Lumber Cut List & Purchase Planner
Turn finished part lengths into an inspectable lumber purchasing plan. Compare up to three supplier quotes with multiple stock lengths, account for a finite collection of existing boards, and locate every finished piece on a source board. Compare prices per board, meter, foot or board foot without confusing actual material dimensions with supplier billing dimensions. The planner exposes its search status and exact cut ledger, so a plan found at a search limit is never presented as a proven best purchase.
Buy boards with a cut plan in hand
Compare supplier quotes, reuse existing boards and see where each finished part fits. Exact dimensions and explicit search limits keep the purchasing decision inspectable.
Start with a project
Examples use hypothetical prices and compatible rectangular stock. This plans purchases and linear cuts; it does not assess structural suitability or generate machine instructions.
Enter compatible linear stock, not a structural design. Up to 64 finished pieces, 64 existing boards, 8 materials and 3 independent supplier quotes. Quotes share the same starting inventory; they are alternatives, not combined orders.
Converts dimensions exactly. Price bases and rates stay unchanged.
Three uppercase letters, such as USD. All quotes use this currency.
1. Define compatible materials
Use separate materials for different species, grades or profiles. Enter actual physical cross-sections; billing dimensions are entered separately for board-foot quotes.
Decimal or unsigned fraction, such as 3/2.
Decimal or unsigned fraction, such as 3/2.
4 assigned rows. Reassign those rows before removing this material.
2. List finished parts
Finished lengths exclude saw kerf. Maximum 24 rows and 64 pieces in total.
Only parts and boards with the same material are combined.
Decimal or unsigned fraction, such as 3/2.
Whole pieces only.
3. Add existing boards (optional)
Finite inventory has zero new purchase cost. The planner may leave boards untouched. End trim is removed from each end and includes preparation loss.
Only parts and boards with the same material are combined.
Decimal or unsigned fraction, such as 3/2.
Whole pieces only.
Decimal or unsigned fraction, such as 3/2.
4. Compare supplier quotes
Up to six stock types per quote, with unlimited availability. Leave a quote’s stock list empty to test inventory alone. Rates exclude tax, freight and labor.
Decimal or unsigned fraction, such as 3/2.
Decimal or unsigned fraction, such as 3/2.
Compare complete purchase plans
Optimize new purchase cost, then purchased gross length, then number of opened boards. Existing boards have zero incremental cost. Each quote starts with the same inventory.
2.4 m stock quote
USD 40
Proven optimum
4800 mm purchased · 2 boards opened
Cash lower bound: USD ≈26.67. A cash bound does not prove the other priorities.
3.6 m stock quote
USD 28
Proven optimum
3600 mm purchased · 2 boards opened
Cash lower bound: USD ≈24.89. A cash bound does not prove the other priorities.
Bars compare complete-plan cash only, on a shared scale from zero to USD 40. An incomplete search is never shown as a zero-cost plan. A feasible plan at the search cap may improve with another arrangement.
2.4 m stock quote: Proven optimum
16 search nodes visited; limit 20000. “Proven optimum” certifies all three priorities. “No complete plan exists” applies only to the entered materials, lengths and availability.
- Opened gross length
- 4800 mm
- Finished parts
- 4400 mm
- End trim
- 0 mm
- Saw loss
- 12 mm
- Remaining length
- 388 mm
Gross length = finished parts + end trim + saw loss + remaining length. Remaining material is not automatically reusable. End trim includes preparation loss; cuts remove the entered kerf or the smaller remaining end material.
