 ft²
- Bid A · Stated
- Bid B · Stated
- Transitions · 1 pieces
- Bid A · Stated
- Bid B · Stated
Kitchen · 200 ft²
- Installation · 200 ft²
- Bid A · Stated
- Bid B · Stated
- Existing floor removal · 200 ft²
- Bid A · Stated
- Bid B · Stated
- Subfloor preparation · 60 ft²
- Bid A · Stated
- Bid B · Stated
- Transitions · 2 pieces
- Bid A · Stated
- Bid B · Stated
Shared measured rooms and charges
Use measured installed area for labor. Enter any separate prepared or removed area and count each transition once. Use separate product pools when cartons cannot be shared.
450 ft² requested installation area
Enter the written bids
Mark the work stated in each room. Use In install price only when the entered installation price already covers the item. Enter separate tax only on a comparable written basis.
Leave cartons blank to price the modeled minimum. Enter the actual count when auditing a written quantity.
Carton and charge ledgers
| Product pool | Min cartons | Order | Purchased area | Standalone price |
|---|---|---|---|---|
| Bid A pool 1 | 12 | 12 · Modeled | 283.68 ft² | $691.20 |
| Bid A pool 2 | 9 | 9 · Modeled | 217.53 ft² | $551.25 |
| Bid B pool 1 | 21 | 21 · Modeled | 504 ft² | $1,226.40 |
| Work | Bid A | Bid B |
|---|---|---|
| Installation | $1,125.00 | $1,057.50 |
| Existing floor removal | $240.00 | $220.00 |
| Subfloor preparation | $126.00 | $111.00 |
| Transitions | $96.00 | $84.00 |
| Haul and disposal | $110.00 | $95.00 |
Export the audit
Download vinyl bid CSVView CSV text
How to use this calculator
- Enter the same installed, removal and preparation areas and transition counts for both proposals.
- Mark which bids state each room’s work. Assign the included room installations to one or two product pools per bid.
- Enter carton coverage, the allowance and per-carton price for each active pool. Enter a quoted order count when the written bid supplies one.
- Enter separate or included prices for installation, removal, prep, transitions and the selected shared charges. Review both cost and coverage, then download the audit.
The Formula
The mathematical logic powering this calculation is:
Enter the measured installed area for each of one to six nonoverlapping rooms. Record the documented area of existing floor removal and subfloor preparation, and count each shared transition once. Removal and preparation may overlap because they describe different work. For each bid, mark a room item only when its entire entered quantity is stated in that bid. Split a measured room into separate nonoverlapping rows for differently scoped portions. The coverage matrix keeps locations visible even when two bids cover the same total area.
Assign each included room installation to one of two independent product pools in each bid. A pool is one material stock group that can be purchased and shared across its assigned rooms. For that pool, target coverage equals stated installed area × (1 + entered allowance / 100). Minimum cartons equal target coverage divided by the product’s documented ft² per carton, rounded upward once per pool. If you enter an actual quoted carton count, price that count and compare its coverage against the target. Purchased coverage equals count × ft² per carton. A shortfall is the positive difference from the entered target. A shortfall does not establish a cut plan or physical inability to finish the job. A blank count models the minimum purchase without claiming it is in the actual written bid.
Multiply carton rates by whole cartons, area rates by stated areas for their respective work, and transition rates by stated pieces. Round each extended area charge once to cents, with exact half cents rounding upward. Fixed quotes add their entered dollar amount. The installation line can hold a documented package price. A line marked In install price adds no standalone charge if the installation price is entered. Omitted and unpriced scope keeps the known subtotal available and the matched total incomplete. A separately priced zero is an explicit known amount. Do not assume another bid’s prices or another room’s coverage.
Haul and disposal and separately written tax can be selected as shared scope. Enter written tax or its confirmed inclusion on a comparable basis for both quotes. No tax rate, sales-tax rules or deduction from a bundled total is inferred. The entered complete price per installed ft² divides by included installed area, not purchased coverage. The optional budget compares complete project costs to an entered amount. A like-for-like cost difference requires all entered room work stated on both sides, resolved shared price lines and carton targets met in each active pool. Product specifications and finish equivalence remain outside the comparison.
Enter 0.01 to 100,000 ft² installed per room, up to that area for prep or removal and up to 100 transition pieces per room. Use carton coverage 0.01 to 1,000 ft², allowance 0 to 100 percent, and nonnegative USD rates and fixed charges through $1,000,000 each. Area, allowance and entered USD values support at most two decimals. Enter optional actual counts as whole nonnegative cartons up to 120,000,000. All sizes and charges are inputs; this worksheet supplies no price database, material approval, installation method, substrate assessment or local requirements.Worked Example
If you input:
- Shared measured rooms and charges: 250 ft² Living and 200 ft² Kitchen. The Kitchen has 200 ft² removal and 60 ft² preparation. Three transitions and haul/disposal are in scope; no added tax.
- Bid A: Separate 23.64 and 24.17 ft² carton pools at 7% allowance, $57.60 and $61.25 per carton. Installation $2.50/ft², removal $1.20/ft², prep $2.10/ft², transitions $32 each and disposal $110.
- Bid B: A shared 24 ft² carton pool for both rooms, 7% allowance, $58.40 per carton. Installation $2.35/ft², removal $1.10/ft², prep $1.85/ft², transitions $28 each and disposal $95.
Result:
Bid A buys 12 and 9 cartons for 501.21 ft² purchased coverage and totals $2,939.45. Bid B buys 21 cartons for 504 ft² purchased coverage and totals $2,793.90. Both cover 450 installed ft². With the entered scope matched, Bid B costs $145.55 less.
Frequently Asked Questions
What goes in a product pool?
Use a pool for documented cartons that can supply the same set of rooms. Keep separate product groups or nonshareable stock in separate pools, so carton remainders are not transferred.
Why are purchased square feet higher than installed square feet?
The entered allowance increases the material target, and purchasing only full cartons can add coverage again. Labor area remains the measured installed area stated in the bid.
What if the bid lists fewer cartons than the worksheet minimum?
Enter its actual count to price the written quantity. The worksheet reports the coverage shortfall against the entered allowance, even if the order nominally exceeds installed area.
Does an included price mean the work costs zero?
Use In install price when the entered installation price already covers the item. Omitted and unpriced work have distinct statuses and keep a direct complete comparison open.
How should I enter tax or haul charges?
Choose whether those charges belong in both bid comparisons. Enter the documented fixed amount, a confirmed inclusion in the main price, or an unresolved status.
Does this audit check plank cuts, preparation methods or flooring compatibility?
It compares written room work, area and whole-carton purchasing. Use the related layout calculator to examine plank cuts and entered geometry.
Similar Calculators
Plank Flooring Layout & Cost Calculator
Compare plank flooring layouts, staggered rows and compatible offcut reuse. Visualize cuts, check entered installation limits, estimate whole packs and project costs.
Hardwood Installation Cost & Phase Planner
Compare installed hardwood quotes by room. Reconcile whole cartons, quoted subfloor preparation and elapsed dates for room access.
Floor-Leveling Compound Depth & Bag Planner
Estimate self-leveling compound from measured floor elevations. Compare finish heights, buildup limits, geometric volume, whole bags and material costs.
Subfloor Patch Layout & Replacement Quote Planner
Compare measured subfloor damage, documented repair openings, orientation-locked sheet cuts and entered replacement quotes.