Sprinkler & Drip Irrigation Zone Planner
Plan a mixed sprinkler and drip system around measured flow and an explicit watering window. Combine up to eight emitter groups per zone, set target net depth and application efficiency, and compare up to twelve zones. See whether flow fits your reserve-adjusted supply, how many balanced watering pulses each zone requires, and how the zones share a single controller timeline. Inspect cumulative delivery at any second, compare target depth with water delivered before the window closes, and export the complete assumptions and schedule. This planner adds scheduling and delivery analysis to flow arithmetic; it does not select sprinkler products, infer plant water needs or certify pressure and coverage.
Make every zone fit the plan
Size mixed sprinkler and drip zones, balance watering pulses with soak time, and see what your controller can deliver before the window closes.
Illustrative assumptions. Replace them with measured flow and site-specific water needs.
1. Supply and watering window
One zone runs at a time. Reserve reduces usable flow. Enter source and area/depth inputs in the stated metric units; emitter flows may use US gallons. Result units can be switched independently.
2. Zones and emitter groups
The next ready zone runs first. Equal-ready ties use the zone order below. Soak time is a minimum between pulses of the same zone; other zones can run during it. This is a transparent scheduling policy, not an optimized controller program.
Net depth is the water intended to reach the watered area. Efficiency increases gross demand. Pulse/soak settings are your inputs; they do not establish safe infiltration or plant requirements.
Net depth is the water intended to reach the watered area. Efficiency increases gross demand. Pulse/soak settings are your inputs; they do not establish safe infiltration or plant requirements.
Changing emitter units preserves quantity exactly. If the conversion needs more than four decimals, the original value stays. For a separate measurement, clear the flow, choose the new unit, then enter the measured value.
Plan updated. Finish 4h 7m 50s. Fits the watering window.
3. Capacity and water demand
1. Front lawn
- Zone flow
- 40.00 L/min
- Capacity margin
- 8.00 L/min
- Gross application rate
- 12.00 mm/hour
- Controller on-time
- 1h 2m 30s
- Balanced pulses
- 7
- Full-plan gross water
- 2,500.00 L
- Rounded net depth
- 10.00 mm
Emitter capacity with other groups fixed
- 1. Half-circle heads: 20.00 L/min; maximum count 5.
- 2. Full-circle heads: 20.00 L/min; maximum count 2.
Flow-only ceilings; pressure, coverage, pipe losses and product compatibility are not modeled. A zero-depth zone needs no runtime even if its nominal flow exceeds capacity.
2. Drip beds
- Zone flow
- 4.00 L/min
- Capacity margin
- 44.00 L/min
- Gross application rate
- 4.00 mm/hour
- Controller on-time
- 2h 13m 20s
- Balanced pulses
- 5
- Full-plan gross water
- 533.33 L
- Rounded net depth
- 8.00 mm
Emitter capacity with other groups fixed
- 1. Drip emitters: 4.00 L/min; maximum count 1,440.
Flow-only ceilings; pressure, coverage, pipe losses and product compatibility are not modeled. A zero-depth zone needs no runtime even if its nominal flow exceeds capacity.
3. Side strip
- Zone flow
- 30.00 L/min
- Capacity margin
- 18.00 L/min
- Gross application rate
- 15.00 mm/hour
- Controller on-time
- 32m
- Balanced pulses
- 4
- Full-plan gross water
- 960.00 L
- Rounded net depth
- 6.00 mm
Emitter capacity with other groups fixed
- 1. Spray heads: 30.00 L/min; maximum count 9.
Flow-only ceilings; pressure, coverage, pipe losses and product compatibility are not modeled. A zero-depth zone needs no runtime even if its nominal flow exceeds capacity.
4. Water, soak, repeat
Solid bars are watering pulses; striped bands are the required minimum soak. Blank gaps may include waiting for another zone. The separate idle row shows when no zone runs. All positions use elapsed time from controller start.
1. Front lawn
2. Drip beds
3. Side strip
Controller idle
Dashed marker: window closes at 5h. Active 3h 47m 50s; idle before completion 20m. There is no added soak after a zone’s final pulse.
