Sod Installation Cost & Haul-Off Quote Planner

Compare two installed sod prices for the same area and written scope. Enter the measured areas for new sod, old turf removal and topsoil placement. The chart shows how different disposal allowances and whole-load fees can change the lower quote as removal depth changes.

Installed sod bids

Compare installation quotes by haul-off depth

Match the sod and site work, then check when extra billed loads change the price.

Quote B is $181.13 lower at 1.2 in.

4 yd³ loose haul-off and 1.2346 yd³ of placed topsoil.

Quote A
$2,066.67
Complete quote2 extra billed loads
Quote B
$1,885.54
Complete quote0 extra billed loads
Measured lawn scope
Quote A written terms

Enter ? for an unquoted amount, or 0 for a charge confirmed included.

Quote B written terms

Enter ? for an unquoted amount, or 0 for a charge confirmed included.

Installation cost by removal depth

Each step is a change in billed cost. A missing line indicates an incomplete quote at that depth.
$2,486.67 at top$0.00 at bottom
0 in3 in
Quote A · solidQuote B · dashed
Open lower-quote depth ranges
  • 0 in to 0.45 inQuote A lower
  • 0.46 in to 2.1 inQuote B lower
  • 2.11 in to 2.25 inQuote A lower
  • 2.26 in to 3 inQuote B lower
Open itemized installation ledger
ChargeQuote AQuote B
Installed sod$1,260.00$1,572.00
Site grading$0.00$0.00
Mobilization$150.00$75.00
Old turf removal$270.00$162.00
Topsoil supply$66.67$76.54
Topsoil delivery$40.00$0.00
Haul-off above allowance$280.00$0.00
Open selectable CSV

How to use this calculator

  1. Enter the measured sod, removal and topsoil placement areas and the quote-specific depth assumptions.
  2. Enter the installed sod, grading, stripping and soil rates for both providers. Use 0 only for a confirmed included charge and ? for an unquoted term.
  3. Copy the included disposal volume, quoted load capacity and overflow fee. Check each provider's written scope.
  4. Compare the selected-depth costs, then inspect the cost chart and export the line-item ledger if needed.

The Formula

The mathematical logic powering this calculation is:

Use the same sod type, coverage and written prep scope for each quote. The installed sod and grading prices apply to the installed square feet. The stripping charge applies to the removal square feet when removal depth is greater than zero. Topsoil volume in cubic yards equals its placement area in square feet × depth in inches ÷ 324. Apply the entered rate to this placed volume if that is the provider's billing basis. The separate soil delivery line applies if placed volume is positive. Add the entered mobilization once.

Loose haul-off volume in cubic yards equals removed area × removal depth ÷ 324 × (1 + the entered loose-volume increase percent ÷ 100). This estimate uses only your measured area, depth and allowance. Where disposal is billed in whole loads, subtract the included cubic yards from the loose volume with a floor of zero. Extra load count is that excess divided by the quoted billed volume per load, rounded upward to a whole load. A volume equal to the allowance has zero overflow. An exact multiple of the load volume does not require another load. Multiply extra loads by the quoted fee. The number represents a quote unit, independent of the actual truck, legal weight or physical transport plan.

Use 0 when a charge is confirmed included or free. Use ? when a rate, allowance or load capacity is unquoted. A confirmed zero overflow rate keeps the charge at zero even when the load count is unknown. Confirm the written included scope and whether the same provider covers any overflow. A scope gap or unpriced active charge prevents a complete total. Dormant charges on zero quantities contribute zero. Rounded line items add to the quote cost, with each USD line rounded half up to cents. The author-entered figures are needed for the arithmetic. No market prices, soil requirement, disposal acceptance or truck safety limit is inferred.

The depth chart evaluates each supported hundredth-inch value from zero through the entered maximum. The selected depth must fit that range. Removal and soil areas cannot exceed installed area. Removal depths accept 0–6 inches, soil depth 0–12 inches and measured areas through 20,000 ft². Loose-volume increases accept 0–100%. Overflow capacity needs a positive entered value of at least 0.1 yd³ if known. All numeric drafts may use up to two decimals. The chart only ranks two complete, matched-scope quotes.

Worked Example

If you input:

  • Lawn: 1,200 ft² installed; 900 ft² stripped at 1.2 in; 20% loose-volume increase.
  • Topsoil: 200 ft² at 2 in placed depth.
  • Quote A haul-off: 1.5 yd³ included; 2 yd³ per overflow load at $140.
  • Quote B haul-off: 4 yd³ included; 3 yd³ per overflow load at $180.

Result:

There are 4 yd³ of loose material. Quote A bills two extra loads and totals $2,066.67. Quote B includes the measured volume and totals $1,885.54, $181.13 less at 1.2 in.

Frequently Asked Questions

What is the difference between placed soil and loose haul-off?

Placed soil is the volume in the entered placement area and depth. Hauled material uses the separate removal measurements and your entered increase for loose material.

Why do a few extra inches change the price in steps?

The worksheet uses whole quote loads. Each time the excess passes another full load, the next charged load begins.

What if a quote already includes topsoil or removal?

Use a confirmed zero for separately modeled work already included in another quoted charge. Check that both quotes cover the work requested.

How should a missing overflow term be entered?

Use ? for a missing amount and unconfirmed for unconfirmed coverage. A fully known price is available only for documented matching scope and complete active prices.

Does this work out an actual legal load limit?

Load capacity refers to the quote's billing unit. Transport and facility limits require confirmation from the provider.