EV Charging Time Calculator & Target Planner
Model the same battery and charging target with two available power levels. Enter the vehicle’s accepted power by state of charge and see how a taper changes travel timing. The worksheet reports completion time, energy pulled from the supply, and state of charge at the end of your reservation or departure window.
Compare EV charging sessions
See how available supply, battery acceptance and start delay affect the same charging target.
Compare charge time and departure readiness
Session A
Charge at deadline
84.15%
Supply by deadline
53.46 kWh
Session B
Charge at deadline
90%
Supply by deadline
58.33 kWh
Edit battery, deadline and sessions
Edit battery acceptance bands (3)
Start at 0% and use ascending charge levels. Pack power stays at the entered cap until the next band.
Charge across the time window
The dashed line marks your target. A flat trace shows a delay, completed target or stopped session.
Open charging segment ledger
Session A stores 52.5 kWh and uses 58.333 kWh from the supply by completion or stop.
| Charge interval | Elapsed start | Elapsed end | Delivered to pack | Power limit | Stored | From supply |
|---|---|---|---|---|---|---|
| 20% to 70% | 0 s | 41 min 40 s | 54 kW | Supply limited | 37.5 kWh | 41.667 kWh |
| 70% to 80% | 41 min 40 s | 50 min 40 s | 50 kW | Battery limited | 7.5 kWh | 8.333 kWh |
| 80% to 90% | 50 min 40 s | 1 h 13 min 10 s | 20 kW | Battery limited | 7.5 kWh | 8.333 kWh |
Session B stores 52.5 kWh and uses 58.333 kWh from the supply by completion or stop.
| Charge interval | Elapsed start | Elapsed end | Delivered to pack | Power limit | Stored | From supply |
|---|---|---|---|---|---|---|
| 20% to 70% | 5 min | 27 min 30 s | 100 kW | Battery limited | 37.5 kWh | 41.667 kWh |
| 70% to 80% | 27 min 30 s | 36 min 30 s | 50 kW | Battery limited | 7.5 kWh | 8.333 kWh |
| 80% to 90% | 36 min 30 s | 59 min | 20 kW | Battery limited | 7.5 kWh | 8.333 kWh |
Show copyable CSV
How to use this calculator
- Enter usable battery capacity, starting and target percentages, and the time available before departure.
- Enter the effective supply-side kW, charging efficiency and any start delay for each session.
- Enter the accepted pack power by state-of-charge range. Use data for the conditions you are comparing, with inclusive starting percentages.
- Compare completion and the end-of-window charge. Open the segment ledger to reconcile active bottlenecks, energy and elapsed time.
The Formula
The mathematical logic powering this calculation is:
Each entered acceptance band begins at its lower state of charge and ends before the next band. Only the overlap from starting to target state of charge contributes to duration. Stored energy in a band = usable battery capacity × fraction of state-of-charge points traversed.
Pack-side power is the lower of entered pack acceptance and available supply power × wall-to-pack efficiency. Active time in minutes = 60 × stored energy ÷ pack-side power. Supplied energy = stored energy ÷ efficiency. A positive-width band at zero effective power stops the projection. Time already needed to reach the stop and energy already added stay visible. When the target equals the start, it is already available in zero minutes.
The time window begins now. Each session’s entered start delay counts toward it. Charge at the end of the window comes from elapsed time in each completed or partial band, capped at the target or first zero-power stop. Completion exactly at the deadline is within the window.
Use 0.01–1,000 kWh of usable capacity, 0–1,000 kW of supply and pack acceptance, 0.01–100% efficiency and up to 1,440 minutes of start delay. Enter 1–12 thresholds starting at 0%, 0–100% SoC and a 0–2,880 minute window. Fields accept up to two decimals. Enter power on the supply side of the same efficiency boundary for both options. Use measured or supplied inputs for conditions such as battery temperature and charger sharing.Worked Example
If you input:
- Usable capacity: 75 kWh
- Charge window: 20% to 90% with 60 minutes available
- Pack acceptance: 100 kW below 70%, 50 kW from 70%, and 20 kW from 80%
- Session A: 60 kW supply at 90% efficiency, no delay
- Session B: 120 kW supply at 90% efficiency, 5-minute delay
Result:
Session A takes 1 h 13 min 10 s and reaches 84.15% by 60 minutes. Session B reaches 90% in 59 min. Both store 52.5 kWh at the target and draw about 58.33 kWh from the supply.
Frequently Asked Questions
Why isn't charging time simply capacity divided by charger power?
The needed energy depends on the difference between starting and target state of charge. Available power can be constrained by the charger or by the battery’s acceptance at each charge level.
Should I enter the published maximum station power?
Use the supply power realistically available to this vehicle for the modeled session. It can differ from the station nameplate because of shared equipment, power limits or vehicle restrictions.
Which battery capacity should I use?
Enter usable capacity over the displayed 0–100% state-of-charge range. Use pack acceptance measurements expressed as kW stored at the battery boundary, and apply efficiency to power on the supply side.
What happens if the accepted rate is zero?
The modeled session stops at the first positive-width band where supply or battery acceptance is zero. You can still see the predicted charge by your deadline and the energy added before the stop.
Are the example power bands vehicle-specific?
The example is illustrative. Enter values from your own measurements or vehicle and charge-point references for the temperature and charging mode you want to compare.
Similar Calculators
EV Charging Cost Calculator
Estimate electric vehicle charging cost, trip cost, cost per mile, and gasoline-equivalent savings.
Battery Runtime Calculator & Duty Cycle Planner
Compare steady and repeating load profiles. Estimate battery runtime from amp-hours, inverter loads, reserve charge and an optional discharge-rate correction.
Solar Battery Sizing & Backup Planner
Compare solar battery sizes with hourly solar and load profiles, storage losses, power limits, signed tariffs and grid outages. Visualize energy flows and export the complete ledger.
Electricity Bill & Rate Comparison Calculator
Compare electricity bills with flat, time-of-use or tiered rates. Enter usage and fees, then find how much peak electricity you would need to shift to break even.
Fuel Cost Calculator
Calculate the fuel cost and consumption for any road trip or daily commute.
EV Range Calculator & Route Reserve Audit
Compare electric vehicle range across route legs. Track usable battery energy, reserve contact and regeneration from two entered net consumption scenarios.
Shared EV Charging Power & Departure Calculator
Check whether two plugged-in EVs can meet their energy targets before departure under one shared power limit and separate port limits.