What arrives before the window closes?
| Zone | On-time | Gross water | Net depth | Net shortfall | Pulses complete |
|---|---|---|---|---|---|
| Front lawn | 1h 2m 30s | 2,500.00 L | 10.00 mm | 0.00 mm | 7/7 |
| Drip beds | 2h 13m 20s | 533.33 L | 8.00 mm | 0.00 mm | 5/5 |
| Side strip | 32m | 960.00 L | 6.00 mm | 0.00 mm | 4/4 |
Cumulative delivery by zone
Delivery chart data
| Elapsed | Gross water (L) |
|---|---|
| 0s | 0.0000 |
| 8m 56s | 357.3333 |
| 43m 36s | 357.3333 |
| 52m 32s | 714.6667 |
| 1h 27m 12s | 714.6667 |
| 1h 36m 8s | 1,072.0000 |
| 2h 10m 48s | 1,072.0000 |
| 2h 19m 44s | 1,429.3333 |
| 2h 54m 24s | 1,429.3333 |
| 3h 3m 20s | 1,786.6667 |
| 3h 30m | 1,786.6667 |
| 3h 38m 55s | 2,143.3333 |
| 3h 58m 55s | 2,143.3333 |
| 4h 7m 50s | 2,500.0000 |
| 5h | 2,500.0000 |
Inspect any second
At 0s: watering Front lawn.
- Front lawn
0.00 L gross; 0.00 mm net depth; 10.00 mm net shortfall.
- Drip beds
0.00 L gross; 0.00 mm net depth; 8.00 mm net shortfall.
- Side strip
0.00 L gross; 0.00 mm net depth; 6.00 mm net shortfall.
Controller pulse schedule
Balanced whole-second pulses. “Ready” includes the minimum soak after the previous pulse; “wait” is extra time while other zones run. Use elapsed offsets from your chosen start time.
| # / zone / pulse | Ready | Start → end | On-time | Extra wait | Gross water | Water inside window |
|---|---|---|---|---|---|---|
| 1. Front lawn · 1 | 0s | 0s → 8m 56s | 8m 56s | 0s | 357.33 L | 357.33 L |
| 2. Drip beds · 1 | 0s | 8m 56s → 35m 36s | 26m 40s | 8m 56s | 106.67 L | 106.67 L |
| 3. Side strip · 1 | 0s | 35m 36s → 43m 36s | 8m | 35m 36s | 240.00 L | 240.00 L |
| 4. Front lawn · 2 | 28m 56s | 43m 36s → 52m 32s | 8m 56s | 14m 40s | 357.33 L | 357.33 L |
| 5. Drip beds · 2 | 45m 36s | 52m 32s → 1h 19m 12s | 26m 40s | 6m 56s | 106.67 L | 106.67 L |
| 6. Side strip · 2 | 58m 36s | 1h 19m 12s → 1h 27m 12s | 8m | 20m 36s | 240.00 L | 240.00 L |
| 7. Front lawn · 3 | 1h 12m 32s | 1h 27m 12s → 1h 36m 8s | 8m 56s | 14m 40s | 357.33 L | 357.33 L |
| 8. Drip beds · 3 | 1h 29m 12s | 1h 36m 8s → 2h 2m 48s | 26m 40s | 6m 56s | 106.67 L | 106.67 L |
| 9. Side strip · 3 | 1h 42m 12s | 2h 2m 48s → 2h 10m 48s | 8m | 20m 36s | 240.00 L | 240.00 L |
| 10. Front lawn · 4 | 1h 56m 8s | 2h 10m 48s → 2h 19m 44s | 8m 56s | 14m 40s | 357.33 L | 357.33 L |
| 11. Drip beds · 4 | 2h 12m 48s | 2h 19m 44s → 2h 46m 24s | 26m 40s | 6m 56s | 106.67 L | 106.67 L |
| 12. Side strip · 4 | 2h 25m 48s | 2h 46m 24s → 2h 54m 24s | 8m | 20m 36s | 240.00 L | 240.00 L |
| 13. Front lawn · 5 | 2h 39m 44s | 2h 54m 24s → 3h 3m 20s | 8m 56s | 14m 40s | 357.33 L | 357.33 L |
| 14. Drip beds · 5 | 2h 56m 24s | 3h 3m 20s → 3h 30m | 26m 40s | 6m 56s | 106.67 L | 106.67 L |
| 15. Front lawn · 6 | 3h 23m 20s | 3h 30m → 3h 38m 55s | 8m 55s | 6m 40s | 356.67 L | 356.67 L |
| 16. Front lawn · 7 | 3h 58m 55s | 3h 58m 55s → 4h 7m 50s | 8m 55s | 0s | 356.67 L | 356.67 L |
Controller idle intervals
- 3h 38m 55s → 3h 58m 55s (20m)
Keep the plan and assumptions
CSV includes every input, canonical exact result, pulse, window delivery and chart point in the selected display units. Fractions preserve exact arithmetic; screen values are rounded. A blocked plan exports demand and reasons, with no fabricated schedule.
