Straight Stair Opening & Headroom Calculator

Use measured risers, nosing-to-nosing going and overhead elevations to compare two floor opening edges over one straight flight. See the exact minimum vertical clearance on each section, identify the controlling projection and calculate the opening change implied by your target.

Stair geometry · Measured section

Compare stair opening headroom

Edit flight, openings and overhead

Measure horizontal stations and underside elevations from the first nosing. Measure each opening downhill from the last modeled nosing.

Only opening B meets the entered clearance target.

Opening requirement within this flight

Modeled flight length
140 in
Entered clearance target
70.2 in
Minimum modeled opening
116 in

Opening A · 110 in

66 in

Minimum vertical clearance

Target margin
−4.2 in
Limiting obstacle
Floor edge
Additional opening needed
6 in

Opening B · 116 in

70.2 in

Minimum vertical clearance

Target margin
0 in
Limiting obstacle
Floor edge
Additional opening needed
0 in

Inspect the stair section and clearance profile

Straight stair section

Elevation (in) by station from the first nosing (in)

0 in140 in

Elevation axis 0 in to 168.2 in

Blue nosing line, purple floor underside, dotted target offset. Vertical marks show limiting locations.

Opening B · 116 in

Minimum vertical clearance
70.2 in
Minimum minus target
0 in
Floor edge · Governs
Uphill end station
24 in
Clearance at uphill end
70.2 in
Review the exact headroom ledger

All dimensions are in inches. Exact fractions preserve the geometry before display rounding.

Modeled span endpoints and clearances for both opening options
OpeningObstacleStart stationEnd stationUndersideEnd clearanceGovernsTarget margin
AFloor edge0308766Yes-21/5
BFloor edge02487351/5Yes0

How to use this calculator

  1. Enter the uniform rise, going and number of intervals between the first and last nosing you want to model.
  2. Enter the underside elevation of the floor relative to your first nosing, both opening lengths measured from the upper end and your clearance target.
  3. Enable the beam if you have a separate overhead projection. Record its underside elevation and both stations from the first nosing.
  4. Compare the limiting clearances, switch between the stair section and clearance profile, and review the exact ledger.

The Formula

The mathematical logic powering this calculation is:

Measure horizontal station x uphill from your first modeled nosing, with zero elevation at that nosing. Enter n equal intervals between the first and last modeled nosing positions, rise r between adjacent nosings and horizontal going g from one nosing to the next. The measured line rises by z(x) = xr/g over 0 ≤ x ≤ ng. Fourteen intervals span fifteen modeled positions. This count refers to the entered nosing line segment.

An opening of horizontal length O extends downhill from the last modeled nosing. Its downhill edge is x = ng − O. The underside U of the horizontal floor covers the closed interval from the first nosing to that edge, including the edge itself. A full-length opening leaves the edge at the first nosing in this model. The optional beam spans its two measured stations independently of the opening, with both endpoints included. Its underside stays horizontal.

At a covered station, vertical clearance is underside elevation minus z(x). Clearance decreases uphill under any horizontal underside, so each obstacle is checked at its uphill end. The minimum reported for an opening is the smaller of its floor and beam clearances when both are present. A tie lists both. Negative clearance represents a geometric overlap along the measured line. The chart leaves uncovered stations without a clearance value.

For an entered clearance target T, the largest allowed floor-edge station is (U − T)g/r. If U is at least T, the minimum modeled opening is the greater of zero and ng minus that station. If U is below T, the floor edge at the first nosing already misses the target. When the beam’s uphill-end clearance misses T, changing the floor opening alone does not resolve the comparison. Equality meets an entered target. All comparisons are exact before rounding display values.

Use inches, with up to three decimals. Enter 1–40 whole intervals, rise and going of 0.001–60 in, signed underside elevations from −2,400 to 2,400 in, and a positive target through 2,400 in. Opening lengths and beam stations must be within the modeled flight. The example target is an editable geometric benchmark. The results describe one straight section. Assess landings, full stair width, irregular projections, framing, guards and applicable requirements separately.

Worked Example

If you input:

  • Straight flight: 14 nosing intervals, 7 in rise, 10 in going
  • Floor and target: 87 in underside elevation, 70.2 in entered clearance target
  • Opening lengths: A 110 in, B 116 in, beam off

Result:

Opening A leaves its floor edge at station 30 in and provides 66 in minimum clearance. B moves that edge to 24 in, provides 70.2 in exactly, and is the minimum modeled opening for the entered target.

Frequently Asked Questions

Where does the stair reference start?

Set the first modeled nosing to station and elevation zero. Measure the other stations horizontally uphill from that point.

Why use the nosing line?

It defines the geometric reference for the vertical measurement at any station, including a floor edge between two treads.

Does a full-length opening remove the floor from this model?

The floor edge stays at the first nosing and counts as an obstruction there. An opening extending downhill beyond that nosing is outside this measured segment model.

Can the floor and beam both control headroom?

Yes. If their minimum clearances are equal, both display as limiting locations. A lower beam can also control even when the floor edge meets your target.

How should I read a negative clearance?

The entered underside is below the nosing reference at that station. The signed result preserves the modeled overlap.

Does reaching my target establish code compliance?

It verifies the entered geometry and threshold along this line. A project assessment requires the applicable rules and measured overhead surfaces across the whole route.

Similar Calculators