Slab Leak Repair Cost & Finish Quote Audit
Compare a spot-access quote with a reroute for the same confirmed leak. Estimate the finish component from each proposal’s measured, coplanar restoration windows, count their overlap once, and keep incomplete finish prices visible before comparing totals.
Compare slab leak repair and finish quotes
Reconcile base repair charges, finish overlap and the minimum amounts billed.
Edit written quotes and finish rectangles
Measure from one upper-left datum on a single plane per quote. Include comparable repair and access scope in the base charges.
The complete entered totals are equal.
Spot access
$3,000.00
- Base repair
- $2,400.00
- Unique finish footprint
- 20 ft²
- Overlap removed
- 4 ft²
- Finish charge
- $600.00
- Billed area
- 20 ft²
Reroute
$3,000.00
- Base repair
- $2,850.00
- Unique finish footprint
- 4 ft²
- Overlap removed
- 0 ft²
- Finish charge
- $150.00
- Billed area
- 5 ft²
Difference between totals $0.00
Inspect a documented finish footprint
Floor finish plan
20 ft² unique
- Finish footprint
- Overlap counted once
- Selected rectangle
Spot access · Separate finish price
Rectangle 1 · 12 ft²
Offsets 0 ft across · 0 ft down
Dimensions 4 ft wide · 3 ft long
Entered rectangle sum 24 ft²
Unique footprint 20 ft²
Overlap removed 4 ft²
Review the exact slab leak quote ledger
| Quote | Entered (ft²) | Unique (ft²) | Overlap removed (ft²) | Billed (ft²) | Base repair | Finish charge | Complete total |
|---|---|---|---|---|---|---|---|
| Spot access | 24 | 20 | 4 | 20 | $2,400.00 | $600.00 | $3,000.00 |
| Reroute | 4 | 4 | 0 | 5 | $2,850.00 | $150.00 | $3,000.00 |
How to use this calculator
- Enter comparable written base charges for the spot-access and reroute proposals.
- Mark whether finish restoration is included, separately priced or pending for each quote.
- Enter the finish rectangles on one floor or wall plane, using coordinates from the same local datum within that quote.
- If priced separately, enter the written rate and minimum billed area. Verify that the base excludes that separate charge.
- Compare the totals, inspect the mapped overlap and export the quote ledger.
The Formula
The mathematical logic powering this calculation is:
For each quote, enter the base repair charge and up to three documented finish-restoration rectangles. Use feet and one coordinate datum on a single floor or a single wall plane per quote. Width and length follow the two directions on that plane. A patch’s area is width times length. Sort the x and y edges and divide the footprint into rectangles along those coordinates. The unique area is the sum of cells covered by at least one patch. Removed overlap is the sum of entered patch areas minus the unique area, including multiple repeat coverage of the same portion.
For separately priced finish, billed area is the larger of the unique area and the documented minimum. The separate finish charge is billed area times the entered rate, rounded to cents once, half up. Add that charge to the base for the comparison. Use Included when the base explicitly covers the finish, so no separate charge applies. A pending finish scope leaves the complete total and price conclusion open. The displayed difference is between the complete entered totals in USD. Exact equality after rounding is a tie.
Enter comparable written scopes for the same confirmed problem. Include known repair and access charges in base. Use the finish fields only for one documented rate on a single coplanar set of surface restoration areas. Separate non-coplanar repairs or differently priced finish work belong in the written quote outside those fields. Coordinates and sides accept 0–1,000 ft, with sides positive, and the minimum accepts 0–1,000,000 ft². Area-related inputs allow four decimal places. Base accepts 0–1,000,000 USD and rate 0–10,000 USD/ft², each with two decimal places. A separately priced finish needs one to three recorded rectangles. Included or pending finish also permits zero.
Values are illustrative estimates of entered scope. The footprint models finish work from a proposal. It does not locate leaks, establish average repair prices, assess replacement feasibility, describe excavation, model structural work or determine insurance coverage.Worked Example
If you input:
- Spot access quote: USD 2,400 base. Two 4 × 3 ft floor patches overlap by 4 ft². Finish is USD 30/ft² with a 10 ft² minimum.
- Reroute quote: USD 2,850 base. One 2 × 2 ft wall patch. Finish is USD 30/ft² with a 5 ft² minimum.
Result:
Spot access bills 20 ft² of finish for USD 600. The reroute bills its 5 ft² minimum for USD 150. Both complete totals equal USD 3,000.
Frequently Asked Questions
Why can the restoration rectangles overlap?
A proposed opening and its finish patch can cover some of the same area. Use their documented extents on one plane. The shared part is billed once in this model.
Why is charged area greater than the footprint?
A separately priced quote may specify a minimum billed area. The physical footprint stays the same while the charge uses the larger amount.
What if the written quote includes finish work?
Choose Included for those confirmed terms. The base is then the complete modeled price for that option.
How should I compare different wall and floor materials?
Each quote can have its own plane and rate. For several differently priced surfaces in one proposal, include the other established amounts in that quote’s base and keep the measured patch set on one plane.
Does the lower total identify the right repair?
It identifies the lower complete entered price. Repair suitability and any site-specific constraints require the contractor’s assessment.
Similar Calculators
House Repipe Route, Stock & Quote Planner
Compare house repiping costs by mapping fixture runs, calculating whole PEX coils and checking which labor and restoration charges each quote includes.
Sewer Replacement Cost & Surface Planner
Compare sewer replacement costs across pipe work, access patches and surface restoration. Visualize cost ranges, footprints, budget headroom and price crossovers.
Water Damage Repair Cost Planner
Compare water damage repair quotes from measured scope and supplied equipment durations. Audit unpriced work, rental minimums, hourly billing and budget gaps.
Concrete Demolition Cost Calculator & Haul Quote Comparison
Compare two written concrete removal bids. Estimate in-place and loose volumes, count haul loads by both limits, and locate thickness points where costs jump.
