Sloped-Bottom Tank Volume & Stage Calculator
Use the surveyed inside section of a constant-width tank with two straight floor runs. Compare how much liquid sits at each measured elevation, where water first reaches the next part of the floor, and whether each level contains the volume you entered.
Compare measured tank levels
Calculate how much liquid sits above two surveyed floor runs and check each level against your minimum.
Edit geometry, levels and minimum
Use horizontal run lengths and elevations above one shared datum.
Only level B meets the minimum volume.
Tank inventory
- Modeled capacity to top
- 11.8 m³
- Level B minus level A
- +1.8 m³
- Entered minimum
- 2.4 m³
Level A · 0.3 m
0.6 m³
Below the minimum
- Signed volume margin
- −1.8 m³
- Capacity filled
- 5.0847 %
Level B · 0.6 m
2.4 m³
Exactly at the minimum
- Signed volume margin
- 0 m³
- Capacity filled
- 20.339 %
Inspect the tank section and volume curve
Longitudinal tank section
Elevation (m) by horizontal station (m)
Elevation axis 0 m to 1.6 m
Solid floor line, shaded liquid, dashed level B surface
Level B · 0.6 m
- Total wetted length
- 4 m
- Total liquid volume
- 2.4 m³
Run 1
- Wetted stations
- 0 m to 3 m
- Liquid volume
- 1.8 m³
Run 2
- Wetted stations
- 3 m to 4 m
- Liquid volume
- 0.6 m³
Review the exact tank-volume ledger
Wet start and end stations are relative to each run’s start. Exact fractions preserve the entered precision.
| Level | Floor run | Wetted start (m) | Wetted end (m) | Wetted length (m) | Section area (m²) | Liquid volume (m³) |
|---|---|---|---|---|---|---|
| A | 1 | 3/2 | 3 | 3/2 | 9/40 | 9/20 |
| A | 2 | 0 | 1/2 | 1/2 | 3/40 | 3/20 |
| B | 1 | 0 | 3 | 3 | 9/10 | 9/5 |
| B | 2 | 0 | 1 | 1 | 3/10 | 3/5 |
How to use this calculator
- Choose a datum at or below all floor and liquid levels. Enter the inside width and the two horizontal distances to and from the point where the floor changes slope.
- Enter the three floor elevations and a top elevation from the same datum.
- Compare two measured liquid levels against your minimum inventory in cubic meters.
- Switch between the section and stage-volume curve. Inspect each level, then open the ledger to export exact geometry and volumes.
The Formula
The mathematical logic powering this calculation is:
Use one vertical datum for all floor, liquid and top elevations. The tank plan is rectangular with constant inside width W and vertical walls. Two straight floor profiles join at a single station. The two span lengths are their horizontal distances. A flat span is allowed. The liquid surface is level.
For a floor run of horizontal length L with endpoint elevations z₀ and z₁, depth is max(0, H − z(x)), where z(x) is the line between the two floor measurements and H is the entered liquid elevation. If H is at or below both floor ends, that span contributes zero. If H reaches or exceeds both floor ends, its full horizontal length contributes. For a partial span, solve x = L × (H − z₀)/(z₁ − z₀) and use the part on the lower side of the crossing.
A wet span with length ℓ and depths d₀ and d₁ at its ends has section area ℓ × (d₀ + d₁)/2 and volume W times that area. The dry part is excluded before applying this average, so the rule also handles a triangular wedge. Add both span volumes. Repeat at the top elevation for modeled capacity. Level B minus level A is the signed change. A level meets the target when its combined volume is at least the entered minimum. Exact rational comparisons resolve equality before display rounding.
Enter metric lengths from 0.000001 to 1,000 m and elevations from 0 to 1,000 m, with up to six decimals. The top must be above every floor point, and each liquid level can be at or below the top. Minimum volume can range from 0 to 2,000,000,000 m³. When a center ridge separates two pools, any reported total assumes the entered surface elevation is valid in both pockets. Use this geometric model for a documented shape and observed levels. It excludes internal fixtures, wall taper, leakage, independent levels in separate pools and certification of tank capacity.Worked Example
If you input:
- Inside width and horizontal runs: 2 m wide with runs of 3 m and 2 m
- Floor and top elevations: Left 0.6 m, joint 0 m, right 1.2 m, top 1.6 m
- Liquid levels and minimum: A 0.3 m, B 0.6 m, minimum 2.4 m³
Result:
Level A holds 0.6 m³ over 2 m of the floor. Level B holds exactly 2.4 m³ over 4 m and reaches the first run’s high end. The modeled capacity to the top is 11.8 m³. A level of 0.599999 m falls below the 2.4 m³ minimum.
Frequently Asked Questions
Which distances do I use for the two floor runs?
Use horizontal distances between the floor stations. A tape measurement along an inclined floor is longer than its horizontal projection.
What is a stage-volume curve?
It shows how modeled liquid volume changes with the elevation of the surface above the datum. A slope change or dry floor can change how quickly volume rises.
How does the calculator handle a dry end?
It solves the point where the liquid surface meets the floor, then calculates volume only over the wetted portion.
Can I use a flat floor?
Yes. Enter the same elevation at all three floor positions for a level floor.
What if the center of the floor is higher than the ends?
At lower stages the tank can have two separated pockets. The displayed total uses one common level for the modeled comparison. Confirm it separately for each pocket before interpreting the total.
Can I use the modeled top as an operating fill limit?
Use the top as a geometric reference. Operating limits depend on the tank documentation, installation and fluid.
Similar Calculators
Tank Volume & Dip Chart Calculator
Find tank volume from liquid depth or solve depth from volume. Compare fill levels and export dip charts for horizontal cylinders, upright cylinders and boxes.
Polygon Area Calculator
Calculate polygon area from ordered coordinates, subtract cutouts, and inspect perimeter, centroid and point location on a consistently scaled plan.
Cone & Frustum Capacity Calculator
Compare cone, frustum and cylinder capacity, liquid depth and surface areas. Inspect fill curves, solve target-volume depth and explore ideal sector or rectangle development.