Exact result details
{
"ok": true,
"currency": "USD",
"capacityLpm": "48",
"windowSeconds": 18000,
"zones": [
{
"id": "lawn",
"label": "Front lawn",
"groups": [
{
"label": "Half-circle heads",
"flowEachLpm": "5",
"flowLpm": "20",
"maxCountWithOthersFixed": "5"
},
{
"label": "Full-circle heads",
"flowEachLpm": "10",
"flowLpm": "20",
"maxCountWithOthersFixed": "2"
}
],
"flowLpm": "40",
"capacityMarginLpm": "8",
"withinCapacity": true,
"precipitationMmHour": "12",
"netVolumeL": "2000",
"requiredGrossVolumeL": "2500",
"theoreticalRuntimeSeconds": "3750",
"controllerRuntimeSeconds": "3750",
"pulseCount": "7",
"plannedGrossVolumeL": "2500",
"plannedNetDepthMm": "10",
"roundingExtraGrossVolumeL": "0",
"plannedCost": "25/4",
"window": {
"onSeconds": 3750,
"grossVolumeL": "2500",
"netDepthMm": "10",
"shortfallNetDepthMm": "0",
"netSurplusMm": "0",
"cost": "25/4",
"completedPulses": 7,
"completed": true,
"firstStartSeconds": 0,
"finishSeconds": 14870
}
},
{
"id": "beds",
"label": "Drip beds",
"groups": [
{
"label": "Drip emitters",
"flowEachLpm": "1/30",
"flowLpm": "4",
"maxCountWithOthersFixed": "1440"
}
],
"flowLpm": "4",
"capacityMarginLpm": "44",
"withinCapacity": true,
"precipitationMmHour": "4",
"netVolumeL": "480",
"requiredGrossVolumeL": "1600/3",
"theoreticalRuntimeSeconds": "8000",
"controllerRuntimeSeconds": "8000",
"pulseCount": "5",
"plannedGrossVolumeL": "1600/3",
"plannedNetDepthMm": "8",
"roundingExtraGrossVolumeL": "0",
"plannedCost": "4/3",
"window": {
"onSeconds": 8000,
"grossVolumeL": "1600/3",
"netDepthMm": "8",
"shortfallNetDepthMm": "0",
"netSurplusMm": "0",
"cost": "4/3",
"completedPulses": 5,
"completed": true,
"firstStartSeconds": 536,
"finishSeconds": 12600
}
},
{
"id": "side",
"label": "Side strip",
"groups": [
{
"label": "Spray heads",
"flowEachLpm": "5",
"flowLpm": "30",
"maxCountWithOthersFixed": "9"
}
],
"flowLpm": "30",
"capacityMarginLpm": "18",
"withinCapacity": true,
"precipitationMmHour": "15",
"netVolumeL": "720",
"requiredGrossVolumeL": "960",
"theoreticalRuntimeSeconds": "1920",
"controllerRuntimeSeconds": "1920",
"pulseCount": "4",
"plannedGrossVolumeL": "960",
"plannedNetDepthMm": "6",
"roundingExtraGrossVolumeL": "0",
"plannedCost": "12/5",
"window": {
"onSeconds": 1920,
"grossVolumeL": "960",
"netDepthMm": "6",
"shortfallNetDepthMm": "0",
"netSurplusMm": "0",
"cost": "12/5",
"completedPulses": 4,
"completed": true,
"firstStartSeconds": 2136,
"finishSeconds": 10464
}
}
],
"issues": [],
"totals": {
"netVolumeL": "3200",
"requiredGrossVolumeL": "11980/3",
"plannedGrossVolumeL": "11980/3",
"roundingExtraGrossVolumeL": "0",
"plannedCost": "599/60",
"totalOnSeconds": "13670"
},
"schedule": {
"elapsedSeconds": 14870,
"activeSeconds": 13670,
"idleSeconds": 1200,
"windowSeconds": 18000,
"overrunSeconds": 0,
"spareSeconds": 3130,
"fitsWindow": true,
"windowGrossVolumeL": "11980/3",
