Second-Story Addition Cost Calculator & Move-Out Timeline

A lower construction bid can become the higher budget if it requires a longer stay away. Enter two written scopes for the same conditioned area, group their overlapping move-out windows, and compare construction, lodging and other costs. Find an exact nightly break-even and review both schedules.

Addition budget

Compare second-story bids and nights away

Shared area and household rates
Bid A · Written scope

Move-out window 1

Move-out window 2

Bid B · Written scope

Move-out window 1

Move-out window 2

Bid B has the lower entered total.
Bid A · Entered total
$104,100.00
$96,000.00 construction · 45 distinct nights away
Bid B · Entered total
$103,500.00
$99,000.00 construction · 25 distinct nights away

Review move-out costs

Project day 0Day 59

Bid A · 45 distinct nights

First window
Second window
Billed nights

day 14 to day 59 · 10 overlapping nights counted once

Bid B · 25 distinct nights

First window
Second window
Billed nights

day 12 to day 37 · 10 overlapping nights counted once

Review budget ledger and exact CSV
Written and household costs
ChargeBid ABid B
Construction$96,000.00$99,000.00
One-time stays$0.00$0.00
Nightly costs$8,100.00$4,500.00
Entered total$104,100.00$103,500.00

How to use this calculator

  1. Enter the common added area and the nightly lodging plus incremental household costs. Include a one-time charge per separate stay if it applies.
  2. Enter each bid’s area rate and fixed scope lines, keeping separately priced existing-house work out of the area charge.
  3. Enter up to two confirmed move-out windows in each bid with the return day excluded. Use equal endpoints for an unused window.
  4. Inspect the distinct stays and overlapping nights. Switch to nightly cost sensitivity, then export the exact ledger.

The Formula

The mathematical logic powering this calculation is:

For each bid, construction = added conditioned area × written area rate + existing-house interface work + other fixed work. Area includes only the quantity priced at the area rate. Round that line half up to cents. Put individually quoted stairs, tie-ins, weather protection and other separate work in the appropriate entered lines once.
An absence interval includes its first night and stops before its return day, both measured from project day zero. Merge intersecting and touching intervals before counting nights and separate stays. Touching intervals leave no intervening night at home. Equal start and return days represent an empty interval. Quoted budget equals construction plus separate stays times the shared one-time rate plus distinct nights times the shared nightly rate.
If different night counts yield a break-even, solve (B construction-plus-stay charges − A construction-plus-stay charges) ÷ (A nights − B nights) in dollars per night. Display a unique crossover only in the supported $0–$10,000 nightly range. Above it the bid with fewer nights costs less in this model. Equal slopes give a constant gap or a tie for every nightly rate. Fractional cents are retained in the exact CSV. The first rate above the crossover is the next whole-cent rate within the supported interval.
Area accepts 0.01–10,000 ft². Each project day is an integer 0–730. Monetary amounts use up to two decimals. Area and household rates range up to $10,000, and each fixed construction line up to $1 million. Use documented off-site windows and prices. Permit, engineering, actual ability to occupy, financing and unentered work require separate review.

Worked Example

If you input:

  • Added conditioned area: 400 ft²
  • Entered nightly costs: $180
  • Bid A: $96,000 construction, 45 distinct nights
  • Bid B: $99,000 construction, 25 distinct nights

Result:

At $180 per night, Bid A totals $104,100 and Bid B totals $103,500. The entered budgets tie at exactly $150 per night.

Frequently Asked Questions

Why do overlapping windows count only once?

The entered lodging rate represents a single household cash cost per night. Two work periods can require the same household to be away on the same night, and the worksheet charges that night once.

What does the return day mean?

The return day is the day the household comes back. Lodging covers nights starting on the first day up to the night before that return.

Can I price two layouts with different upstairs area?

The comparison uses one entered conditioned area. For two differently sized additions enter their complete written costs in the fixed lines and use a zero area rate for both.

What if there is no crossover?

The night counts can be equal, or the mathematical equality may require a rate outside the supported range. The current entered estimate still compares both scopes.

Does the worksheet predict how long a family must move out?

The timeline displays your entered absence windows. Verify scheduling and occupancy restrictions against the written plans and the people responsible for the project.

Similar Calculators