Battery Runtime Calculator & Duty Cycle Planner
Turn a rated battery capacity into a runtime estimate for two recurring operating patterns. Enter each step in battery-side DC amps or inverter output watts. Compare how much charge remains at your target, where an entered current limit is exceeded, and what starting charge each profile requires. Use the fixed amp-hour model with measured current or add a Peukert exponent and nameplate rate to estimate discharge-rate effects.
Compare steady and repeating battery loads
See whether two load profiles can reach a runtime target and preserve a chosen charge reserve.
Profile A load cycle
Battery-side draw added to every step.
Step 1
Profile B load cycle
Battery-side draw added to every step.
Step 1
Step 2
Profile A falls short of 12 h. Profile B covers 12 h.
- Profile A
- Profile B
- Reserve
The horizontal axis shows elapsed hours. Each line ends at its modeled stop or the target. The worksheet gives the exact rows used to calculate both lines.
Cycle loads and starting charge
Profile A
8 Ah drawn in a 1 h cycle
Starting charge for target · 116%
A full charge is below this target’s requirement.
Profile B
4.125 Ah drawn in a 1 h cycle
Starting charge for target · 69.5%
| Step | Cycle time (min) | Load as entered | Battery current (A) | Draw (Ah) | Rated draw (Ah) |
|---|---|---|---|---|---|
| A1 | 0–60 | 8 A DC | 8 | 8 | 8 |
| B1 | 0–15 | 96 W AC | 10.5 | 2.625 | 2.625 |
| B2 | 15–60 | 1.5 A DC | 2 | 1.5 | 1.5 |
Show selectable CSV
How to use this calculator
- Enter pack capacity, nominal voltage, starting charge and the reserve to protect. Use a measured retained-capacity estimate when available.
- Choose fixed amp-hours for the constant-capacity estimate. Choose Peukert when you have a nameplate hour rating and an applicable exponent.
- Build up to six ordered load steps for each profile. Enter DC amps from the battery or AC watts at the inverter output. Enter inverter efficiency only for profiles that supply AC loads.
- Set a runtime target and, if applicable, an entered DC current limit. Compare estimated runtime, required starting charge and the first constraint.
- Check the per-cycle load worksheet and download or copy the CSV for the exact model points.
The Formula
The mathematical logic powering this calculation is:
Retained capacity equals nameplate amp-hours times the entered retained fraction. The available rated charge equals retained capacity times the difference between starting and reserve fractions. A measured DC step draws its entered current plus battery-side standby current. An AC step draws output watts divided by nominal battery volts and inverter efficiency, then adds the same standby current. Apply standby once per step. Physical amp-hours are battery current times hours.
In fixed amp-hour mode, physical and rated-equivalent charge use the same number. In Peukert mode, the reference current equals nameplate amp-hours divided by its associated hour rating. Using exponent k, rated-equivalent current is I × (I / reference current)^(k − 1). Zero current uses zero charge. At exponent 1 or at the reference current, equivalent and physical rates coincide. The capacity-retention factor adjusts the available bucket. The nameplate reference stays tied to the original rating. This is a piecewise discharge approximation. The same exponent and nominal voltage apply throughout the schedule.
Each ordered group of steps repeats without recharging. Sum whole cycles and solve the fractional final step against the available charge. The first unsupported positive draw marks the reserve stop. A zero-draw interval can continue after the available charge reaches the reserve if the next positive step starts later. A finite entered peak limit stops service when the first step needs more DC current than that limit. Exactly meeting the limit is allowed. A target completed precisely at the start of a blocked step has been covered.
Required starting charge is the reserve plus the modeled rated charge used by the target, expressed as a percentage of retained capacity. A value over 100% means the target needs more charge than this pack holds. When the current limit blocks the target, increasing charge alone cannot fix the profile. The chart samples the steps through the earlier of a modeled stop and the runtime target. For long sequences it samples at evenly spaced times. The CSV contains the same points and the per-cycle step ledger.
Enter 1–6 steps per profile, with each step lasting 0.01–1,440 minutes. The runtime target is 0.01–168 hours. The model reports whether the first stop occurs in a 365-day window. It shows all-zero load and a lifetime exceeding that window as separate results. Use 0.001–1,000,000 Ah, 1–2,000 nominal V, 0–5,000 battery-side A and 0–500,000 AC W per step, efficiency and retained capacity 1–100%, rating duration 1–200 hours, and exponent 1–1.5. Inputs take up to four decimal places. Use an entered continuous current limit only when one applies to the whole pack and circuit. Use equipment data for voltage sag, surge current, automatic cutoffs, temperature and installation. This model treats those effects as outside the runtime estimate.Worked Example
If you input:
- Battery: 100 Ah at 12 V
- Starting charge and reserve: 100% and 20%
- Profile A: 8 A continuously
- Profile B: 96 W for 15 minutes, then 1.5 A for 45 minutes
- Profile B standby and efficiency: 0.5 A and 80%
- Runtime target: 12 hours
Result:
Profile A draws 8 Ah per hour and has 10 hours above reserve. Profile B draws 10.5 A in its AC step and 2 A during its other step. It uses 4.125 Ah per cycle, with about 19.155 hours above reserve. At 12 hours, Profile B needs 69.5% starting charge to protect the 20% reserve. Profile A would need 116%.
Frequently Asked Questions
How do amps turn into amp-hours?
Multiply the battery-side current in amps by the time in hours for each step. Add the step usage for a cycle. Some capacity ratings need a separate discharge-rate adjustment before you compare against the rated bucket.
Should I enter watts or amps?
Use battery-side measured or stated amps for a DC step. Use device watts at the inverter output for an AC step. The model estimates the battery-side current from nominal pack voltage and inverter efficiency. Enter battery-side standby current separately.
What does a C20 rating mean?
It describes the stated capacity at a twenty-hour discharge rating. A 100 Ah C20 battery uses 5 A as the calculation’s reference current. Faster discharge can reduce modeled usable charge when the entered exponent is greater than one.
Why does a plan stop with charge remaining?
A step may exceed the circuit’s entered DC current limit before the energy reserve is reached. In the rate-and-limit example, Profile B stops at the second step after 20 minutes.
Why does a zero-load interval remain when the reserve is already reached?
A step that draws zero battery current can continue without using reserve. The first positive demand that would take the pack below reserve determines the stop.
Does the chart account for real battery cutoffs?
The chart uses nominal voltage and the two entered load profiles. Compare the result with equipment data and measured current, especially when voltage sag, an inverter’s peak demand, cold temperatures or pack protection can change the time available.
Similar Calculators
Ohm's Law Calculator
Calculate voltage, current, or resistance using Ohm's Law — enter any two values to find the third.
Power Calculator
Calculate electrical power in watts from voltage and current, or find current from power and voltage.
Running Pace Calculator
Calculate running pace, speed, and projected finish times from distance and duration.
Solar Battery Sizing & Backup Planner
Compare solar battery sizes with hourly solar and load profiles, storage losses, power limits, signed tariffs and grid outages. Visualize energy flows and export the complete ledger.
DC Voltage Drop & Cable Loss Calculator
Compare DC cable voltage drop, power losses and load limits with separate conductor lengths, connection resistance, constant-power loads and visual sweeps.
AC Power & Power Factor Calculator
Calculate AC watts, vars, volt-amps and power factor for single-phase or balanced three-phase loads. Combine leading and lagging loads, compare an ideal target PF and export the ledger.