Hardwood Installation Cost & Phase Planner

Enter two contractor proposals for the same measured rooms. Compare flooring cartons, installation, removal, subfloor preparation, transitions and separate outside work. Plan room-by-room delivery and installation milestones from quoted release days using one crew.

Flooring project

Compare hardwood installation quotes and room access

Reconcile cartons and priced preparation for the same rooms. Plan each room’s access milestone around delivery gates and one shared installation crew.

Installed cost and final access

Proposal A

Measured flooring
450 ft²
Cartons
19
Project cost
$5,580.00
Final access
Day 9

Proposal B

Measured flooring
450 ft²
Cartons
17
Project cost
$5,401.00 known
Final access
Pending

Complete both project prices to compare costs.

Resolve pending milestones to compare project access.

Edit zones and proposals

Measured zones in crew order

Use nonoverlapping room areas. Removal and approved subfloor preparation are separate measured portions and can overlap. The same crew order applies to both proposals.

Zone 1

Zone 2

Proposal A

Proposal A cartons and shared milestones
Proposal A room costs and release days

Use written milestones, with the pre-delivery release before any planned delivery. The lag covers the elapsed time from planned delivery to the entered material-ready point.

Proposal A Living
Proposal A Kitchen
Proposal A project-wide charges

Proposal B

Proposal B cartons and shared milestones
Proposal B room costs and release days

Use written milestones, with the pre-delivery release before any planned delivery. The lag covers the elapsed time from planned delivery to the entered material-ready point.

Proposal B Living
Proposal B Kitchen
Proposal B project-wide charges

Room installation and access timeline

Both proposals use elapsed days from the same project start and share the same chart scale. Installation follows the entered room order. A room’s access hold may overlap the next installation.

  • Material lag
  • Installation
  • Access hold

Proposal A

Day 0Day 9
Living

Access day 7

Pre-delivery release
Day 3
Delivery
Day 3
Materials ready
Day 4
Install start
Day 4
Install finish
Day 6
Access
Day 7

Controls start: Materials ready · Crew available

Kitchen

Access day 9

Pre-delivery release
Day 5
Delivery
Day 5
Materials ready
Day 6
Install start
Day 6
Install finish
Day 7
Access
Day 9

Controls start: Materials ready · Prior installation

Proposal B

Day 0Day 9
Living

Access day 7

Pre-delivery release
Day 1
Delivery
Day 3
Materials ready
Day 5
Install start
Day 5
Install finish
Day 6
Access
Day 7

Controls start: Materials ready

Kitchen

Access pending

Pre-delivery release
Pending
Delivery
Pending
Materials ready
Pending
Install start
Pending
Install finish
Pending
Access
Pending

Pending · Pre-delivery release

Flooring carton reconciliation

Each proposal pools its compatible stock across the listed rooms. Installed labor uses measured room area. The material allowance affects cartons only.

Proposal A

Somerset solid flooring

Required coverage
472.5 ft²
Purchased coverage
475 ft²
Entered allowance area
22.5 ft²
Whole-carton excess
2.5 ft²

Proposal B

Somerset SolidPlus XP engineered

Required coverage
486 ft²
Purchased coverage
510 ft²
Entered allowance area
36 ft²
Whole-carton excess
24 ft²

Written quote scope and preparation

Known external charges stay separate from the vendor subtotal. Include both in the complete project price. An open required line leaves that price pending.

Proposal A

Known vendor charges
$5,580.00
Known external charges
$0.00
Known project subtotal
$5,580.00
Complete project total
$5,580.00
Show proposal a price lines
Project · Flooring cartons
$2,660.00
Living · Installation
$1,250.00
Kitchen · Installation
$1,000.00
Kitchen · Removal
$400.00
Kitchen · Subfloor preparation
$180.00
Project · Transitions
$90.00
Project · Delivery
Included
Project · Fees or tax
Included

Proposal B

Known vendor charges
$5,401.00
Known external charges
$0.00
Known project subtotal
$5,401.00
Complete project total
Pending
Show proposal b price lines
Project · Flooring cartons
$2,601.00
Living · Installation
$1,300.00
Kitchen · Installation
$1,040.00
Kitchen · Removal
$300.00
Kitchen · Subfloor preparation
External price pending
Project · Transitions
$110.00
Project · Delivery
$50.00
Project · Fees or tax
Included

Comparison export

Download hardwood comparison CSV
Show selectable CSV text

The schedule uses your entered milestones. Actual site acceptance, product suitability, conditioning, installation and safe access depend on the written project requirements.

