Lawn Topdressing Quantity & Stock Allocation

Enter measured areas, your own layer depths and material on hand. Compare equal progress toward each zone’s selected depth with filling zones in priority order. See which zones reach their minimum and what an order to reach all target depths would cost.

Lawn material and pack quotes

Plan topdressing across lawn zones

Quote A costs less to reach all target depths.
Combined minimum
180 L
Existing stock covers the minima
More stock to reach targets
280 L
520 L combined target
Compare allocated depths by zone

The two bars show how far existing stock goes. The solid marker is the minimum and the dashed marker is the target.

Front lawn

Minimum 1 mm · Target 3 mm

Equal progress
1.3529 mm
Zone order
1.75 mm

Side lawn

Minimum 1 mm · Target 4 mm

Equal progress
1.5294 mm
Zone order
1 mm

Back lawn

Minimum 2 mm · Target 4 mm

Equal progress
2.3529 mm
Zone order
2 mm
Measured zones and depths

Rows at the top receive stock first in each stage of the zone-order allocation.

Zone 1
Zone 2
Zone 3
Quote A
Delivered total
$60.50
7 packs · 0 L left over
Quote B
Delivered total
$61.75
5 packs · 20 L left over
Review the zone ledger and exact CSV
Litres required and assigned to each zone
ZoneMinimumTargetEqual progressZone order
Front lawn80 L240 L108.2353 L140 L
Side lawn40 L160 L61.1765 L40 L
Back lawn60 L120 L70.5882 L60 L

How to use this calculator

  1. Divide the measured lawn into non-overlapping zones. Enter each area and its chosen minimum and target depths.
  2. Enter the litres of the same material already available. The row order sets which zones receive stock first in the priority allocation.
  3. Use the depth chart to compare stock allocations against each zone’s minimum and target.
  4. Enter comparable pack size, price and delivery from both quotes. Review pack counts and cost to reach every target, then download the exact ledger.

The Formula

The mathematical logic powering this calculation is:

For a uniform layer, volume in litres equals non-overlapping area in square metres times depth in millimetres. One square metre times one millimetre is 0.001 cubic metres, or one litre. Compute each zone’s minimum and target volumes separately. When available stock is below the combined minimum, all stock goes toward the minima. Once the combined minimum is covered, remaining stock goes toward the increments from minimum to target.
In the equal-progress allocation, each zone receives the same fraction of its own required volume in each stage, capped at 100%. In the priority allocation, each stage fills the zones in worksheet order until its available volume runs out. The first stage always precedes the second. Both allocations use up to the combined target volume. Allocated depth equals allocated litres divided by the zone area.
For each written quote, divide the positive target shortfall by litres per pack and round up to a whole pack. Cost equals packs times entered price plus delivery if at least one pack is needed. Purchased volume above the target shortfall stays unused. Existing stock above the combined target also stays unused.
Use one to six zones, areas from 0.01 to 10,000 m² and entered depths from 0 through 100 mm. Stock is 0–1,000,000 L and pack size is 1–100,000 L. Enter unsigned decimals with up to two places. Prices and delivery use USD with up to two decimal places and a maximum of $1,000,000 per entry. The worksheet assumes one uniform material and comparable quotes. Enter depth and measured stock on the same volume basis. Material suitability, field settlement, spreader settings, taxes beyond the entered prices and overlap correction are outside the model. The CSV retains exact fractions before display rounding.

Worked Example

If you input:

  • Lawn areas: 80, 40 and 30 m²
  • Minimum depths: 1, 1 and 2 mm
  • Target depths: 3, 4 and 4 mm
  • Existing stock: 240 L
  • Quote A: 40 L packs at $6.50 plus $15.00 delivery
  • Quote B: 60 L packs at $8.25 plus $20.50 delivery

Result:

Targets use 520 L, leaving 280 L to purchase. Seven packs from Quote A cost $60.50 delivered. At 280 L of initial stock, Quote B becomes cheaper at $53.50.

Frequently Asked Questions

How much area does a 40 L bag cover?

At a uniform 2 mm layer, 40 L covers 20 m². Change the area and entered depths to model your own zone.

What if I want to reach the same share of each minimum?

Check the equal-progress allocation. If stock covers half of the combined minimum volume, each zone receives half of its own minimum depth.

Does priority fill the first zone all the way to target first?

The priority allocation reaches the minimum in each zone before using any stock above minimum. Within each stage, zones receive stock in worksheet order.

What if I already have enough material?

Both orders show zero packs and zero delivery cost. Stock beyond the target volume stays unused.

Similar Calculators