House Repipe Route, Stock & Quote Planner

Enter two measured hot and cold water supply layouts for the same fixture schedule. Trace the route to each fixture, see which connections an entered valve reaches, and fit each continuous cut into compatible stock. Compare complete written quotes or see which unpriced work can change the difference.

Project comparison

Compare repipe routes, coil stock and quotes

Map measured hot and cold runs to fixtures. Compare compatible coil purchases, entered valve scope and the costs you can confirm.

Route and quote comparison

Proposal A

Measured pipe
74 ft
Coil purchase
2 coils · 100 ft
Shared-run credit
0 ft
Quote
$299.00

Proposal B

Measured pipe
44 ft
Coil purchase
2 coils · 100 ft
Shared-run credit
30 ft
Quote
$271.00 known

Complete both quote totals to compare prices.

Edit fixtures and proposals

Fixture schedule

Use the same fixture requirements for both proposals. Assign each required connection to its terminal node below.

Fixture 1

Fixture 2

Fixture 3

Proposal A

Proposal A measured runs

Start each service at source. A branch can already have an upstream run. Enter its complete measured cut in feet.

Run 1

Run 2

Run 3

Proposal A fixture connections and valves

Add the valves listed in this proposal. They can refer to an entered node or its own service source.

Valve 1

Valve 2

Valve 3

Proposal A coil groups

Pool runs only within a documented compatible group. Available length equals the nominal coil minus trim at both ends.

Group 1

Proposal A written scope

Proposal B

Proposal B measured runs

Start each service at source. A branch can already have an upstream run. Enter its complete measured cut in feet.

Run 1

Run 2

Run 3

Run 4

Run 5

Run 6

Proposal B fixture connections and valves

Add the valves listed in this proposal. They can refer to an entered node or its own service source.

Valve 1

Proposal B coil groups

Pool runs only within a documented compatible group. Available length equals the nominal coil minus trim at both ends.

Group 1

Group 2

Proposal B written scope

Fixture paths and valve scope

Each line in the schematic is a measured pipe run. The drawing follows connections. Developed path lengths count every run each connection uses.

Proposal A

Developed paths
74 ft
Unassigned pipe
0 ft
Proposal A cold route. 3 runs and 3 fixture connections.123
  1. Bath · 14 ftsource → bathRuns 1
  2. Kitchen · 28 ftsource → kitchenRuns 2
  3. Laundry · 32 ftsource → laundryRuns 3
Show proposal a cold run ledger
Run 1 · source → bath
14 ft
Run 2 · source → kitchen
28 ft
Run 3 · source → laundry
32 ft

Proposal B

Developed paths
74 ft
Unassigned pipe
0 ft
Proposal B cold route. 6 runs and 3 fixture connections.321
  1. Bath · 14 ftsource → j1 → bathRuns 1, 4
  2. Kitchen · 28 ftsource → j1 → j2 → kitchenRuns 1, 2, 5
  3. Laundry · 32 ftsource → j1 → j2 → j3 → laundryRuns 1, 2, 3, 6
Show proposal b cold run ledger
Run 1 · source → j1
10 ft
Run 2 · j1 → j2
10 ft
Run 3 · j2 → j3
6 ft
Run 4 · j1 → bath
4 ft
Run 5 · j2 → kitchen
8 ft
Run 6 · j3 → laundry
6 ft

Coil purchase and cut ledger

Bars show each nominal coil. Blue and violet are whole cuts, amber is end trim, and slate is unused usable stock.

Proposal A

Cut length
74 ft
Bought length
100 ft
Total end trim
0 ft
Usable remnant
26 ft
½ in · U860W50

50 ft usable per coil. Minimum 2 coils proved.

Coil 1 · 4 ft usable remnant

  • Cold · source → laundry · 32 ft
  • Cold · source → bath · 14 ft

Coil 2 · 22 ft usable remnant

  • Cold · source → kitchen · 28 ft

Proposal B

Cut length
44 ft
Bought length
100 ft
Total end trim
0 ft
Usable remnant
56 ft
½ in · U860W50

50 ft usable per coil. Minimum 1 coil proved.

Coil 1 · 32 ft usable remnant

  • Cold · j2 → kitchen · 8 ft
  • Cold · j3 → laundry · 6 ft
  • Cold · j1 → bath · 4 ft
¾ in · U870W50

50 ft usable per coil. Minimum 1 coil proved.

Coil 1 · 24 ft usable remnant

  • Cold · source → j1 · 10 ft
  • Cold · j1 → j2 · 10 ft
  • Cold · j2 → j3 · 6 ft

Written quote scope and export

Included contributes zero additional cost. An unpriced or pending line keeps the complete total open.

