Air Duct Cleaning Cost & Scope Quote Calculator
Enter supply registers, return grilles and requested HVAC components for each system. Compare two written quotes using their per-system allowances and job minimums. Examine how each quote prices supply and return extras, trunk and plenum work, the air handler, cooling coil and drain pan. A price comparison is available when both bids cover the full entered scope.
Compare duct cleaning bids on the same scope
Match each written bid against the same registers, grilles and HVAC components.
Quote A needs written scope prices before comparison.
Quote A
$552.00
Priced work only · 1 requested item unpriced
Quote B
$590.00
Full requested scope priced
Edit HVAC systems and written bids
Enter each system separately. Both bids share the same inventory. Select the work you want each bid to cover.
Allowances restart for every system. Leave an extra register or grille price blank if the written bid has no price. Enter 0 for a confirmed zero charge.
Written scope by HVAC system
- In base
- Priced extra
- Unpriced
Quote A · System 1
Supply registers · 12 requested
8 in base · 4 priced extra
Return grilles · 2 requested
1 in base · 1 priced extra
Trunks and plenums · 1 requested
1 in base
Air handler and blower · 1 requested
1 in base
Cooling coil · 1 requested
1 priced extra
Drain pan · 1 requested
1 unpriced
Quote B · System 1
Supply registers · 12 requested
12 in base
Return grilles · 2 requested
2 in base
Trunks and plenums · 1 requested
1 in base
Air handler and blower · 1 requested
1 in base
Cooling coil · 1 requested
1 in base
Drain pan · 1 requested
1 in base
Where the priced totals come from
Bars share a dollar scale. Read each scope status alongside its priced work.
Quote A
- System base charges
- $350.00
- Additional supply registers
- $72.00
- Additional return grilles
- $25.00
- Separate component charges
- $75.00
- Other job charges
- $30.00
- Minimum-charge adjustment
- $0.00
Quote B
- System base charges
- $470.00
- Additional supply registers
- $0.00
- Additional return grilles
- $0.00
- Separate component charges
- $0.00
- Other job charges
- $45.00
- Minimum-charge adjustment
- $75.00
Show scope comparison CSV text
How to use this calculator
- Count supply registers and return grilles for each system. Select the duct and equipment work to include in the requested scope.
- Enter the base per system, allowance by opening type, written extra rates and other job terms for both bids.
- Mark each selected component as included, separately priced or unpriced based on the written quote.
- Use the system scope map to identify what needs a price. Compare the modeled totals when both bids cover the full requested scope.
The Formula
The mathematical logic powering this calculation is:
Compare both written bids against one inventory of up to three HVAC systems. Each bid uses a uniform price schedule across the entered systems. Enter supply registers and return grilles separately. Select only the component work you want both bids to price for each system. The trunk and plenum row covers both the supply and return side work described in the bid. Mark a component unpriced when the written terms leave its entered scope unresolved.
For each system and opening type, included count is the smaller of the requested count and the bid allowance. The allowance starts fresh for every system. A written extras rate, including zero, prices the entire balance for that opening type. With the rate blank, every unit beyond the allowance remains unpriced. For each selected component, the bid either includes it in the base, prices it separately per selected system, or leaves it unpriced. Components outside the requested scope carry no charge.
Multiply the base by the number of systems. Add priced supply and return extras, separately priced components and other written job charges. The modeled amount is the larger of this sum and the bid's entered job minimum. Any remaining unpriced work is identified in the scope map and the total is labeled as priced work only. Compare prices only when both quotes price every requested item. Count limits are 0–500 per type per system, and entered prices range from $0 to $100,000 with cents. All amounts are evaluated in integer cents.
The worksheet compares written prices for user-selected work. It assumes the same units and requested services across quotes. Enter the final written terms, including applicable fixed fees, or obtain revised prices when terms depend on a method or quantity outside these fields. The examples use illustrative prices.Method sources
Worked Example
If you input:
- System 1: 12 supply registers, 2 return grilles, trunks and plenums, handler and blower, coil, and pan
- System 2: 4 supply registers, 1 return grille, trunks and plenums, and handler and blower
- Quote A: $175 per system. Includes 8 supplies and 1 return per system. Separately prices the coil. Pan price pending.
- Quote B: $235 per system. Inventory fits its allowances. All selected equipment work is included. $590 job minimum.
Result:
A has $552.00 of priced work and its drain pan is unpriced. B prices the entire entered scope for $590.00. If A confirms $35.00 for the pan, it prices the same scope for $587.00.
Frequently Asked Questions
Do unused register allowances transfer between systems?
This worksheet uses a fresh allowance for each system. Enter quotes with per-system allowances or obtain corresponding rates for this scope.
What should I enter when a quote says extra grilles are free?
Enter an explicit zero extra rate if the written quote covers every additional unit at that rate. Use a blank for a missing rate.
Can equipment be priced separately on one system only?
Select the component on the system where the service is requested. A bid's separate component rate applies once for each selected system.
Why do the bids need more prices before comparison?
At least one requested item is still unpriced. Read the system scope map for the exact quantities and components that need written terms.
How does the job minimum apply?
The amount shown is the higher of the entered minimum and the sum of modeled charges. If work is unpriced, the amount describes the priced scope shown.
Similar Calculators
Ductwork Replacement Cost & Takeoff Calculator
Estimate ductwork replacement from measured round and rectangular runs. Compare two quotes by included scope, sheet surface, fittings, installation and removal.
HVAC Duct Pressure & Airflow Planner
Compare round and rectangular duct paths at a prescribed airflow. Visualize pressure losses, check entered pressure and velocity preferences, and export energy estimates.
HVAC Replacement & Operating Cost Planner
Compare HVAC replacement quotes, annual heating and cooling costs, maintenance and dated repairs. Visualize nominal and discounted costs, savings and payback reversals.
House Cleaning Visit & Contract Quote Planner
Compare house cleaning costs for the first deep clean, recurring visits, appliance extras and written skip or return fees.