French Drain Material & Trench Quote Planner

Measure each straight run once, then compare two trench profiles and supplier quotes. Enter top and bottom trench widths, fill depth and pipe outside diameter to calculate excavated volume, placed gravel and the upper cap. Compare gravel order increments with usable fabric roll dimensions and see how those purchase quantities affect the quote.

Measured trench takeoff

Compare French drain materials and quotes

The example uses illustrative dimensions and prices. Enter measured sections and supplier quotes for your project.

Option A

$1,963.00

Complete quote for entered scope

Placed gravel
3.1394 yd³
Ordered gravel
3.5 yd³
Whole fabric rolls
1

Option B

$2,602.00

Complete quote for entered scope

Placed gravel
5.3616 yd³
Ordered gravel
6 yd³
Whole fabric rolls
2

Option A is $639.00 lower for the measured route.

Complete quote for Option A. Complete quote for Option B. Option A is $639.00 lower for the measured route.

Measured trench cross-sections

Both drawings use the same scale. The thin clearance line follows the shortest path from the pipe to a trench side.

  • Upper cap
  • Gravel
  • Pipe envelope
  • Fabric trace
Option A trench profile
Option A scaled trench, gravel, fabric and pipe cross-section
Trench depth
18 in
Gravel height
12 in
Bottom width
18 in
Top width
18 in
Side clearance
7 in clear
Above the pipe
6 in clear

Pipe is inside the entered gravel section.

Closed wrap needs 66 in of usable width.

Option B trench profile
Option B scaled trench, gravel, fabric and pipe cross-section
Trench depth
30 in
Gravel height
20 in
Bottom width
14 in
Top width
26 in
Side clearance
5.8446 in clear
Above the pipe
13 in clear

Pipe is inside the entered gravel section.

Closed wrap needs 82.7922 in of usable width.

Fabric roll cut plan

Each run needs one continuous cut. Pieces share a roll lengthwise. The plan treats the remaining strip across a cut's width as an offcut.

Option A fabric

Width fits. 66 in needed, 72 in available. 6 in crosswise offcut.

  1. Roll 1 · 60 of 60 ft

    Side yard 40 ft · Back yard 20 ft

    0 ft remains after cuts.

Option B fabric

Width fits. 82.7922 in needed, 84 in available. 1.2078 in crosswise offcut.

  1. Roll 1 · 40 of 50 ft

    Side yard 40 ft

    10 ft remains after cuts.

  2. Roll 2 · 20 of 50 ft

    Back yard 20 ft

    30 ft remains after cuts.

Measured route

Both options use these runs. Measure each straight run along the route. Enter the total extra length at both ends of a fabric cut.

60 ft total measured length

Run 1
Run 2
Edit Option A inputs
Trench and pipe

Widths describe a symmetric trench. Offset moves the pipe center toward either side.

Fabric and usable roll
Purchase rules and quoted prices

Enter 0 for continuous gravel purchases or for a price included in another line.

Edit Option B inputs
Trench and pipe

Widths describe a symmetric trench. Offset moves the pipe center toward either side.

Fabric and usable roll
Purchase rules and quoted prices

Enter 0 for continuous gravel purchases or for a price included in another line.

Show quantities and quote ledger

The excavated trench equals placed gravel, the pipe envelope and the upper cap. Purchased gravel includes additional material and order increments.

Measured volumes and entered line prices for both French drain options
Quantity or costOption AOption B
Excavated trench5 yd³9.2593 yd³
Net placed gravel3.1394 yd³5.3616 yd³
Pipe envelope0.1939 yd³0.1939 yd³
Upper cap1.6667 yd³3.7037 yd³
Gravel plus allowance3.4533 yd³5.8978 yd³
Purchased gravel3.5 yd³6 yd³
Ordered gravel$245.00$390.00
Measured pipe$240.00$240.00
Whole fabric rolls$78.00$172.00
Excavation$500.00$700.00
Installation$800.00$950.00
Other quoted costs$100.00$150.00
Complete quote$1,963.00$2,602.00

Option A measured by run

Side yard · 40 ft
3.3333 yd³ excavated · 2.0929 yd³ placed gravel · 0.1293 yd³ pipe envelope · 1.1111 yd³ upper cap
Back yard · 20 ft
1.6667 yd³ excavated · 1.0465 yd³ placed gravel · 0.0646 yd³ pipe envelope · 0.5556 yd³ upper cap

Option B measured by run

Side yard · 40 ft
6.1728 yd³ excavated · 3.5744 yd³ placed gravel · 0.1293 yd³ pipe envelope · 2.4691 yd³ upper cap
Back yard · 20 ft
3.0864 yd³ excavated · 1.7872 yd³ placed gravel · 0.0646 yd³ pipe envelope · 1.2346 yd³ upper cap

Export results

Show selectable CSV text

How to use this calculator

  1. Enter the measured length of each straight run. Add any longitudinal fabric allowance required at its ends.
  2. Enter bottom width, top width, full trench depth and the height filled with gravel. Measure the pipe's outside diameter, bedding and any offset.
  3. Choose an open U liner or a closed wrap. Enter usable roll dimensions and the gap allowed between consecutive cuts.
  4. Enter the aggregate order increment and both proposals' prices. Enter zero on a line when it is included elsewhere.
  5. Check the cross-sections, whole-roll assignments and cost ledger. Export the complete comparison and cut plan as CSV.

