Earthwork Cut, Fill & Haul Planner
Use the same terrain survey for two proposed grades. See the cut and fill on a plan view and cross-section, then track excavation, onsite reuse, imported material and surplus hauling on their own volume bases.
Compare earthwork grades, reuse and haul
See what two proposed surfaces cut and fill, what can stay onsite, and what needs hauling.
Example surveys, materials, capacity and prices are illustrative. Enter your measured grades and documented scope.
162 ft² measured footprint
Proposal A
$427.26
- Gross cut · bank
- 1.5 yd³
- Required fill · compacted
- 1.5 yd³
- Inbound trips
- 1
- Outbound trips
- 1
Proposal B
$750.64
- Gross cut · bank
- 0.84375 yd³
- Required fill · compacted
- 2.34375 yd³
- Inbound trips
- 3
- Outbound trips
- 1
Proposal A is $323.38 lower for the entered scope.
Proposal A $427.26. Proposal B $750.64. Proposal A is $323.38 lower for the entered scope.
Cut and fill plan maps
Each cell is divided northwest to southeast. The dashed line marks edges where existing and proposed heights match. X increases to the right and Y downward.
- Cut
- Fill
- Unchanged
- Cut area
- 81 ft²
- Fill area
- 81 ft²
- Unchanged area
- 0 ft²
- Signed geometry · cut minus fill
- 0 yd³
- Cut area
- 60.75 ft²
- Fill area
- 101.25 ft²
- Unchanged area
- 0 ft²
- Signed geometry · cut minus fill
- -1.5 yd³
Existing and proposed elevations
Scale -1 ft to 1 ft. X runs from zero to 18 ft.
- Existing
- Proposal A
- Proposal B
Show selected survey row
| X, ft | Existing, ft | A grade, ft | B grade, ft |
|---|---|---|---|
| 0 | -1 | 0 | 0.25 |
| 18 | 1 | 0 | 0.25 |
Soil reuse and haul
Bank is material before digging. Compacted is fill in place. Loose is material in a truck. Compare amounts on the same basis.
Proposal A
- Bank cut eligible for reuse
- 1.2 yd³
- Bank cut reused
- 1.2 yd³
- Bank cut to export
- 0.3 yd³
- Compacted fill required
- 1.5 yd³
- Compacted onsite fill
- 0.96 yd³
- Imported compacted fill
- 0.54 yd³
- Inbound loose
- 0.675 yd³
- Outbound loose
- 0.375 yd³
Proposal B
- Bank cut eligible for reuse
- 0.675 yd³
- Bank cut reused
- 0.675 yd³
- Bank cut to export
- 0.16875 yd³
- Compacted fill required
- 2.34375 yd³
- Compacted onsite fill
- 0.54 yd³
- Imported compacted fill
- 1.80375 yd³
- Inbound loose
- 2.25469 yd³
- Outbound loose
- 0.21094 yd³
Edit existing terrain survey
Each axis starts at zero. The last X and Y distances determine the footprint. Enter all elevations from one datum.
Edit Proposal A grade and quote
Edit Proposal B grade and quote
Show measured cells and quote lines
| Cell | Cut (bank yd³) | Fill (comp. yd³) |
|---|---|---|
| Y1 X1 | 1.5 | 1.5 |
| Cell | Cut (bank yd³) | Fill (comp. yd³) |
|---|---|---|
| Y1 X1 | 0.84375 | 2.34375 |
| Quote line | Proposal A | Proposal B |
|---|---|---|
| Excavation | $30.00 | $16.88 |
| Compacted placement | $52.50 | $82.03 |
| Imported loose material | $30.38 | $101.46 |
| Outgoing loose disposal | $9.38 | $5.27 |
| Inbound haul | $120.00 | $360.00 |
| Outbound haul | $110.00 | $110.00 |
| Other entered work | $75.00 | $75.00 |
| Entered total | $427.26 | $750.64 |
Export results
Download earthwork comparison CSVShow selectable CSV text
How to use this calculator
- Enter the X and Y distances from your common survey origin and the existing site elevation at each intersection.
- Choose Plane or Grade grid for each proposal. Enter the proposed base and slopes or the full proposed survey heights.
- Review the cut/fill map and selected row profile. Read bank cut, compacted fill and the pipeline of loose import and export by proposal.
- Enter your documented reusable fraction, conversion factors and separate permissible loose load capacities. Copy material, placement, disposal and haul prices using their stated units.
- Compare both written scope totals, then export the station, cell, material and quote ledger.
The Formula
The mathematical logic powering this calculation is:
Start from a common rectangular survey with each axis beginning at zero. Both grades use the same measured stations. A proposed plane has elevation = base + X × X slope/100 + Y × Y slope/100. A proposed grade grid instead uses the exact entered station elevations.
Split each rectangular cell along its northwest-to-southeast diagonal. Within each resulting triangle, the existing and proposed surfaces are linear. Existing elevation minus proposed elevation is positive for cut and negative for fill. Where that difference changes sign across an edge, linearly interpolate where it reaches zero. Split the triangle into cut and fill sections and calculate each volume as horizontal triangle area times the mean of its three vertex differences. Aggregate the absolute amounts by direction and divide cubic feet by 27 for cubic yards. The plan marks equal-elevation edges, unchanged patches and separate cut or fill polygons. A coarse survey or a changed interpolation diagonal can change estimates where elevations vary within cells.