"windowCost": "599/60",
"windowNetShortfallL": "0",
"pulses": [
{
"sequence": 1,
"zoneId": "lawn",
"zoneIndex": 0,
"pulseNumber": 1,
"readyAtSeconds": 0,
"startSeconds": 0,
"endSeconds": 536,
"durationSeconds": 536,
"waitSeconds": 0,
"grossVolumeL": "1072/3",
"withinWindowSeconds": 536,
"withinWindowGrossVolumeL": "1072/3"
},
{
"sequence": 2,
"zoneId": "beds",
"zoneIndex": 1,
"pulseNumber": 1,
"readyAtSeconds": 0,
"startSeconds": 536,
"endSeconds": 2136,
"durationSeconds": 1600,
"waitSeconds": 536,
"grossVolumeL": "320/3",
"withinWindowSeconds": 1600,
"withinWindowGrossVolumeL": "320/3"
},
{
"sequence": 3,
"zoneId": "side",
"zoneIndex": 2,
"pulseNumber": 1,
"readyAtSeconds": 0,
"startSeconds": 2136,
"endSeconds": 2616,
"durationSeconds": 480,
"waitSeconds": 2136,
"grossVolumeL": "240",
"withinWindowSeconds": 480,
"withinWindowGrossVolumeL": "240"
},
{
"sequence": 4,
"zoneId": "lawn",
"zoneIndex": 0,
"pulseNumber": 2,
"readyAtSeconds": 1736,
"startSeconds": 2616,
"endSeconds": 3152,
"durationSeconds": 536,
"waitSeconds": 880,
"grossVolumeL": "1072/3",
"withinWindowSeconds": 536,
"withinWindowGrossVolumeL": "1072/3"
},
{
"sequence": 5,
"zoneId": "beds",
"zoneIndex": 1,
"pulseNumber": 2,
"readyAtSeconds": 2736,
"startSeconds": 3152,
"endSeconds": 4752,
"durationSeconds": 1600,
"waitSeconds": 416,
"grossVolumeL": "320/3",
"withinWindowSeconds": 1600,
"withinWindowGrossVolumeL": "320/3"
},
{
"sequence": 6,
"zoneId": "side",
"zoneIndex": 2,
"pulseNumber": 2,
"readyAtSeconds": 3516,
"startSeconds": 4752,
"endSeconds": 5232,
"durationSeconds": 480,
"waitSeconds": 1236,
"grossVolumeL": "240",
"withinWindowSeconds": 480,
"withinWindowGrossVolumeL": "240"
},
{
"sequence": 7,
"zoneId": "lawn",
"zoneIndex": 0,
"pulseNumber": 3,
"readyAtSeconds": 4352,
"startSeconds": 5232,
"endSeconds": 5768,
"durationSeconds": 536,
"waitSeconds": 880,
"grossVolumeL": "1072/3",
"withinWindowSeconds": 536,
"withinWindowGrossVolumeL": "1072/3"
},
{
"sequence": 8,
"zoneId": "beds",
"zoneIndex": 1,
"pulseNumber": 3,
"readyAtSeconds": 5352,
"startSeconds": 5768,
"endSeconds": 7368,
"durationSeconds": 1600,
"waitSeconds": 416,
"grossVolumeL": "320/3",
"withinWindowSeconds": 1600,
"withinWindowGrossVolumeL": "320/3"
},
{
"sequence": 9,
"zoneId": "side",
"zoneIndex": 2,
"pulseNumber": 3,
"readyAtSeconds": 6132,
"startSeconds": 7368,
"endSeconds": 7848,
"durationSeconds": 480,
"waitSeconds": 1236,
"grossVolumeL": "240",
"withinWindowSeconds": 480,
"withinWindowGrossVolumeL": "240"
},
{
"sequence": 10,
"zoneId": "lawn",
"zoneIndex": 0,
"pulseNumber": 4,
"readyAtSeconds": 6968,
"startSeconds": 7848,
"endSeconds": 8384,
"durationSeconds": 536,
"waitSeconds": 880,
"grossVolumeL": "1072/3",
"withinWindowSeconds": 536,
"withinWindowGrossVolumeL": "1072/3"
},
{
"sequence": 11,
"zoneId": "beds",
"zoneIndex": 1,
"pulseNumber": 4,
"readyAtSeconds": 7968,
