Impact Window Opening & Written Quote Audit

Put two written impact window proposals beside the project team’s opening schedule. Keep positive and outward pressure comparisons separate, record the reference for each exact assembly, and see which window prices can be compared once the written scope and records align.

Written impact window proposals

Compare impact window quotes and opening records

Check entered frame dimensions and documented pressure values against the project schedule before comparing costs.

Reconcile the window records and written scope before ranking prices.

Quote A

$9,280.00

Written total

3 of 3 active records align

Scope matched

Quote B

$9,030.00

Entered total · comparison pending

2 of 3 active records align

Scope matched

6 windows on the entered schedule.

This audit compares entered records and prices. Use the project team and permitting authority to confirm requirements and document applicability.

Opening schedule and recorded pressures

The dark mark shows the scheduled value. Each bar shows a documented value. Differences are calculated separately for the two directions.

Opening 1 · 2 windows

Scheduled frame 36 in × 48 in

Quote A

Entered records align

Example A-01 p4

Assembly · Match recorded. Impact scope · Match recorded.

Width difference 0 in · Height difference 0 in

Positive pressure+10 psf

Scheduled 45 psf · Recorded 55 psf

Outward pressure+8 psf

Scheduled 55 psf · Recorded 63 psf

Quote B

Entered records align

Example B-01 p2

Assembly · Match recorded. Impact scope · Match recorded.

Width difference 0 in · Height difference 0 in

Positive pressure+5 psf

Scheduled 45 psf · Recorded 50 psf

Outward pressure+7 psf

Scheduled 55 psf · Recorded 62 psf

Opening 2 · 3 windows

Scheduled frame 42 in × 60 in

Quote A

Entered records align

Example A-02 p5

Assembly · Match recorded. Impact scope · Match recorded.

Width difference 0 in · Height difference 0 in

Positive pressure+15 psf

Scheduled 50 psf · Recorded 65 psf

Outward pressure+15 psf

Scheduled 60 psf · Recorded 75 psf

Quote B

Recorded difference

Example B-02 p3

Assembly · Match recorded. Impact scope · Match recorded.

Width difference 0 in · Height difference 0 in

Positive pressure+15 psf

Scheduled 50 psf · Recorded 65 psf

Outward pressure−0.01 psf

Scheduled 60 psf · Recorded 59.99 psf

Opening 3 · 1 window

Scheduled frame 60 in × 50 in

Quote A

Entered records align

Example A-03 p6

Assembly · Match recorded. Impact scope · Match recorded.

Width difference 0 in · Height difference 0 in

Positive pressure+5 psf

Scheduled 55 psf · Recorded 60 psf

Outward pressure+2 psf

Scheduled 70 psf · Recorded 72 psf

Quote B

Entered records align

Example B-03 p4

Assembly · Match recorded. Impact scope · Match recorded.

Width difference 0 in · Height difference 0 in

Positive pressure+5 psf

Scheduled 55 psf · Recorded 60 psf

Outward pressure+2 psf

Scheduled 70 psf · Recorded 72 psf

Compare repeated opening counts

Vary the count of identical windows on one scheduled row. The written unit prices and opening records stay fixed.

Entered price by repeated opening count
Plot range $7,070.00 to $45,000.00Selected 2 windows
Impact window quote prices by repeated countEntered totals at each whole-window count. Selected 2 windows on opening 1. Reconcile the window records and written scope before ranking prices.02040
Quote AQuote BWindows on the selected schedule row
  • 0–40 · Unresolved

Project opening schedule

Enter the scheduled product frame dimensions and pressures from the project team. Group windows only if they share the exact schedule and assembly.

Edit opening schedule (3)
Scheduled opening 1
Scheduled opening 2
Scheduled opening 3

Exact assembly records and written prices

Enter the exact configuration’s listed values. A document match records the project team’s review. Use ? for a missing number or term and 0 for a confirmed included charge. A blank job-size cap means the quote has no written cap.

