EV Charging Time Calculator & Target Planner

Model the same battery and charging target with two available power levels. Enter the vehicle’s accepted power by state of charge and see how a taper changes travel timing. The worksheet reports completion time, energy pulled from the supply, and state of charge at the end of your reservation or departure window.

Vehicle charging

Compare EV charging sessions

See how available supply, battery acceptance and start delay affect the same charging target.

By the deadline, Session A reaches 84.15% and Session B reaches 90%.

Compare charge time and departure readiness

Session A

Time to target
1 h 13 min 10 s
Target reached after the window

Charge at deadline

84.15%

Supply by deadline

53.46 kWh

Session B

Time to target
59 min
Target reached within the window

Charge at deadline

90%

Supply by deadline

58.33 kWh

Edit battery, deadline and sessions
Session A
Session B
Edit battery acceptance bands (3)

Start at 0% and use ascending charge levels. Pack power stays at the entered cap until the next band.

Band 1
Band 2
Band 3

Charge across the time window

The dashed line marks your target. A flat trace shows a delay, completed target or stopped session.

Session A · 84.15%
Session B · 90%
0%50%100%0 min60 min
Open charging segment ledger

Session A stores 52.5 kWh and uses 58.333 kWh from the supply by completion or stop.

Session A charging segments
Charge intervalElapsed startElapsed endDelivered to packPower limitStoredFrom supply
20% to 70%0 s41 min 40 s54 kWSupply limited37.5 kWh41.667 kWh
70% to 80%41 min 40 s50 min 40 s50 kWBattery limited7.5 kWh8.333 kWh
80% to 90%50 min 40 s1 h 13 min 10 s20 kWBattery limited7.5 kWh8.333 kWh

Session B stores 52.5 kWh and uses 58.333 kWh from the supply by completion or stop.

Session B charging segments
Charge intervalElapsed startElapsed endDelivered to packPower limitStoredFrom supply
20% to 70%5 min27 min 30 s100 kWBattery limited37.5 kWh41.667 kWh
70% to 80%27 min 30 s36 min 30 s50 kWBattery limited7.5 kWh8.333 kWh
80% to 90%36 min 30 s59 min20 kWBattery limited7.5 kWh8.333 kWh
Show copyable CSV

How to use this calculator

  1. Enter usable battery capacity, starting and target percentages, and the time available before departure.
  2. Enter the effective supply-side kW, charging efficiency and any start delay for each session.
  3. Enter the accepted pack power by state-of-charge range. Use data for the conditions you are comparing, with inclusive starting percentages.
  4. Compare completion and the end-of-window charge. Open the segment ledger to reconcile active bottlenecks, energy and elapsed time.

The Formula

The mathematical logic powering this calculation is:

Each entered acceptance band begins at its lower state of charge and ends before the next band. Only the overlap from starting to target state of charge contributes to duration. Stored energy in a band = usable battery capacity × fraction of state-of-charge points traversed.

Pack-side power is the lower of entered pack acceptance and available supply power × wall-to-pack efficiency. Active time in minutes = 60 × stored energy ÷ pack-side power. Supplied energy = stored energy ÷ efficiency. A positive-width band at zero effective power stops the projection. Time already needed to reach the stop and energy already added stay visible. When the target equals the start, it is already available in zero minutes.

The time window begins now. Each session’s entered start delay counts toward it. Charge at the end of the window comes from elapsed time in each completed or partial band, capped at the target or first zero-power stop. Completion exactly at the deadline is within the window.

Use 0.01–1,000 kWh of usable capacity, 0–1,000 kW of supply and pack acceptance, 0.01–100% efficiency and up to 1,440 minutes of start delay. Enter 1–12 thresholds starting at 0%, 0–100% SoC and a 0–2,880 minute window. Fields accept up to two decimals. Enter power on the supply side of the same efficiency boundary for both options. Use measured or supplied inputs for conditions such as battery temperature and charger sharing.

Worked Example

If you input:

  • Usable capacity: 75 kWh
  • Charge window: 20% to 90% with 60 minutes available
  • Pack acceptance: 100 kW below 70%, 50 kW from 70%, and 20 kW from 80%
  • Session A: 60 kW supply at 90% efficiency, no delay
  • Session B: 120 kW supply at 90% efficiency, 5-minute delay

Result:

Session A takes 1 h 13 min 10 s and reaches 84.15% by 60 minutes. Session B reaches 90% in 59 min. Both store 52.5 kWh at the target and draw about 58.33 kWh from the supply.

Frequently Asked Questions

Why isn't charging time simply capacity divided by charger power?

The needed energy depends on the difference between starting and target state of charge. Available power can be constrained by the charger or by the battery’s acceptance at each charge level.

Should I enter the published maximum station power?

Use the supply power realistically available to this vehicle for the modeled session. It can differ from the station nameplate because of shared equipment, power limits or vehicle restrictions.

Which battery capacity should I use?

Enter usable capacity over the displayed 0–100% state-of-charge range. Use pack acceptance measurements expressed as kW stored at the battery boundary, and apply efficiency to power on the supply side.

What happens if the accepted rate is zero?

The modeled session stops at the first positive-width band where supply or battery acceptance is zero. You can still see the predicted charge by your deadline and the energy added before the stop.

Are the example power bands vehicle-specific?

The example is illustrative. Enter values from your own measurements or vehicle and charge-point references for the temperature and charging mode you want to compare.

Similar Calculators