How to use this calculator

  1. Enter the measured flooring and documented removal and preparation areas for the same rooms. Put rooms in the entered crew order.
  2. Enter carton coverage, a material allowance and the known stock price for each proposal.
  3. Enter installation, removal, preparation, transitions and other written charges. Keep required outside scope together with any known external prices.
  4. Enter off-site stock and crew availability, the documented pre-delivery release for each room, and the lag, duration and hold from the proposed plan.
  5. Review the phase timeline, cost differences and open scope. Download the current quote and access schedules as CSV.

The Formula

The mathematical logic powering this calculation is:

Use up to six nonoverlapping rooms in the same order for both proposals. Enter measured installation area, and the portions of each room that require removal and subfloor preparation. Either optional area may be zero. The two optional areas may overlap because they describe separate work. A measured preparation area reflects the user's documented scope.

For each proposal, add installed areas and apply the entered material allowance. Cartons equal required area divided by the declared coverage per carton, rounded up once for the pooled product. Purchased coverage equals carton count times carton coverage. Purchased coverage less required coverage is whole-carton excess. Quantities represent one product group in each proposal. The worksheet does not calculate individual plank counts, cut yield or product compatibility.

Apply an area rate only to the measured area of that work. Transitions may use a rate per piece, flooring stock may use a rate per carton, and all active quote lines can use a fixed total. Add priced vendor items and separately confirmed external items for the full project cost. Included means another entered line already accounts for the charge or it costs nothing extra. Unpriced and externally assigned work without an amount leave the complete project cost open. Areas are entered to hundredths of a square foot, allowance to hundredths of a percentage point, and rates to cents. Each charge rounds once to the nearest cent with half-cent ties rounding up. Enter applicable taxes or fees as an authored price, with no inferred rates.

Use elapsed whole days from the same project Day 0. Planned delivery takes the later of the off-site stock availability and the room's documented pre-delivery release. Materials ready is delivery plus the entered lag. Install start takes the latest of materials ready, crew availability and the preceding room's installation finish. Report every constraint tied at the latest day. Installation finish is start plus the entered duration. A room's access milestone is installation finish plus its own entered hold. Access holds can overlap later installation. The latest room access is the final project access milestone. An unknown gate keeps dependent milestones pending.

The phase sequence models one shared crew with staggered planned delivery when documented. The worksheet does not infer product-specific conditioning, installation methods, site acceptance or actual safe re-entry. Use the contractor's written criteria and times. The Somerset products in the example illustrate published 25 and 30 ft² carton capacities. All example amounts and dates are illustrative.

Worked Example

If you input:

  • Measured rooms: 250 ft² Living and 200 ft² Kitchen. Kitchen includes 200 ft² removal and 60 ft² preparation.
  • Proposal A: 25 ft² cartons, 5% material allowance, $140 per carton. Both rooms have dated milestones.
  • Proposal B: 30 ft² cartons, 8% material allowance, $153 per carton. Kitchen preparation is assigned outside the quote and its release is pending.

Result:

The measured total is 450 ft². Proposal A buys 19 cartons, costs $5,580, and has final access on Day 9 under its entered milestones. Proposal B buys 17 cartons and has $5,401 in known charges. Its external preparation amount and kitchen release remain open. The staged example supplies those entries and shows $5,641 with final access on Day 7.

Frequently Asked Questions

Why are purchased square feet different from installed square feet?

Material allowance increases the target coverage. Whole cartons can add further coverage above that target. Area-rated labor uses the measured work area.

Can I compare both quotes while a preparation charge is missing?

The known subtotal remains available for each proposal. A direct complete price comparison appears after each required item has an entered charge or confirmed included status.

How do I record work the flooring company excludes?

Use External for required work assigned outside the proposal. Enter the known fixed charge or applicable unit rate if available. It appears separately from the contractor's quoted work and contributes to the complete project cost.

Why can a room wait after its materials are ready?

The shared crew can enter the room when scheduled availability and the prior room's installation permit it. The timeline names any tied constraints.

Does the worksheet estimate a required conditioning period?

Enter the time and documented release specified for the actual flooring and site. The worksheet organizes those inputs and never tests or certifies the installation conditions.

How does an access hold change the next room's start?

The hold contributes to access for that room. The next room uses the previous installation finish, so an access hold can overlap a later installation.

How do I compare plank cuts and joint positions?

Use the Plank Flooring Layout & Cost Calculator with your product geometry. This worksheet compares installed quotes and scheduling for measured rooms.