Mulch Refresh & Installation Quote Planner

Measure each rectangular bed or tree ring, enter the existing depth, and compare two plans to keep, remove or top up that layer. Reconcile the finished depth, purchased reserve and whole bag or bulk order. Compare new mulch, installation, removal and delivery across the same footprint.

Measured landscape takeoff

Compare mulch refresh and removal plans

Example depths and prices are editable. Use measurements and quotes for your beds.

Plan A

$352.20

Fresh placed
34.4635 ft³
Old mulch removed
0 ft³
Supplier order
19 bags

Plan B

$466.23

Fresh placed
62.854 ft³
Old mulch removed
28.3905 ft³
Supplier order
3 yd³ bulk

Both plans reach the same finished depth in every bed.

Plan A is $114.03 lower for the entered work.

Complete quote for Plan A. Complete quote for Plan B. Both plans reach the same finished depth in every bed. Plan A is $114.03 lower for the entered work.

Measured bed and depth comparison

Tree ring footprint
Tree ring measured footprint
Covered area
47.1239 ft²
Excluded center
3.1416 ft²
Current mulch
2.5 in
Outside diameter
8 ft
Excluded diameter
2 ft
Plan A layer change
Plan A depth comparison for Tree ring, with removed, retained and fresh mulch
Existing splitFinished
Removed
0 in
Retained
2.5 in
Fresh added
0.5 in
Finished
3 in
Target
3 in
Above target
0 in
Plan B layer change
Plan B depth comparison for Tree ring, with removed, retained and fresh mulch
Existing splitFinished
Removed
1.5 in
Retained
1 in
Fresh added
2 in
Finished
3 in
Target
3 in
Above target
0 in
  • Retained
  • Hatched removal
  • Fresh mulch
  • Target depth

Placed mulch and supplier order

Both bars use the same volume scale. Reserve and order overage remain after placement.

Plan A purchase

19 bags · 38 ft³ purchased

Placed fresh
34.4635 ft³
Kept as reserve
3.4463 ft³
Order overage
0.0902 ft³
Left after placement
3.5365 ft³

Plan B purchase

3 yd³ bulk · 81 ft³ purchased

Placed fresh
62.854 ft³
Kept as reserve
6.2854 ft³
Order overage
11.8606 ft³
Left after placement
18.146 ft³
Edit beds and work scope

Measure nonoverlapping beds once. Each plan uses its own removal and final target. A ring’s exclusion is the full uncovered center.

287.1239 ft² total measured bed area

Bed 1
Plan A work
Plan B work
Bed 2
Plan A work
Plan B work
Bed 3
Plan A work
Plan B work
Edit Plan A supplier and costs
Order and delivery
Quoted services

Installation applies to beds receiving fresh mulch. Enter zero where the quote includes a line elsewhere.

Edit Plan B supplier and costs
Order and delivery
Quoted services

Installation applies to beds receiving fresh mulch. Enter zero where the quote includes a line elsewhere.

Show material and quote ledger

Existing mulch divides into removed and retained. The finished layer combines retained and fresh mulch.

Measured materials and entered quote costs
Quantity or costPlan APlan B
Existing32.3175 ft³32.3175 ft³
Removed0 ft³28.3905 ft³
Retained32.3175 ft³3.927 ft³
Fresh placed34.4635 ft³62.854 ft³
Finished volume66.781 ft³66.781 ft³
Above target0 ft³0 ft³
Installation area287.1239 ft²287.1239 ft²
Purchased mulch$85.50$126.00
Delivery$12.00$45.00
Fresh installation$229.70$186.63
Removal and haul$0.00$73.60
Other quoted costs$25.00$35.00
Complete quote$352.20$466.23

Plan A quantities per bed

Established border
3 in finished · 0 ft³ removed · 22.5 ft³ kept · 22.5 ft³ placed
New bed
2 in finished · 0 ft³ removed · 0 ft³ kept · 10 ft³ placed
Tree ring
3 in finished · 0 ft³ removed · 9.8175 ft³ kept · 1.9635 ft³ placed

Plan B quantities per bed

Established border
3 in finished · 22.5 ft³ removed · 0 ft³ kept · 45 ft³ placed
New bed
2 in finished · 0 ft³ removed · 0 ft³ kept · 10 ft³ placed
Tree ring
3 in finished · 5.8905 ft³ removed · 3.927 ft³ kept · 7.854 ft³ placed

Export results

Download mulch plan CSV
Show selectable CSV text

How to use this calculator

  1. Enter each measured rectangle or tree ring and its existing mulch depth. For a ring, include the full uncovered center in the inside diameter.
  2. For each plan, enter the old depth to remove and the finished depth you want. Use zero removal for a top-up.
  3. Choose bag or bulk supply. Enter the bag labels or bulk order rules, reserve and quote prices.
  4. Compare before-and-after layers, placed versus purchased mulch and the full cost of both plans. Review beds with different finished depths separately.
  5. Open the measured quantity ledger or export the full comparison as CSV.