"startSeconds": 8384,
"endSeconds": 9984,
"durationSeconds": 1600,
"waitSeconds": 416,
"grossVolumeL": "320/3",
"withinWindowSeconds": 1600,
"withinWindowGrossVolumeL": "320/3"
},
{
"sequence": 12,
"zoneId": "side",
"zoneIndex": 2,
"pulseNumber": 4,
"readyAtSeconds": 8748,
"startSeconds": 9984,
"endSeconds": 10464,
"durationSeconds": 480,
"waitSeconds": 1236,
"grossVolumeL": "240",
"withinWindowSeconds": 480,
"withinWindowGrossVolumeL": "240"
},
{
"sequence": 13,
"zoneId": "lawn",
"zoneIndex": 0,
"pulseNumber": 5,
"readyAtSeconds": 9584,
"startSeconds": 10464,
"endSeconds": 11000,
"durationSeconds": 536,
"waitSeconds": 880,
"grossVolumeL": "1072/3",
"withinWindowSeconds": 536,
"withinWindowGrossVolumeL": "1072/3"
},
{
"sequence": 14,
"zoneId": "beds",
"zoneIndex": 1,
"pulseNumber": 5,
"readyAtSeconds": 10584,
"startSeconds": 11000,
"endSeconds": 12600,
"durationSeconds": 1600,
"waitSeconds": 416,
"grossVolumeL": "320/3",
"withinWindowSeconds": 1600,
"withinWindowGrossVolumeL": "320/3"
},
{
"sequence": 15,
"zoneId": "lawn",
"zoneIndex": 0,
"pulseNumber": 6,
"readyAtSeconds": 12200,
"startSeconds": 12600,
"endSeconds": 13135,
"durationSeconds": 535,
"waitSeconds": 400,
"grossVolumeL": "1070/3",
"withinWindowSeconds": 535,
"withinWindowGrossVolumeL": "1070/3"
},
{
"sequence": 16,
"zoneId": "lawn",
"zoneIndex": 0,
"pulseNumber": 7,
"readyAtSeconds": 14335,
"startSeconds": 14335,
"endSeconds": 14870,
"durationSeconds": 535,
"waitSeconds": 0,
"grossVolumeL": "1070/3",
"withinWindowSeconds": 535,
"withinWindowGrossVolumeL": "1070/3"
}
],
"idleIntervals": [
{
"startSeconds": 13135,
"endSeconds": 14335,
"durationSeconds": 1200
}
]
}
}Use measured operating flow and site-specific depth, efficiency and infiltration limits. This planner does not calculate pressure, distribution uniformity, pipe loss, crop needs, rain forecasts or local watering restrictions. Verify that your controller can implement the proposed sequence.
How to use this calculator
- Load the five-hour mixed-zone example or the three-hour short window. Enter measured source flow in L/min, a flow reserve, the available whole-minute watering window and water price per m³.
- For each zone, enter watered area, target net depth and application efficiency. Choose maximum pulse and minimum soak durations from site-specific guidance and observations, not from the example defaults.
- Add each emitter group with its count and per-emitter operating flow. Select L/min, L/hour, US gal/min or US gal/hour. Unit changes preserve quantity exactly; clear a flow first if you need to enter a separate measurement in another unit.
- Review zone flow against usable capacity. Add, copy or reorder zones to compare assumptions. Equal-ready ties follow zone order; the controller runs only one zone at a time. Resolve blocking capacity or schedule limits before interpreting a timeline.
