Shared EV Charging Power & Departure Calculator

Plan two electric vehicle charging sessions that start together and may depart at different times. Enter the battery energy to add, charging efficiency and each port’s usable input power. Find the minimum shared grid power, check the entered site limit, and inspect an exact two-phase allocation.

Shared charging

Fit two EV charging targets under one shared limit

Vehicle A
Vehicle B

Both targets fit exactly at this shared power limit.

Minimum shared power
18 kW
For the two stated departures
Signed shared-window margin
0 kWh
Available minus required before first departure

Energy needed before the first departure

Vehicle A needs its full target before minute 120. Vehicle B needs 16 kWh in that same interval.

Required grid energy36 kWh

Vehicle A 20 kWh · Vehicle B 16 kWh

Shared capacity36 kWh

0 kWh signed margin

Through minute 120

A 10 kW · B 8 kW

18 kW shared draw

Through minute 180

A 0 kW · B 12 kW

12 kW shared draw

Review the exact charging allocation

Inspect exact charging quantities
Vehicle A grid energy
20 kWh
Vehicle B grid energy
28 kWh
Minimum shared power
18 kW
Shared-window margin
0 kWh

How to use this calculator

  1. Enter usable shared power from the same grid side as the port limits.
  2. Enter each vehicle’s battery energy needed, effective charging efficiency, port limit and minutes until departure.
  3. Check the minimum shared power and the energy margin in the shared interval. Identify a port constraint if the site limit alone cannot meet a target.
  4. Compare the allocation phases and export the exact energy and power ledger.

The Formula

The mathematical logic powering this calculation is:

Grid energy for each vehicle equals battery energy divided by its entered efficiency fraction. Convert both departure times to hours elapsed from the common connection time. Call the earlier time t₁ and the interval after the earlier departure t₂. Let E₁ and E₂ be grid energy for the earlier and later vehicle, P₁ and P₂ their port limits and S the shared site allowance. First check E₁ ≤ P₁t₁ and E₂ ≤ P₂(t₁+t₂). If a port fails this test a larger shared allowance alone cannot make the schedule feasible.
The later vehicle can receive no more than t₂ × min(P₂,S) after the first leaves. Supply the remaining positive energy during the first phase along with E₁. Compare that total with St₁. The minimum shared power when both port-level tests pass is the maximum of E₁/t₁, (E₁+E₂)/(t₁+t₂), and (E₁+E₂−P₂t₂)/t₁. These limits express the early vehicle demand, all energy across the full window, and all energy when the later vehicle is capped in phase two. Exact equality is feasible.
In a feasible schedule the first phase supplies all the early vehicle’s energy and the minimum reserve needed by the later vehicle. The second phase supplies the later vehicle’s remaining energy, if the interval exists. Use constant, continuously adjustable per-port grid power, constant charging efficiency and a single common start. This omits charging taper, minimum current, controller behavior, other load changes and electrical design.

Worked Example

If you input:

  • Vehicle A: 18 kWh to battery at 90%, 12 kW port, leaves at 120 minutes.
  • Vehicle B: 25.2 kWh to battery at 90%, 12 kW port, leaves at 180 minutes.
  • Shared grid allowance: 18 kW

Result:

A needs 20 grid kWh and B needs 28. At 18 kW, give A 10 kW and B 8 kW during the first two hours. B draws 12 kW in the final hour. The minimum shared allowance is exactly 18 kW.

Frequently Asked Questions

Why charge the later vehicle before the earlier one leaves?

It may need more energy than its port can deliver during the later-only interval. The first-phase reserve is the amount of that energy that has to be delivered early.

What happens if both vehicles leave at the same time?

There is only a shared phase. Each vehicle must receive its complete energy within its own port limit and the total must fit the shared limit.

Can a larger site allowance fix a port bottleneck?

Only if the usable port rate or departure window also changes. The port check compares the energy it can deliver over the whole time that vehicle is plugged in.

What if the charger power tapers?

Use a separate model for changing acceptance or use a conservative constant rate appropriate to the intended interval. This worksheet uses fixed power ceilings throughout each phase.

Why use grid energy rather than battery energy to allocate power?

The power constraints apply to the grid draw. A vehicle needs more incoming energy than it stores when charging efficiency is below 100%.