Pool Pump Runtime & Electricity Cost Planner
A low setting may move more water per kWh, while a high setting may be needed for cleaning or other features. Enter two measured modes, three electricity price bands and any high-flow time each band must keep. Compare a current schedule with a lowest-charge allocation under those same operating constraints.
Lower pump costs within your run windows
Use your measured flow, power and electricity prices to compare two schedules for the same daily requirements.
The optimized schedule costs $144.45 less over 180 operating days.
Run time allocated by price band
Off-peak
$0.1200 / kWh
480 min available · 60 min must run high
Shoulder
$0.2500 / kWh
360 min available · 0 min must run high
Peak
$0.4200 / kWh
180 min available · 30 min must run high
Edit measured speeds and price bands
Use separate price bands that sum to no more than one day. Enter minutes in 15-minute steps.
Open energy and charge ledger
| Plan and band | Daily flow | Daily energy | Daily charge |
|---|---|---|---|
| Current · Off-peak | 7,200 gal | 1.8 kWh | $0.216 |
| Current · Shoulder | 5,400 gal | 1.35 kWh | $0.3375 |
| Current · Peak | 7,200 gal | 1.8 kWh | $0.756 |
| Optimized · Off-peak | 16,200 gal | 2.65 kWh | $0.318 |
| Optimized · Shoulder | 0 gal | 0 kWh | $0.00 |
| Optimized · Peak | 1,800 gal | 0.45 kWh | $0.189 |
Open selectable CSV
How to use this calculator
- Enter the daily gallons target and the number of operating days that use this representative schedule.
- Enter measured low- and high-mode GPM and electrical watts from the actual setup.
- Enter each price band’s rate, available minutes and confirmed high-flow minutes. Reserve no minutes in a band that has no high-flow requirement.
- Copy your current low- and high-mode minutes, then compare the modeled schedule and its season charge.
- Inspect the price-band allocation, try a shorter usable window and export the schedule and exact charges.
The Formula
The mathematical logic powering this calculation is:
Use whole 15-minute slots in three separate price bands. Available slots need not cover the full day, and their sum cannot exceed 96. Enter each band’s representative variable energy price and all minutes that can be scheduled at either supported pump mode. Reserve any slots that must run at the high mode in that same band. Enter supported flow and real electrical power measured for each mode at the actual plumbing conditions. High mode must have at least the same entered GPM as low mode. A nameplate horsepower or RPM is not the measured input power.
Gallons per slot = measured US GPM × 15. Energy per slot = measured watts × 15/60 ÷ 1000 kWh. A band’s charge is its total kWh times its entered USD/kWh. Daily volumes and charges add across bands. Projected seasonal charge multiplies the exact daily charge by the number of equivalent operating days, then rounds half up to cents once. Rates are fixed per band across the modeled days. The CSV retains daily charges to their full canonical precision.
The current plan can move enough total water but still miss a specified high-mode window. The optimized plan first reserves each band's required high slots. It enumerates every count of additional high slots and computes the minimum remaining low slots needed to reach the target. All optional slots are interchangeable within their entered availability. For each pair of mode totals, placing the higher-watt mode into cheaper available slots first minimizes cost because exchanging a higher and lower watt slot cannot decrease cost if the higher watt slot is already cheaper. Choose the lowest energy charge, then lower kWh, then fewer minutes. The maximum achievable volume assumes all available slots run at the entered high GPM. The chart is an allocation by price band in 15-minute units, not timer programming by clock time.
Use flow from 0.01 to 1,000 US GPM, positive whole watts through 100,000, daily target up to 1,440,000 US gallons, rates through USD 10.0000/kWh, and 1–366 equivalent operating days. Use only modes and run windows already suitable for your equipment and required operation. Copy your confirmed daily filtration and feature requirements. The model does not establish required turnover or water safety, account for standby or priming power, derive a flow curve, apply utility demand charges, or infer programming constraints. Count additional fixed or non-energy charges separately.Worked Example
If you input:
- Daily throughput: 18,000 US gallons
- Measured modes: 30 GPM at 250 W and 60 GPM at 900 W
- High-flow reservations: 60 off-peak minutes and 30 peak minutes
- Energy rates: USD 0.12, 0.25 and 0.42 per kWh for off-peak, shoulder and peak
- Operating days: 180 days following this pattern
Result:
The current plan moves 19,800 gallons and costs $235.71 over 180 days. The optimized plan assigns 420 low and 60 high off-peak minutes, plus 30 high peak minutes. It moves exactly 18,000 gallons and costs $91.26, a difference of $144.45.
Frequently Asked Questions
Where do I find the GPM and watts for each mode?
Use reliable measured flow and input power from your installed pump at each setting. The same RPM can produce different flow in another plumbing system.
Why does the optimized plan sometimes keep peak hours?
High-flow minutes assigned to the peak band are required there. The optimizer moves only optional circulation and does not transfer those requirements to other bands.
What if my current plan is cheaper because it misses a target?
Its energy charge is still shown. Savings are ranked against a current plan only if both meet the entered daily gallons and per-band high-flow targets.
Why does the optimized plan move extra gallons?
The planner uses 15-minute slots. An exact daily volume is not always available. The lowest-charge feasible plan can move more than the target.
Can I compare a flat rate or changing weekday rates?
Enter the same price across active bands for a flat rate. Model different weekday and weekend patterns separately using the corresponding number of operating days.
Does this schedule tell me if the pool has safe water or enough filtration?
Enter circulation settings and targets confirmed for your setup. Gallons moved and electricity costs do not measure water treatment, water quality, or regulatory compliance.
Similar Calculators
Pool Filter Sizing & Flow Schedule Calculator
Size and compare pool filters using published GPM and filter area. Check two speed schedules against a daily turnover target and each filter’s flow rating.
Electricity Bill & Rate Comparison Calculator
Compare electricity bills with flat, time-of-use or tiered rates. Enter usage and fees, then find how much peak electricity you would need to shift to break even.
Pump Curve & Operating Point Planner
Compare pump curves and speeds against system head. Visualize operating flow, runtime, electrical energy and whether your target volume fits the available hours.
Pool Water Loss Calculator & Bucket Test Comparison
Compare pool and bucket water-level drops from one or two recorded periods. Normalize to inches and US gallons per day with an exact measurement uncertainty range.
Pool Maintenance Cost Calculator
Compare two written pool service quotes month by month. Price uncovered visits, seasonal opening and closing, and track when charges occur.