Left-to-right cutting order. Green: parts; slate: end trim; amber: saw loss; pale blue: remaining material. Very small segments may be invisible at this scale; every segment is listed below.
| Segment | Part | Start | End |
|---|---|---|---|
| 1. part | Finished rail #1 | 0 mm | 1100 mm |
| 2. kerf | — | 1100 mm | 1103 mm |
| 3. part | Finished rail #2 | 1103 mm | 2203 mm |
| 4. kerf | — | 2203 mm | 2206 mm |
| 5. remnant | — | 2206 mm | 2400 mm |
| Part | Length | Source board | Start | End |
|---|---|---|---|---|
| Finished rail #1 | 1100 mm | 0 mm | 1100 mm | |
| Finished rail #2 | 1100 mm | 1103 mm | 2203 mm | |
| Finished rail #3 | 1100 mm | 0 mm | 1100 mm | |
| Finished rail #4 | 1100 mm | 1103 mm | 2203 mm |
| Stock | Boards | New cost | Billing board feet |
|---|---|---|---|
| 2400 mm board | 2 | USD 40 | Not billed by board foot |
| Source | Opened | Untouched |
|---|---|---|
| Existing offcut | 0 | 1 |
Keep the assumptions with the plan
CSV includes every quote, exact input, cut position, physical volume and search status. Lengths are exported in millimeters and physical volumes in mm³; billing volumes use board feet. Display values marked ≈ are rounded.
How to use this calculator
- Load Supplier price comparison or Use existing boards. Prices and material choices are hypothetical. Open Edit parts and quotes to enter your project.
- Define compatible materials using actual thickness and width, then enter finished part lengths and integer quantities. Assign each part to the correct material.
- Add existing boards with gross lengths, quantities and trim at each end. Inventory is optional and may remain untouched when opening it would not improve the purchase objective.
- Enter up to three supplier quotes with kerf and stock types. Choose each stock's price basis and rate; enter billing thickness and width for board-foot pricing. Update cut plans.
- Compare complete costs and proof status. Inspect a source board or locate a finished part in the table. Review the purchase and inventory lists, then download the exact CSV or use its selectable copy.
The Formula
The mathematical logic powering this calculation is:
For gross board length L and trim t at each end, usable length U = L − 2t. A compatible set of n finished parts fits when sum(part lengths) + (n − 1) × kerf ≤ U. Parts are cut in descending length with stable identifiers breaking ties. After each part, a separation cut is recorded when material remains: removed material = min(kerf, remaining end material). Zero-width separation still counts as a cut. End trim includes preparation loss. Gross length = parts + end trim + saw loss + remaining length. Physical volumes multiply each length by that material's actual thickness and width.
Supplier charge per board equals the entered rate for per-board pricing; rate × gross meters or feet for linear pricing; or rate × gross length × billing thickness × billing width / 2,359,737.216 mm³ for board-foot pricing. One board foot is 144 cubic inches. Billing dimensions are explicit supplier inputs, independent of actual cross-section. One inch = 25.4 mm; one foot = 304.8 mm. No rounding to a supplier's minimum billable increment is inferred.
Optimize lexicographically: new purchase cash first, then new purchased gross length, then opened source boards. Existing boards have zero incremental purchase cost and finite availability. Stock types have unlimited availability. Each quote independently receives the same inventory. Deterministic seed plans and branch-and-bound search inspect at most 20,000 nodes per quote. Optimal means exhaustive proof of all three priorities; feasible means a complete plan found before the cap, without a proof of optimality. Infeasible means exhaustive search found no complete plan. Unresolved means the cap was reached without a complete plan. Incomplete plans have no purchase total or cut ledger.
A cash lower bound sums, by material, max(0, total finished length − available usable inventory length) × minimum offered cash per gross length. It ignores kerf, trim and whole-board rounding and proves nothing about the secondary objectives. If positive unmet material has no offered stock, the cash bound is unavailable.
Limits: 1–8 materials, 1–24 demand rows, 0–24 inventory rows, 1–3 quotes and 0–6 stock types per quote; at most 64 demanded pieces and 64 existing boards. Positive lengths through 100,000 mm, actual/billing dimensions through 3,000 mm, kerf 0–20 mm. Both end trims must leave positive usable length. Rates are nonnegative decimals through 1,000,000,000 with up to six decimal places. Geometry supports six entered decimal places or unsigned fractions with up to 24 digits in numerator and denominator. Unit switches preserve exact quantity or explain why conversion cannot be represented. Display approximations are marked; CSV retains exact rational values.