Proposal A

½ in · U860W50 × 2
$80.00
Bath stop
$8.00
Kitchen stop
$8.00
Laundry stop
$8.00
Manifold
$75.00
Labor
$120.00
Restoration
Included
Known subtotal
$299.00
Complete total
$299.00

Proposal B

½ in · U860W50
$40.00
¾ in · U870W50
$55.00
J2 isolation
$14.00
Tees × 2
$12.00
Labor
$150.00
Restoration
Unpriced
Known subtotal
$271.00
Complete total
Incomplete
Download repipe comparison CSV
Show selectable CSV text

Use measured and documented entries for each proposal. The worksheet covers quantity, route membership and entered prices. Tubing selection, water delivery, installation design and applicable requirements need their own review.

How to use this calculator

  1. Enter the common fixtures and the service each requires.
  2. Enter each proposal’s measured runs. Start from source. For each run, enter the upstream and downstream node, service, complete cut length and compatible stock group.
  3. Map each fixture connection to the appropriate terminal node. Add any written valve locations and inspect their route scope.
  4. Enter nominal coil lengths, documented trim and any project-specific minimum cut. Confirm and review the whole-coil allocation.
  5. Enter the quoted hardware, labor and restoration coverage. Compare complete prices or download the worksheet to track remaining costs.

The Formula

The mathematical logic powering this calculation is:

The worksheet builds independent hot and cold graphs from the measured schedule in each proposal. Each service starts at source. Each downstream node has one upstream measured run and a path to its service source. Each required fixture connection maps to an unshared terminal node. One whole finished cut is assigned to each measured run, including the allowances already authored in that plan.

Developed feet add the path for every scheduled connection. Physical feet add each measured run once, including unassigned runs. Used feet add each run that reaches at least one scheduled connection once. Shared-run credit equals developed feet minus used feet. Unassigned length is physical feet minus used feet. An entered valve's modeled scope contains the connections whose own same-service paths pass through its node.

Usable coil length equals nominal length minus twice the entered end trim. Each unspliced cut must be at least the entered group minimum and at most the usable coil length. Group IDs define which cuts may share a coil. Within each group, cuts are sorted from longest to shortest and placed into the fitted coil with the smallest remaining length or a new coil. The reported lower bound is the greater of total cut length divided by usable coil length rounded up or the number of cuts larger than half the usable coil. A placed order that reaches the lower bound proves the minimum. Other feasible orders provide a checked example with a separate lower bound. Acquired length equals cut length plus all end trims plus usable remnant.

One price per acquired coil or listed valve is entered with one authored hardware line or bundle, labor and restoration. Priced lines multiply the entered amount by the item count. Included records work whose charge is covered elsewhere within the entered quote. Unpriced or pending work leaves the complete total open. Amounts use exact integer cents and at least one explicit price is needed for a complete comparison. All prices and scenario measurements are illustrative.

One comparison supports 1–8 fixtures and up to 24 measured runs, six coil groups and 12 documented valves for each proposal. Measured lengths use feet with up to three decimals and a maximum of 10,000 ft. Price entries support cents up to $10,000,000 per item. Tubing selection, actual valve operation, hydraulic behavior, material approval and applicable requirements need a separate review.

Worked Example

If you input:

  • Measured cold fixtures: Bath, Kitchen and Laundry at developed lengths of 14, 28 and 32 ft.
  • Proposal A inventory and stock: 74 ft of dedicated runs in one compatible group. Two 50 ft coils.
  • Proposal B inventory and stock: 44 ft of shared and dedicated runs in two compatible groups. One 50 ft coil in each group.
  • Quote scope: A includes restoration. B’s restoration remains unpriced.

Result:

Proposal B uses 30 ft less measured tubing, and both layouts purchase 100 ft. A has a complete $299 quote. B has $271 in known charges and an open restoration price. Adding exactly $28 in B restoration would tie the complete totals.

Frequently Asked Questions

Why do the fixture path lengths add up to more than the pipe I need?

Separate fixtures can use the same upstream run. The developed length counts that segment for each fixture path. The stock order includes that physical run once.

Can hot and cold runs use the same stock group?

Only when their cuts use the same compatible stock supplied in your plan. Enter the same group for those runs. Hot and cold routing remain independent in the fixture diagram.

What does a valve scope highlight?

It shows the fixtures with entered paths downstream of that valve on the same service. The actual system may have controls and relationships beyond the measured route schedule.

Does rounding total feet up give a sufficient coil order?

Each continuous cut must fit entirely inside one usable coil. Three 26 ft cuts need three 50 ft coils because any pair exceeds 50 ft. The allocation shows each cut, trim and usable remainder.

When is a coil count the minimum?

A count is proved when the displayed allocation reaches the required lower bound. When the allocation uses more coils than that bound, it is one feasible order.

How do I compare quotes when restoration is unpriced?

Mark the work Unpriced and keep the known subtotal for review. Enter the separate amount once confirmed or choose Included when the quote confirms it is already covered.

Similar Calculators