- Switch between full plan and available-window views. Inspect window shortfalls, select a zone's cumulative delivery chart, or enter any elapsed whole second. Read the pulse table for exact start, ready, end and waiting times.
- Download CSV or prepare the selectable fallback. It includes current inputs, canonical exact results, display values and chart data. Verify pressure, coverage and your controller's ability to execute the sequence separately.
The Formula
The mathematical logic powering this calculation is:
Usable source capacity = measured source flow × (1 − reserve/100). Zone flow Q is the sum of emitter count × individual flow, converted to L/min. One US gallon is exactly 3.785411784 L; one hour is 60 minutes. Each zone is compared independently against capacity because this schedule runs one zone at a time. For a selected emitter group with individual flow q and other-group flow O, maximum count = floor((capacity−O)/q); it is unavailable if the other groups alone exceed capacity. This is only a flow ceiling, not a pressure or coverage assessment.
For area A in m², net target depth d in mm and fractional efficiency e, net demand = A×d litres and required gross demand V = A×d/e litres. Gross application rate = 60Q/A mm/hour. These dimensional relationships follow the FAO irrigation-design guidance. Efficiency, target depth and measured operating flow are supplied by the user rather than inferred from climate, crop, pressure or equipment.
Theoretical on-time = 60V/Q seconds. Controller on-time R = ceil(60V/Q), rounded once to a whole second. Actual planned gross volume = QR/60, net depth = planned gross volume × e/A, and water cost = planned gross litres/1000 × entered price per m³. This small rounding surplus remains visible in exact details and CSV.
For maximum pulse duration M in seconds, pulse count n = ceil(R/M). Split R into n balanced whole-second pulses: the first R mod n pulses have floor(R/n)+1 seconds, the rest floor(R/n). Zero demand has zero pulses. Between pulses of the same zone, ready time is its prior end plus entered minimum soak. Choose the earliest ready zone; ties use input order. Start at max(controller available time, zone ready time). No two pulses overlap. No final soak is appended. This is a deterministic scheduling policy, not a claim of shortest possible completion time. EPA cycle-and-soak guidance motivates separated applications; the combined-zone scheduling policy is specific to this planner.
For available window W and pulse [start,end), on-time inside the window is max(0,min(end,W)−start). Multiply by zone flow to obtain water delivered by window close, including a partially completed pulse. Net depth shortfall is max(0,target−delivered net depth) for each zone. Aggregate net water shortfall sums each zone's shortfall volume; surplus in one zone does not cancel a deficit in another.
Any positive-demand zone exceeding usable capacity, seven days of on-time or 120 pulses blocks the full schedule. Demand and capacity results remain available with explicit reasons. Limits apply to each zone's on-time and pulse count; the full elapsed multi-zone schedule can exceed seven days because of soak gaps. A zero-depth zone does not block a schedule even if its nominal flow exceeds capacity. An overlong window result is shown as an overrun, not shortened into success.
Supported input: 1–12 zones with 1–8 emitter groups each; source flow and individual emitter flow 0.0001–1000000 in their stated units; area 0.0001–1000000 m²; target depth 0–1000 mm; efficiency 1–100%; reserve 0–100%; water price 0–1000 per m³; window 0–10080 whole minutes; maximum pulse 1–1440 whole minutes and soak 0–1440 whole minutes; emitter counts 1–1000000 whole units. Numeric inputs use unsigned decimal text, at most four decimal places for noninteger fields, at most 12 significant digits and 40 characters. Blank, signed, exponent and fraction input tokens are rejected. Numeric bounds are computational limits, not equipment or landscape recommendations.
The model uses exact rational arithmetic. Display values round half away from zero and retain tiny nonzero values using scientific notation. CSV preserves reduced rational strings: import them as text to prevent spreadsheet date conversion. Metric/US result display does not change assumptions. Emitter-input unit changes occur only when exact within supported precision; otherwise the original value is retained with an explanation. Currency changes labels only.
Excludes pressure losses, distribution uniformity, infiltration modeling, wind, evaporation forecasts, rainfall, crop evapotranspiration, backflow design, valves, controller compatibility, energy charges and local watering restrictions. Use local measurements and guidance to select depth, efficiency, pulse and soak inputs.Worked Example
If you input:
- Supply: 60 L/min source; 20% reserve; 300-minute window; USD 2.50/m³.