The Formula

The mathematical logic powering this calculation is:

The route has one to eight measured, nonoverlapping straight runs. Each option uses one symmetric cross-section across that route. Set b to bottom width, t to top width, H to full depth and h to the gravel height from the bottom. The gravel-top width is w = b + (t − b)h/H. Excavated area is (b + t)H/2 and the gravel envelope area is (b + w)h/2. Subtract πD²/4 for the circular envelope of the pipe's outside diameter D. The cap above the gravel is the area between those two trapezoids. Multiply each area by measured run length in inches and divide by 46,656 for cubic yards. Excavated volume equals net placed gravel, the pipe envelope and the upper cap.

Pipe bedding e is the vertical distance below the pipe's exterior. Its top is at e + D and its center is at e + D/2. At the center, the nearest side's perpendicular distance is [b/2 + k(e + D/2) − |x|] ÷ √(1 + k²), where k = (t − b)/(2H) and x is the pipe offset. The circle fits inside the entered gravel when its top is at or below h and its nearest side distance is at least D/2. The exact boundary represents contact. Equivalent squared inequalities in fixed decimal units control acceptance at the boundaries.

An open U liner follows the bottom and two stone-side lengths, b + 2√[h² + ((w − b)/2)²]. A closed wrap adds w and the entered crosswise lap. A continuous cut for each run adds the entered end allowance to measured length. The fabric stock calculation requires usable width at least as large as cut width, then finds the fewest whole rolls with the entered length and cut gap. Cuts share a roll lengthwise and the remaining width within a cut is an offcut. Each cut stays in one piece.

Apply the entered gravel percentage to placed gravel and round the total up once to the supplier increment. Enter 0 for a continuous purchase. Aggregate and pipe lines use the entered rates per cubic yard and foot. Fabric uses the entered price for each whole roll. Each line rounds to USD cents with halfway values rounded upward. Excavation, installation and other amounts come from the entered quotes. The cost comparison appears when both quotes are complete.

Enter dimensions, percentages and order increments to three decimals and USD rates or amounts to two. Route segments run from 0.001 to 2,000 ft each with up to 100 ft of fabric end allowance. Trench dimensions run from 0.001 to 240 in, pipe diameter to 120 in, roll width to 1,200 in and roll length to 4,000 ft. Extra gravel permits 0–100%, and the supplier increment 0–100 yd³. The model covers measured geometry, continuous liner cuts and quoted costs. Allow separately for corners, junctions, excavation beyond the measured section, and project-specific drainage and safety requirements.

Worked Example

If you input:

  • Measured route: 40 ft side yard and 20 ft back yard
  • Option A profile: 18 in bottom and top width, 18 in deep with 12 in of gravel and a 4 in OD pipe
  • Option B profile: 14 in bottom and 26 in top width, 30 in deep with 20 in of gravel and a 4 in OD pipe
  • Fabric and gravel purchase: 6 in lap, 72 in × 60 ft stock for A and 84 in × 50 ft stock for B. Enter 10% extra gravel in 0.5 yd³ increments.
  • Option A prices: $70 per yd³ gravel, $4 per ft pipe, $78 per roll, $500 excavation, $800 installation, $100 other
  • Option B prices: $65 per yd³ gravel, $4 per ft pipe, $86 per roll, $700 excavation, $950 installation, $150 other

Result:

Option A places about 3.1394 yd³ of gravel and buys 3.5 yd³ plus one fabric roll for a $1,963 complete quote. Option B places about 5.3616 yd³ and buys 6 yd³ plus two rolls for $2,602. The modeled price difference is $639 for that measured route.

Frequently Asked Questions

How much gravel goes in a French drain trench?

Use the area of the filled portion at its measured widths and height, then subtract the circular pipe envelope. Multiply by the measured length. The placed quantity differs from what you purchase after adding allowance and a supplier increment.

Should I enter the nominal or outside pipe diameter?

Enter outside diameter. It measures the envelope that displaces gravel and determines whether the modeled circle fits. A trade size printed on the pipe may describe a different dimension.

Why can a pipe intersect a tapered wall even if the width seems large enough?

The closest wall is reached along a perpendicular from the pipe's center. That shortest distance can be smaller than the horizontal space shown at the same height. The worksheet marks the actual signed side clearance.

What fabric dimensions should I compare?

Use the supplier's usable width and length. A closed wrap includes the top width and your crosswise lap. Each continuous cut also needs the full measured run length and its longitudinal end allowance.

Why does square footage underestimate the whole roll count?

Each cut must pass width and length separately, and pieces share a roll lengthwise. Three 40 ft pieces each fit a 60 ft roll, but two pieces cannot share one. Three rolls are needed under this cut plan.

How do I show that a contractor included an item at no extra cost?

Enter zero on that line. A blank price keeps the complete quote pending so it cannot be mistaken for included work. Use Other quoted costs for entered items such as haul-away or delivery.

Does this calculate slope or drainage performance?

Use dimensions from the measured design or proposal. The model estimates materials and entered costs; drainage capacity, grades, outlets, trench protection and project suitability require separate evaluation.

Similar Calculators