Gross cut is measured in bank cubic yards (BCY) of undisturbed material. Geometry estimates fill as compacted cubic yards (CCY). Eligible bank cut equals gross cut times the entered reusable percentage. Bank actually reused is the smaller of eligible cut and compacted fill requirement divided by the entered compacted yield per reused bank yard. The remaining compacted requirement is imported. Divide that requirement by the supplier's compacted yield per loose imported yard to get the inbound loose volume (LCY). Multiply bank cut left after reuse by the entered outbound swell factor for outgoing loose volume. Round both loose volumes up to whole trips using the entered volume capacity per trip for each direction. Zero volume needs zero trips.
Quoted cost sums excavation on gross bank yards, placement on compacted fill yards, purchased inbound loose yards, disposal on outbound loose yards, each direction's whole trips, and an entered fixed charge. Per-volume quote lines round half up to cents, then the totals add those rounded lines. Enter purchase/disposal rates independently from transport charges according to the quote. The worksheet purchases only the calculated loose volume and prices trips as whole trips. Include bundled or minimum charges in your entered rates or fixed amount.
Inputs allow 2–6 stations per axis, at 0–500 ft in strictly increasing order, and elevations −200 to +200 ft. Plane slopes are −25% to +25% per axis. Reuse is 0–100%, material factors 0.1–4 and permissible capacity 0.1–40 loose yd³ per trip. Measurements and factors accept up to three decimals. Unit rates are $0–$10,000 and fixed costs $0–$1,000,000, up to cents. Terrain and quote inputs are illustrative. Use site-specific reuse criteria, shrink/swell factors and permissible payloads from your project documents. The model compares estimated quantities and prices. Engineering suitability, safety, regulatory approval, truck weight compliance and actual field losses are outside its scope.Worked Example
If you input:
- Existing terrain: 18 × 9 ft measured rectangle. Existing elevation is −1 ft at both left points and +1 ft at both right points.
- Proposal A: Level plane at 0 ft.
- Proposal B: Level plane at +0.25 ft.
- Both material and haul scopes: 80% eligible reuse, 0.8 CCY per reused BCY, 1.25 outgoing LCY per exported BCY, 0.8 CCY per imported LCY, separate 1-LCY trip capacities.
- Both written rates: $20/BCY cut, $35/CCY placement, $45/inbound LCY purchase, $25/outbound LCY disposal, $120 inbound trip, $110 outbound trip, and $75 fixed.
Result:
A cuts 1.5 bank yd³ and fills 1.5 compacted yd³. The entered reuse and shrink yield still leave one inbound and one outbound trip. Its total is $427.26. B cuts 0.84375 bank yd³ and fills 2.34375 compacted yd³, requiring three inbound and one outbound trips for $750.64. Restricting reuse raises both quotes while their surveyed quantities stay the same.
Frequently Asked Questions
Can cut and fill both be positive in the same location?
They can occur in different parts of one measured cell. The worksheet splits interpolated triangles where they reach the proposed grade so that their volumes do not cancel.
Why can a site with equal cut and fill still need trucks?
The gross cut is measured in bank yards, and the fill is measured in compacted yards. Material restrictions and the entered compacted yield can leave excess outgoing cut and an unmet fill requirement at the same time.
How do the two grade modes differ?
Plane applies one signed X slope and one signed Y slope to a base height at the common origin. Grade grid uses each of your submitted elevations and lets the resulting surface vary between the stations.
What should the material conversion factors describe?
Enter compacted volume per unit of reusable bank cut, outbound loose volume per exported bank yard, and compacted volume per inbound loose yard. Enter factors from the applicable site or supplier documentation.
Does changing truck size change how much material I need?
The capacity changes the rounded number of trips and their quoted fees. The geometric excavation and material conversion volumes remain the same.
Why does changing the survey grid change the estimate?
Closely spaced measurements may expose a ridge or depression between the previous measurements. This model represents each survey cell by two planar triangles under its stated diagonal convention.
What costs can I compare?
Copy scope costs from your quotes as rates per bank, compacted or loose yard, whole-trip costs and a fixed amount. Enter zero on a line already charged elsewhere.
Similar Calculators
Floor-Leveling Compound Depth & Bag Planner
Estimate self-leveling compound from measured floor elevations. Compare finish heights, buildup limits, geometric volume, whole bags and material costs.
Driveway Cost & Material Planner
Compare driveway costs from measured areas, pavement layers, excavation and supplier quotes. Plan material orders, truck loads, missing prices and budget headroom.
Gravel & Crushed Stone Calculator
Estimate gravel and crushed stone for multiple sections. Compare bulk tons or yards with whole bags, including density, compaction, allowance and cost.
French Drain Material & Trench Quote Planner
Compare two French drain quotes. Calculate gravel net of the pipe, check fabric width and whole-roll cuts, and reconcile measured trench quantities.