Edit both quote records
Quote A terms
Listed opening 1
Listed opening 2
Listed opening 3
Quote B terms
Listed opening 1
Listed opening 2
Listed opening 3

Entered installation charges

Review installation line items

Quote A

Opening 1 installation
$1,720.00
Opening 2 installation
$3,870.00
Opening 3 installation
$1,710.00
Separate disposal
$480.00
Fixed job charges
$1,500.00

Quote B

Opening 1 installation
$1,860.00
Opening 2 installation
$3,420.00
Opening 3 installation
$1,650.00
Separate disposal
$300.00
Fixed job charges
$1,800.00

How to use this calculator

  1. Enter each scheduled frame size, positive and outward pressure, and the count of identical windows.
  2. For each exact quoted assembly, enter the documented values and its reference. Record the project team’s assembly and impact scope checks.
  3. Enter installed unit prices, disposal, other fixed charges, any written count limit and whether the installation scope matches.
  4. Review the two pressure directions and every row issue. After reconciling the records, compare the entered prices, explore identical-unit quantities, and export the audit CSV.

The Formula

The mathematical logic powering this calculation is:

Use the project team’s scheduled product frame dimensions and separate positive and outward pressure requirements. Enter one row for each identical group. Enter the exact quoted assembly’s recorded frame size and applicable pressure values. Use only values the project team has confirmed for the assembly and its application. Record the document number and page, a match for the exact assembly document and a match for the requested impact scope separately.

Frame differences equal recorded frame dimension minus scheduled frame dimension. Equality means the entered frame values agree. Use the same size convention for both entries. These are frame dimensions, so enter the project team’s scheduled product dimensions. The calculator never converts rough openings or selects a frame.

Pressure differences equal recorded magnitude minus scheduled magnitude for each direction. A negative difference means the corresponding entered value is below the scheduled value. An equal value has zero difference. Enter positive pressure as a positive value. For outward pressure, enter the magnitude or the negative signed value. The worksheet compares magnitudes in their own columns. A larger difference in one direction cannot cancel a shortfall in the other.

A row’s entered records align when both frame numbers agree, each recorded pressure is at least the corresponding schedule entry, both documentary matches are recorded and the reference is supplied. Known differences and missing entries remain distinct. This audit only checks the entered numbers and records. The project team and relevant authority establish the schedule, verify the exact documents and assess applicability. No pressure, approval, compliance or installation outcome is calculated.

The entered window total is the sum of installed prices per window × row counts, plus separate disposal per window and other fixed job charges. Enter zero for charges included elsewhere. Zero total windows gives no order. Leave the last priced job size blank when no limit applies. Keep pricing open above a stated limit. A quote can have complete arithmetic while a record or scope discrepancy prevents ranking. Test repeated counts only for identical scheduled assemblies while holding all other rows fixed.

The worksheet supports up to four rows and 0–40 windows on each row. Frame measurements support 1–240 in and pressure magnitudes 0.01–300 psf, both with up to two decimals. Installed prices support up to $100,000 per unit, disposal up to $10,000 per unit and fixed charges up to $1,000,000. References accept up to 56 letters, numbers and basic document punctuation. Examples are illustrative and their document references are fictional.

Worked Example

If you input:

  • Schedule: Three opening groups, six windows total. Opening 2 schedules outward pressure of 60 psf in magnitude.
  • Quote A: Entered total of $9,280 with all three opening rows aligned in the example.
  • Quote B: Entered total of $9,030. The listed outward magnitude is 59.99 psf on Opening 2.

Result:

Both entered totals are visible while the 0.01 psf difference keeps the ranking open. In the matching-records example, the documented value for B is 60 psf, its prices are unchanged, and B is $250 lower.

Frequently Asked Questions

Can I use the highest pressure published for a window series?

Use the figures the project team confirms for the exact quoted size, glazing and configuration. The reference field records where those figures came from.

Why are there two separate pressure comparisons?

The project schedule specifies positive and outward values separately. Each listed magnitude is compared with its own scheduled direction, preserving any difference.

Should I enter rough opening dimensions?

Enter the scheduled product frame dimensions from the project team and compare those with the same frame dimensions in the quote.

Why can a proposal have a total while the ranking is open?

Entered prices can add up even when a schedule value, exact document reference, assembly match, impact scope or installation term remains unresolved.

Does this replace the project team’s review?

Use the worksheet to organize and compare entered records and charges. The project team and relevant authority confirm applicable requirements, records and installation conditions.

Similar Calculators