Electrical Wiring Cost & Cable Reel Cut Planner

Turn measured runs and explicit cut allowances into a cable takeoff for one specified material. Compare two quotes using existing partial reels and up to four quoted reels each. The cut strip chart and downloadable ledger show every assignment, stranded remainder and the best coverage possible when a quote falls short.

Cable material takeoff

Plan continuous cable cuts before buying reels

Edit measured cable runs
Run 1
Run 2
Run 3
Run 4
Edit existing reels and quoted lots
Quote A
Quote B
Quote A is the lower-cost purchase that covers every run.

Required cable

18 m

4 continuous runs · 9.75 m in stock

Quote A

$78.00

1 new reel needed · 18.35 m pooled

Every run fits · 0.35 m left across reels

Quote B

$96.00

1 new reel needed · 19.75 m pooled

Every run fits · 1.75 m left across reels

Inspect the reel cut plan

Reel length (m)

Stock 1 · 9.5 m usable

9.5 m assigned · 0 m left on this reel

  • Run 2 · 5 m
  • Run 3 · 4.5 m

This allocation covers every run.

Largest unused length on one reel 0.25 m

Review cable cuts and export
Cable reel and cut ledger
PlanReelLength (m)Used (m)Unused (m)Assigned runs
Existing stockStock 19.59.50Run 2 (5 m), Run 3 (4.5 m)
Existing stockStock 20.2500.25None
Quote AStock 19.59.50Run 2 (5 m), Run 3 (4.5 m)
Quote AStock 20.2500.25None
Quote AA-18.68.50.1Run 1 (5.5 m), Run 4 (3 m)
Quote BStock 19.581.5Run 2 (5 m), Run 4 (3 m)
Quote BStock 20.2500.25None
Quote BB-110100Run 1 (5.5 m), Run 3 (4.5 m)

How to use this calculator

  1. Enter each continuous route measurement and its total documented cut allowance.
  2. Enter the actual unused length on up to two reels of the same material. Use zero for missing stock.
  3. Enter two quotes for that same material using usable length, available reel count, unit price and any fixed fee.
  4. Compare full-allocation invoices. Inspect the cut strips and switch between stock and each quote to see the allocation or any unassigned runs.
  5. Export all quote inputs, balances and cut assignments as exact CSV.

The Formula

The mathematical logic powering this calculation is:

Cut length equals measured route length plus its whole-run allowance. Enter the total allowance for that cut, including any handling or trimming amount already in the takeoff. Every cut uses one reel of the same cable and no run is split. Reel balance equals the usable reel length minus its assigned cut lengths. An exact zero balance fits.
The allocator tracks the subset of runs that can be supplied after each reel is considered. For each reachable subset, it considers every subset of the remaining runs that fits on the next reel. A full set is feasible if one such allocation reaches it. Both quotes start from the same existing stock and are evaluated independently. The smallest available number of new identical reels producing a full set is the candidate order. If a quote cannot cover the whole job, the witness allocation covers the most runs and then the most assigned metres. Multiple layouts can tie. The displayed layout uses deterministic input order and gives one witness, with its own unused tails.
A qualifying purchase costs the per-reel quote multiplied by the number ordered plus the order fee. The fee applies only when buying at least one reel. Existing material has no new purchase cost in this comparison. A quote with no full allocation has no complete invoice, even when its total pooled length is large enough. Compare entered prices on the same tax, shipping and product basis. The worksheet does not estimate labor or electrical parts outside the quoted reels and fees.
Enter two to eight continuous cuts and two optional existing reel lengths. Measures use metres, to 0.001 m. Each measured cut or new reel length can be 0.001–1,000,000 m, and allowances and existing reels support 0–1,000,000 m. Each offer has 0–4 available reels. Per-reel prices and fixed fees use USD from $0 to $1,000,000 to the cent. Every packing comparison uses exact integer millimetres and every invoice uses exact cents. The strip chart shares one physical scale across all options.
Use an already specified cable and the verified continuous usable length of each reel. The worksheet provides cut allocations and material-price comparisons. Cable sizing, pull tension, allowable connections, electrical design, installation and product approval require separate assessment.

Worked Example

If you input:

  • Run lengths: 5.5 m, 5 m, 4.5 m and 3 m
  • Existing reels: 9.5 m and 0.25 m
  • Quote A: One 8.6 m reel, $70 plus an $8 fee
  • Quote B: One 10 m reel, $90 plus a $6 fee

Result:

At 18 m of required cable, the $78 Quote A covers all four runs with 0.35 m left across the reels. Increasing Run 3 by 0.001 m leaves Quote A with 18.35 m pooled, yet no full continuous allocation. Quote B covers every run for $96.

Frequently Asked Questions

Why is there enough wire in total when an offer still fails?

Each run must fit wholly on one reel. Separate reel balances cannot be joined. The plan checks all run assignments and lists the runs left out of the best partial allocation.

Can I pool two wire types?

The model assumes all stock and offered reels use the exact same specified material and that the entered lengths are continuous and usable. Run a separate worksheet for each material.

What does the invoice include?

A full allocation with purchased reels includes the entered per-reel price times the smallest qualifying reel count and the fixed order fee.

Does this find the most useful remaining tail?

The displayed layout proves feasibility or maximizes partial coverage by run count and then metres. The tail lengths describe that particular layout. Other layouts can leave different tails.

Similar Calculators