Attic Conversion Area & Quote Planner

Compare two attic finishing quotes with the same survey dimensions and height threshold. Enter clear heights at shared strip edges to see where each quote includes floor at the chosen height. Match written scope for finishing, floor, stairs, services and documented fees before comparing prices.

Attic quote worksheet

Match attic finish quotes to measured space

Quote and area comparison

Quote B costs $3,500.00 less on matched scope.

Quote A

Complete entered price

$32,000.00

Gross stated floor
840 ft²
Profile at threshold
420 ft²
Covered at threshold
420 ft²
Price per covered ft² at threshold
$76.19

Quote B

Complete entered price

$28,500.00

Gross stated floor
840 ft²
Profile at threshold
420 ft²
Covered at threshold
420 ft²
Price per covered ft² at threshold
$67.86

Headroom profiles on the same scale

Both diagrams span the same width and show clearance from 0 to 7 ft. The dashed line is your 6 ft threshold.

Quote A section

0 ft from left28 ft

420 ft² covered at the entered threshold.

Quote B section

0 ft from left28 ft

420 ft² covered at the entered threshold.

  • Entered height
  • Covered at threshold
  • At threshold, outside quoted floor
  • Stated floor coverage

Common survey dimensions

Use one uniform rectangular section. Enter contiguous widths from left to right and the common perpendicular depth.

840 ft² surveyed floor area

Shared requested work

Select the items you want covered by both quotes. The main finish is always counted. The price of included work stays in the entered main amount.

Edit the two quotes

Edge clearances

Enter the clear vertical height at each shared edge, left to right, using the same reference floor and proposal finish basis.

Stated floor coverage

Written work and price

Use In finish price only when the written main finish price includes that requested item.

Wall and ceiling finish
Floor finish
Stairs and access
Electrical and other services
Plans and documented fees
Other written work
Survey and quote ledgers
Attic measured strips and covered area at threshold
StripPosition (ft)Quote A at thresholdQuote B at threshold
Strip 10–40 ft² covered of 0 ft²0 ft² covered of 0 ft²
Strip 24–1090 ft² covered of 90 ft²90 ft² covered of 90 ft²
Strip 310–18240 ft² covered of 240 ft²240 ft² covered of 240 ft²
Strip 418–2490 ft² covered of 90 ft²90 ft² covered of 90 ft²
Strip 524–280 ft² covered of 0 ft²0 ft² covered of 0 ft²
Attic written scope and price ledger
Written scopeQuote AQuote B
Wall and ceiling finish$14,000.00$12,400.00
Floor finish$3,000.00$2,900.00
Stairs and access$6,500.00$6,200.00
Electrical and other services$4,000.00$3,400.00
Plans and documented fees$1,500.00$1,100.00
Other written work$3,000.00$2,500.00

Export the attic comparison

Download attic comparison CSV
View CSV text

How to use this calculator

  1. Enter a shared depth, consecutive strip widths and a height for the comparison.
  2. For each quote, enter the corresponding clear edge heights and check each full strip the written proposal covers.
  3. Choose shared requested floor, stair and access, services and other work. Enter explicit prices or mark unresolved and excluded items.
  4. Review the drawn profiles, covered area and per-area costs. Use the ledgers to resolve differences between the quotes.
  5. Download exact strip positions, scope and prices together in the CSV.

The Formula

The mathematical logic powering this calculation is:

Use the horizontal floor rectangle of one common section. Its depth is perpendicular to the section profile. Enter one to eight consecutive strip widths from left to right between shared survey points. Enter an independent clear vertical height at each boundary for each proposal, using the same floor and finish basis. Each strip represents its full depth and its clearance changes linearly between the two entered edge heights. Obstructions and additional shapes across depth are outside this model.

At each strip, find the portion that meets or exceeds the entered clearance threshold. If both edge heights meet it, the full strip counts. If both are lower, no width counts. With a crossing, the crossing position equals the left edge plus strip width × (threshold − left height) ÷ (right height − left height). An isolated point of equality has zero measurable floor area. A flat interval at exactly the threshold counts its full width. The above-threshold area equals the retained horizontal width × the common depth. Multiply all checked strip widths by depth to find stated gross floor coverage. Sum only the above-threshold portions of checked strips for the price denominator. A different quote can state a smaller floor area even when the entered profile has more space above the chosen threshold.

Select the work requested in both quotes. Enter the written prices for each item, including applicable taxes in those entered amounts. Mark a requested item as included only when the main finish price already covers it. If that price is unresolved, any items bundled with it stay unresolved as well. An explicitly separate $0 is a known amount. Excluded or unpriced requested items keep the complete price unavailable. Known totals still show the entered standalone prices. Cost per covered ft² equals complete price ÷ positive covered area meeting the threshold. Round the displayed rate to the nearest cent, with exact half cents rounding upward. The export keeps the exact rational area and the complete price used to derive the rate.

Matched savings require both quotes to cover the same full strips, include the same above-threshold intervals on those strips and have complete prices and positive covered area. Equal area alone cannot establish matching positions or stated gross coverage. A known price gap without those checks compares only the currently entered amounts. It does not imply savings for identical work.

Use 0.01 to 500 ft depth, 0.01 to 100 ft per strip, 0 to 50 ft edge heights and 0.01 to 50 ft for the user-selected threshold. Enter up to two decimals and prices from $0 to $2,000,000 per line. This is a pricing and measured-area worksheet. The chosen height is not a code, structural, use, appraisal or occupancy determination, and this model does not prescribe work or establish any requirement.

Worked Example

If you input:

  • Common survey dimensions: 30 ft depth and 6 ft chosen clearance. Strip widths 4, 6, 8, 6 and 4 ft.
  • Quote A: Both profiles use clear edge heights of 3, 5, 7, 7, 5 and 3 ft and cover all strips. A includes $14,000 finish, $3,000 floor, $6,500 stairs and access, $4,000 services, $1,500 plans and fees and $3,000 other written work.
  • Quote B: Same measurements and stated scope. B quotes $12,400 finish, $2,900 floor, $6,200 access, $3,400 services, $1,100 plans and fees and $2,500 other work.

Result:

Each quote covers 420 ft² at the chosen threshold, out of 840 ft² gross. Quote A is $32,000, or $76.19 per covered ft². Quote B is $28,500, or $67.86 per covered ft², and costs $3,500 less for the matched entered scope.

Frequently Asked Questions

Is the chosen height an official requirement?

No. It is your comparison threshold for the entered section and quotes. The result is not a usable-area standard, appraisal figure, occupancy decision or permit finding.

How should I measure the strips?

Enter consecutive widths from a shared zero point and one perpendicular depth that applies to the entire section. Compare heights at the same boundaries, using consistent measured or proposed finish references for both quotes.

Does an edge exactly at the chosen height count?

A positive-length part at exactly the threshold counts. An isolated equality point contributes zero width and no floor area.

Why is the cost per square foot unavailable?

It needs complete pricing for the requested scope and positive covered area at the threshold. An excluded or unresolved line stays visible in the price comparison.

Can two proposals have the same area but different coverage?

Yes. A measured profile can shift the above-threshold range from one side to the other, or a quote can include a different set of strips. Both dimensions of coverage are compared before matching costs.

Does the tool price stairs or electrical work?

Enter the prices documented in each quote. The worksheet does not infer new work, external fees or a price for any unresolved item.

Similar Calculators