No structural sizing, species/grade assessment, ripping, splicing, defects, tax, freight, labor, resale value or machine safety instructions are included. Define separate compatibility classes where substitution is not acceptable. Remaining material is not automatically reusable, and a zero-kerf boundary is not a saw recommendation.Worked Example
If you input:
- Parts: Four 1,100 mm rails; compatible actual section 38 × 89 mm.
- Inventory: One 1,200 mm existing board; no end trim.
- Quotes: 2,400 mm boards at USD 20 versus 3,600 mm boards at USD 28; 3 mm kerf, no end trim.
Result:
The short-stock quote buys two 2,400 mm boards for USD 40 and leaves the existing board untouched. The long-stock quote buys one 3,600 mm board for USD 28 and opens the existing 1,200 mm board. Both plans open two boards with total gross length 4,800 mm: 4,400 mm of finished parts, 12 mm saw loss and 388 mm remaining length. Both are proven optima for their respective quotes. The USD 28 plan uses the existing board to avoid another purchase.
Frequently Asked Questions
How is this different from a board-foot converter?
It chooses whole source boards for a specific cut list, compares supplier offers, tracks finite existing inventory and shows every cut position. Board-foot pricing is one supported billing basis, not a separate conversion-only workflow.
Does the cheapest price per foot give the cheapest project?
Not necessarily. Whole stock lengths, kerf, end trim and existing boards determine the actual order. A longer or more expensive individual board can replace several purchases. Compare complete plan cost and proof status.
Why can existing boards remain untouched?
The primary goal is minimum new purchase cash, followed by purchased length and opened boards. If an existing board cannot reduce purchases, leaving it untouched can reduce the number of opened boards. Historical inventory cost and resale value are not included.
Should board-foot prices use nominal or actual dimensions?
Ask the supplier which dimensions determine its bill and enter those as billing thickness and width. Enter actual physical dimensions separately in the material. The planner does not assume a universal nominal-size or minimum-billing rule.
What does feasible rather than optimal mean?
A feasible plan assigns every part to available compatible stock but the 20,000-node search cap prevented an exhaustive proof. Its cost is a usable complete-plan cost, not a guaranteed minimum. The displayed lower bound concerns cash only.
What if no plan is shown?
Infeasible means the entered problem was exhaustively searched with no complete assignment. Unresolved means search stopped at its cap without a complete assignment. Neither state means zero cost. Check compatible materials, usable stock lengths and inventory, or simplify the alternatives.
How are saw kerf and end trim handled?
Trim is removed from both ends and includes preparation loss. Adjacent parts need a separation kerf. When a final part leaves less material than a full kerf, only the material remaining on the board is charged as saw loss. The ledger shows the exact convention; confirm your practical cutting process separately.
Can it design framing or combine different wood grades?
No. It is a one-dimensional purchasing and cutting planner. You define compatibility classes; it does not establish structural capacity, grade equivalence, ripping layouts, acceptable defects or safe machine settings.
Similar Calculators
Plywood Cut Planner
Plan rectangular plywood cuts with kerf and rotation constraints. Compare eight sheet layouts and inspect parts, cuts and remnants.
Rebar Calculator
Plan a rectangular rebar grid, inspect every bar position and compare stock-cut purchases with exact cutting losses and a complete CSV report.
Plank Flooring Layout & Cost Calculator
Compare plank flooring layouts, staggered rows and compatible offcut reuse. Visualize cuts, check entered installation limits, estimate whole packs and project costs.
Wall Stud Calculator & Framing Takeoff
Plan wall studs around doors and windows. Compare specified layouts in a scaled elevation, inspect every member and export exact framing cut lists and quantities.