The Formula

The mathematical logic powering this calculation is:

For a rectangular bed, multiply length by width for the footprint area. For a circular bed or tree ring, area is π(outer diameter² − excluded diameter²)/4. Enter the full diameter of the central area to leave bare. A zero exclusion describes a disk. Each bed is measured separately and has one uniform existing depth.

Retained depth equals existing minus the amount explicitly removed. Added depth is the greater of zero and target minus retained. Finished depth is retained plus added. When retained depth is greater than the target, the ledger shows that excess and the finished depth remains above target. For each layer, multiply the bed area by the layer depth in feet. This gives cubic feet. Divide by 27 for cubic yards. Old volume equals removed plus retained. Finished volume equals retained plus fresh material.

Add the purchase reserve to the summed fresh volume across beds. A bag order chooses the smallest whole count covering that combined amount at the entered bag volume. A bulk order chooses the smallest multiple of the supplier increment reaching both the material request and the supplier minimum. Zero fresh volume produces zero orders and zero delivery cost. The ordered volume separates into placed, reserved and order overage. Keep the reserve and overage as unplaced material in the ledger.

Installation applies to the full area of beds receiving fresh mulch. Removal and haul applies to the measured cubic yards removed. Multiply each by the entered unit rate, then add product, conditional delivery and the fixed other amount. Each quoted line rounds to cents, with half-cents rounded upward. Full precision and bounded values of π determine stock and cent boundaries. When the two plans have different finished depths, review that scope alongside their price difference.

Use one to twelve nonoverlapping beds. Length and outside diameter are 0.001–2,000 ft. Existing, removed and target depths are 0–24 in. Enter values to three decimals for measurements, supplier dimensions and reserve, or two for prices. Bag volumes are 0.1–25 ft³, bulk increment 0.001–1,000 yd³, bulk minimum 0–1,000 yd³, and reserve 0–100%. The quantities use entered dimensions and geometric volume. Prices, chosen depths, product instructions and plant care stay project-specific.

Worked Example

If you input:

  • Established border: 18 × 10 ft, currently 1.5 in deep. A keeps it, B removes it. Both target 3 in.
  • New bed: 10 × 6 ft, currently bare. Both target 2 in.
  • Tree ring: 8 ft outside and 2 ft excluded diameter, currently 2.5 in deep. A keeps it, B removes 1.5 in. Both target 3 in.
  • Plan A supply and services: 10% reserve, 2 ft³ bags at $4.50, $12 delivery, $0.80 per installation square foot and $25 other.
  • Plan B supply and services: 10% reserve, $42 per yd³ in 0.5 yd³ increments with a 1 yd³ minimum. $45 delivery, $0.65 per installation square foot, $70 per yd³ hauled and $35 other.

Result:

Plan A adds 34.4635 ft³ and buys 19 bags for a $352.20 complete quote. Plan B removes 28.3905 ft³, adds 62.854 ft³ and buys 3 yd³ for $466.23. Both finish the beds at 3 in, 2 in and 3 in. Plan A is $114.03 less for those entered scopes.

Frequently Asked Questions

How much mulch should I buy when a bed already has some?

Measure the current layer and enter any planned removal. The retained depth reduces the new volume needed. If the retained layer is already as deep as the target, that bed receives zero fresh mulch.

Do I use the trunk diameter for a tree ring?

Use the full diameter of the center you want to leave uncovered, including any clear space around the trunk. Enter the outside diameter of the entire ring as the other measurement.

Why are ordered and installed mulch different?

The reserve increases the combined order request and minimums or whole packages can raise the purchase further. Both amounts stay out of the placed layer and appear as leftover material.

How does the bulk minimum affect a small order?

For positive new demand, reach both the minimum and the request at a permitted order increment. For example, a 1.1 yd³ minimum and a 0.25 yd³ increment require at least 1.25 yd³. Zero new demand skips both product and delivery.

Can I compare haul-away without new mulch?

Yes. If the retained layer reaches the entered target, removal and haul can still be charged. Installation and delivery stay at zero when there is no new mulch.

Why can two complete quotes cover different work?

Each plan can keep a different existing layer or target a different new depth. The worksheet highlights any finished-depth difference before comparing total prices.

Does this select a mulch type or depth?

Use the depth and clearance appropriate for your site, plantings and product. The calculator compares the dimensions and quote terms you enter.

Similar Calculators