- FrontLawn: 200 m²; 10 mm net; 80% efficiency; 10-minute pulse maximum; 20-minute soak. Four 5 L/min heads and two 10 L/min heads.
- DripBeds: 60 m²; 8 mm net; 90% efficiency; 30-minute pulse maximum; 10-minute soak. 120 emitters at 2 L/hour each.
- SideStrip: 120 m²; 6 mm net; 75% efficiency; 8-minute pulse maximum; 15-minute soak. Six heads at 5 L/min each.
Result:
Usable capacity is 48 L/min. Zone flows are 40, 4 and 30 L/min. On-times are 1h 2m 30s, 2h 13m 20s and 32m, split into 7, 5 and 4 pulses. The full schedule finishes at 4h 7m 50s, with 20m of controller idle time and 52m 10s spare in the five-hour window. Planned gross water is 3,993.33 L and water cost is USD 9.98. With only the window changed to three hours, the full schedule is unchanged: 3,040 L arrives within the window at USD 7.60, leaving 773.33 L of net water still needed across the zones. These are illustrative inputs, not recommended irrigation settings.
Frequently Asked Questions
How many sprinklers can I put on one zone?
The flow-only ceiling subtracts other emitter groups from reserve-adjusted source capacity, then divides the remaining flow by one emitter's operating flow and rounds down. This does not establish pressure at the last head, coverage overlap, pipe size or equipment suitability. Use measured flow at the intended operating conditions.
Can I mix drip emitters and sprinklers?
The arithmetic supports mixed emitter groups and units, but it does not recommend placing them on the same physical zone. Different application rates and plant needs can require separate zones. Use independent zones to represent separately controlled areas.
Why is gross water greater than the target net water?
The entered application efficiency accounts for the fraction of gross applied water reaching the intended area as net water. At 80% efficiency, 100 L net needs 125 L gross. The planner does not estimate your efficiency; measure it or use appropriate local guidance.
Does cycle-and-soak guarantee that water will not run off?
No. You choose pulse and soak limits. Soil, slope, compaction, application rate and weather affect infiltration. The planner visualizes your timing assumptions and their consequences, but does not simulate infiltration or establish runoff-safe settings.
Why can the schedule take longer than total on-time?
The controller may have to wait while every unfinished zone is soaking. Other zones can use some soak gaps, but not all. The timeline separates zone soak requirements from global controller idle time. No final soak is included after a zone finishes.
What happens if the watering window ends halfway through a pulse?
Window delivery includes only the elapsed portion of that pulse. The full plan is still shown separately; the planner does not claim it fits or silently drop the remaining water demand. Shortfalls are calculated independently for every zone.
Is the sequence optimized, or ready to upload to my controller?
It follows earliest-ready scheduling with ties in zone order. It does not search for an optimal sequence or generate a manufacturer-specific program. Whole-second offsets may exceed the settings your controller supports. Check device capabilities and local restrictions before applying a plan.
Why can a unit change be refused?
The input fields support four decimal places. Some exact gallon/litre conversions need more. Rather than silently change the physical flow, the planner retains the original value and explains the limit. Display-unit switching remains available, and exact export fractions preserve the computed quantities.
Similar Calculators
Pump Curve & Operating Point Planner
Compare pump curves and speeds against system head. Visualize operating flow, runtime, electrical energy and whether your target volume fits the available hours.
Pipe Pressure Drop Calculator
Compare pipe pressure loss across inside diameters. Calculate Darcy friction, fitting losses, velocity and Reynolds number with explicit transition limits.
Plant Spacing & Layout Calculator
Plot rectangular, staggered or triangular plant spacing around paths. Compare exact planting counts, whole-tray orders and costs, with a scaled map and coordinate CSV.
Polygon Area Calculator
Calculate polygon area from ordered coordinates, subtract cutouts, and inspect perimeter, centroid and point location on a consistently scaled plan.
Sod Calculator & Pallet Planner
Measure lawn outlines and garden-bed cutouts, compare sod pallets and loose rolls, and explore cutting allowances with a scaled plan, supplier costs and CSV export.
