Concrete Demolition Cost Calculator & Haul Quote Comparison
A slightly thicker slab can require another load. Enter the measured slab area, an intact density and loose volume ratio, then compare each bid’s written removal, hauling and disposal terms. See quoted totals and whole loads at your chosen thickness and across a bounded range.
Compare concrete demolition and hauling quotes
Check the removal bill and see where slab thickness adds a truckload.
Slab measurements
6 yd³ intact · 9 yd³ loose · 12.15 US tons
Quoted cost by slab thickness
Vertical steps show where a thicker slab moves the quote to one more load.
- Quote A
- Quote B
Review settled quote lines and exact CSV
Quote A
2 by loose volume · 3 by payload
- Removal labor
- $729.00
- Fixed charges
- $100.00
- Hauling
- $780.00
- Disposal
- $510.30
Quote B
1 by loose volume · 2 by payload
- Removal labor
- $858.60
- Fixed charges
- $0.00
- Hauling
- $710.00
- Disposal
- $425.25
How to use this calculator
- Set the measured total slab area and thickness range with a selected thickness.
- Enter the intact concrete density and loose-to-intact ratio applicable to the debris. Keep the two states distinct.
- Enter the usable capacity and accepted concrete payload for each written bid, plus the separate removal, haul and disposal prices.
- Switch the chart between cost and loads, and inspect the exact next boundary. Review and export the quote breakdown.
The Formula
The mathematical logic powering this calculation is:
Intact volume in cubic yards equals area in square feet times thickness in inches divided by 324. Loose volume equals intact volume times the entered loose-to-intact ratio. Estimated US short tons equal area times thickness times entered intact density divided by 24,000. The ratio changes volume while the entered intact density gives the same mass.
Divide loose cubic yards by the confirmed usable volume per load and round up. Separately divide short tons by the accepted concrete payload and round up. The larger count is the minimum number of equal loads for divisible material within the entered capacities. If both rounded counts agree, the ledger shows both. A thickness exactly on a governing boundary stays at the lower number of loads. A larger thickness takes another load.
Each written quote total is area labor, fixed charges, per-load hauling and disposal. Disposal equals the larger of the stated job-level minimum and concrete short tons times the entered rate. Round each line once to cents, half up. For each bid the chart shows exact load changes when there are at most 64 changes in the entered range. Wider ranges plot 17 evenly spaced samples. The selected estimate and next in-range haul boundary still use exact arithmetic. Between plotted observations the drawn segments illustrate the price trend.
Limits: 1–100,000 ft²; 0.1–36 in; 1–300 lb/ft³; 1–4 for loose-to-intact ratio; 0.1–100 yd³ or US short tons per load. Confirm comparable written scope, actual accepted loads and loose volume assumptions with the service provider. The worksheet covers one uniform slab footprint and the entered work charges. Cutting and removal method, work feasibility, permits, other material and vehicle limits require separate confirmation.Worked Example
If you input:
- Slab: 324 ft², 6 in selected of 4–8 in, 150 lb/ft³ intact, loose ratio 1.5.
- Quote A: 6 yd³, 6 US tons, $2.25/ft² labor, $100 fixed, $260 per haul, $42/ton, $300 disposal floor.
- Quote B: 9 yd³, 9 US tons, $2.65/ft² labor, $0 fixed, $355 per haul, $35/ton, $275 disposal floor.
Result:
The slab gives 6 yd³ intact, 9 yd³ loose and 12.15 US short tons. Quote A needs three loads and totals $2,119.30. Quote B needs two loads and totals $1,993.85.
Frequently Asked Questions
Why are the intact and loose volumes different?
The intact estimate comes from the slab measurements. The entered loose ratio accounts for the arrangement of broken pieces and spaces between them. Use a ratio appropriate to the service provider’s expected material.
Does the planner use the nominal truck size?
Use the provider's usable concrete volume and accepted concrete payload, which are independent of the truck's advertised capacity.
Can the cheapest quote change across the range?
Yes. A whole-load threshold changes hauling charges. Different labor and disposal rates can also affect the comparison.
What is the disposal minimum applied to?
The entered disposal floor is one whole-job minimum. It is compared against the full-job weight charge. Confirm whether the written offer uses this billing basis.
Similar Calculators
Dumpster Load & Quote Planner
Estimate dumpster loads from debris volume and density bounds. Compare hard payload, included weight, rental extensions and the cost of extra loads.
Concrete Slab Calculator
Estimate concrete slab volume, cubic yards, bag count, waste allowance, and material cost.
Driveway Cost & Material Planner
Compare driveway costs from measured areas, pavement layers, excavation and supplier quotes. Plan material orders, truck loads, missing prices and budget headroom.
Concrete Patio Cost Calculator & Joint Quote Planner
Compare two written concrete patio quotes. Check equal rectangular panel grids and price installed area, interior joints and confirmed isolation footage separately.
Concrete Resurfacing Calculator for Patch & Skim Cost
Compare two concrete resurfacing quotes using separate patch volume, skim coverage and whole bags. Find the exact area where another skim bag is needed.
Pool Removal Cost Calculator & Fill Quote Comparison
Compare two pool removal quotes with measured pool void, finished and loose fill, confirmed haul limits, trip counts, and written costs.