UPS Battery Backup Calculator & Runtime Curve Audit

Check each quoted backup against both nameplate output ratings, then compare runtime at your steady on-battery load. Interpolate only within the manufacturer's curve for the exact UPS and battery configuration.

UPS runtime comparison

Compare UPS runtime and output ratings

UPS A has the lower qualifying quote.

UPS A · $290.00

20.00 min

Interpolated between samples · Exactly at runtime target

Meets the entered ratings and runtime checks.

UPS B · $450.00

36.25 min

Interpolated between samples · 16.25 min above target

Meets the entered ratings and runtime checks.

Edit measured load and target

Use steady on-battery watts for the runtime curve and the largest measured W and VA for separate rating checks.

Edit UPS A quote and curve

Use one battery configuration and enter source points from lowest to highest watts.

UPS A point 1
UPS A point 2
UPS A point 3
Edit UPS B quote and curve

Use one battery configuration and enter source points from lowest to highest watts.

UPS B point 1
UPS B point 2
UPS B point 3

Runtime by steady load

  • UPS A
  • UPS B
  • Runtime target
Entered UPS runtime curves and the interpolated values at the steady loadThe vertical dashed line is the steady load. Large rings mark interpolated or known times. Each curve ends at the last available sample.0 min27.5 min55 min0 W700 W

Steady load 300 W · target 20.00 min. Rings show estimates within the entered samples.

UPS A highest plotted whole W at target
300 W
UPS B highest plotted whole W at target
530 W

Peak load against output ratings

Each bar is measured peak demand as a share of that rating. The dashed line marks 100%.

Separate peak watts and volt-amperes compared with each UPS ratingBars to the right of the rating line exceed the corresponding output limit.A · WA · VAB · WB · VA0%Dashed · 100% of rating
UPS A · 550 / 600 W
50 W headroom
UPS A · 700 / 700 VA
At VA rating
UPS B · 550 / 800 W
250 W headroom
UPS B · 700 / 1,000 VA
300 VA headroom

Show UPS comparison CSV text

How to use this calculator

  1. Enter steady on-battery watts, both measured peak values, and the amount of backup time needed.
  2. Copy both candidates’ output ratings, installed quotes and runtime data for the confirmed battery configuration.
  3. Check the W and VA margins and inspect each curve at the steady load and target. Add source points if the chart does not bracket the load.
  4. Download the itemized rating checks, runtime evidence and source curve values.

The Formula

The mathematical logic powering this calculation is:

Use the steady on-battery watts and separate maximum measured watts and volt-amperes from the intended supported equipment. The W and VA maximums must cover the steady operating load. For each candidate, enter on-battery output ratings and a written quote for the full UPS and battery configuration. Add two to five ordered W-and-runtime pairs for that same configuration from the manufacturer’s data or a controlled qualifying test. Loads must rise strictly and runtime can stay level or fall.

Subtract measured maximum W and VA separately from the corresponding ratings. Exact equality meets the entered numerical check. Check the runtime separately at the entered steady watts. At an entered sample, use its runtime. Between adjacent samples, use straight-line interpolation weighted by distance on the W axis. Loads outside that interval need more source data. Compare the unrounded interpolated runtime with the target. To find the highest checked whole-watt load meeting the runtime target, locate the last point at or above the target, then interpolate toward the next point if necessary. Stop at the final entered point when it remains at or above target. That runtime threshold does not include the separate VA check.

A configuration qualifies for the quote comparison only when both ratings and the steady runtime meet their entered thresholds. A backup meeting both ratings but missing curve coverage remains unresolved in the comparison. Quoted prices use exact cents. Load and ratings accept whole units, with 1–20,000 W and 1–30,000 VA supported. Time accepts 0.01–1,800 minutes with up to two decimal places. Published runtime depends on the battery configuration, charge, age, test conditions and actual load. Verify equipment compatibility and manufacturer requirements for the installation.

Worked Example

If you input:

  • Measured demand: 300 W steady, 550 W and 700 VA maximum. Runtime target 20 minutes.
  • UPS A: 600 W, 700 VA, $290. Samples at 120, 360 and 600 W.
  • UPS B: 800 W, 1,000 VA, $450. Samples at 120, 360 and 700 W.

Result:

At 300 W, UPS A interpolates to exactly 20.00 minutes and its VA rating exactly meets measured maximum VA. Both setups qualify. At 301 W, UPS A interpolates to 19.90 minutes and only UPS B qualifies.

Frequently Asked Questions

Why enter both watts and volt-amperes?

Watts measure real power and VA measures apparent power. Equipment can meet one output rating and exceed the other, so the worksheet checks both independently.

Which load should I use for the runtime estimate?

Use the steady watts expected while on battery for the equipment you intend to support. Enter the maximum W and VA separately for the rating checks.

Can I use points from a similar UPS?

Use the curve from the exact UPS and battery configuration in the quote. A similar model or a different number of battery packs can have a different runtime.

What happens outside the curve points I entered?

The result marks runtime as unresolved. Add verified data points that bracket the load before using it in the runtime comparison.

Why does the highest plotted whole W differ from nameplate capacity?

The rating sets an output limit. The plotted value is based on how much steady load reaches the chosen runtime within the available curve. Both criteria remain relevant.

Why might the display show 20.00 minutes below a 20-minute target?

The displayed value rounds to hundredths. The comparison uses the unrounded interpolation and the CSV includes its exact fraction in hundredths of a minute.

Similar Calculators