Shared EV Charging Power & Departure Calculator
Plan two electric vehicle charging sessions that start together and may depart at different times. Enter the battery energy to add, charging efficiency and each port’s usable input power. Find the minimum shared grid power, check the entered site limit, and inspect an exact two-phase allocation.
Fit two EV charging targets under one shared limit
Compare two departure deadlines from the same connection time.
Both targets fit exactly at this shared power limit.
Energy needed before the first departure
Vehicle A needs its full target before minute 120. Vehicle B needs 16 kWh in that same interval.
Vehicle A 20 kWh · Vehicle B 16 kWh
0 kWh signed margin
Through minute 120
A 10 kW · B 8 kW
18 kW shared draw
Through minute 180
A 0 kW · B 12 kW
12 kW shared draw
Review the exact charging allocation
Inspect exact charging quantities
- Vehicle A grid energy
- 20 kWh
- Vehicle B grid energy
- 28 kWh
- Minimum shared power
- 18 kW
- Shared-window margin
- 0 kWh
How to use this calculator
- Enter usable shared power from the same grid side as the port limits.
- Enter each vehicle’s battery energy needed, effective charging efficiency, port limit and minutes until departure.
- Check the minimum shared power and the energy margin in the shared interval. Identify a port constraint if the site limit alone cannot meet a target.
- Compare the allocation phases and export the exact energy and power ledger.
The Formula
The mathematical logic powering this calculation is:
Grid energy for each vehicle equals battery energy divided by its entered efficiency fraction. Convert both departure times to hours elapsed from the common connection time. Call the earlier time t₁ and the interval after the earlier departure t₂. Let E₁ and E₂ be grid energy for the earlier and later vehicle, P₁ and P₂ their port limits and S the shared site allowance. First check E₁ ≤ P₁t₁ and E₂ ≤ P₂(t₁+t₂). If a port fails this test a larger shared allowance alone cannot make the schedule feasible.
The later vehicle can receive no more than t₂ × min(P₂,S) after the first leaves. Supply the remaining positive energy during the first phase along with E₁. Compare that total with St₁. The minimum shared power when both port-level tests pass is the maximum of E₁/t₁, (E₁+E₂)/(t₁+t₂), and (E₁+E₂−P₂t₂)/t₁. These limits express the early vehicle demand, all energy across the full window, and all energy when the later vehicle is capped in phase two. Exact equality is feasible.
In a feasible schedule the first phase supplies all the early vehicle’s energy and the minimum reserve needed by the later vehicle. The second phase supplies the later vehicle’s remaining energy, if the interval exists. Use constant, continuously adjustable per-port grid power, constant charging efficiency and a single common start. This omits charging taper, minimum current, controller behavior, other load changes and electrical design.Worked Example
If you input:
- Vehicle A: 18 kWh to battery at 90%, 12 kW port, leaves at 120 minutes.
- Vehicle B: 25.2 kWh to battery at 90%, 12 kW port, leaves at 180 minutes.
- Shared grid allowance: 18 kW
Result:
A needs 20 grid kWh and B needs 28. At 18 kW, give A 10 kW and B 8 kW during the first two hours. B draws 12 kW in the final hour. The minimum shared allowance is exactly 18 kW.
Frequently Asked Questions
Why charge the later vehicle before the earlier one leaves?
It may need more energy than its port can deliver during the later-only interval. The first-phase reserve is the amount of that energy that has to be delivered early.
What happens if both vehicles leave at the same time?
There is only a shared phase. Each vehicle must receive its complete energy within its own port limit and the total must fit the shared limit.
Can a larger site allowance fix a port bottleneck?
Only if the usable port rate or departure window also changes. The port check compares the energy it can deliver over the whole time that vehicle is plugged in.
What if the charger power tapers?
Use a separate model for changing acceptance or use a conservative constant rate appropriate to the intended interval. This worksheet uses fixed power ceilings throughout each phase.
Why use grid energy rather than battery energy to allocate power?
The power constraints apply to the grid draw. A vehicle needs more incoming energy than it stores when charging efficiency is below 100%.
Similar Calculators
EV Charging Time Calculator & Target Planner
Compare two EV charging sessions using battery acceptance bands, available power and charging efficiency. See how much charge fits in your time window.
EV Charging Cost Calculator
Estimate electric vehicle charging cost, trip cost, cost per mile, and gasoline-equivalent savings.
Electric Demand Ratchet Calculator
Compare monthly demand charges using recorded historical peaks, two future peak schedules, and an entered tariff’s rolling demand floor.
Electricity Bill & Rate Comparison Calculator
Compare electricity bills with flat, time-of-use or tiered rates. Enter usage and fees, then find how much peak electricity you would need to shift to break even.