Roof Tear-Off Cost & Layer Quote Calculator

Reconcile two roof tear-off bids against measured sloped plane areas and known shingle layers. See how exact or rounded roofing squares, labor minimums, and disposal charges affect each total. Test additional layers on one plane at a time.

Shingle layers and written bids

Compare roof tear-off and disposal quotes

Quote A costs less for this tear-off scenario.
Quote A
$1,537.00
30.5 sq billed for disposal
Quote B
$1,539.00
32 sq billed for disposal
Additional-layer scenario

Garage

Tear-off cost as layers are added

Only Garage changes. Each point is a separate whole-layer scope.

Quote A $1,537.00
Quote B $1,539.00

Measured planes

Plane 1
Plane 2
Quote A terms
Quote B terms

What each quote bills

30.5 sq of measured layer area across all planes.

Quote A

First layer
17 sq · $765.00
Extra layers
13.5 sq · $432.00
Labor minimum top-up
$0.00
Disposal
30.5 sq · $305.00
Fixed charge
$35.00

Quote B

First layer
18 sq · $900.00
Extra layers
14 sq · $280.00
Labor minimum top-up
$0.00
Disposal
32 sq · $224.00
Fixed charge
$135.00
Review billed layer quantities and exact CSV
Billed squares by plane and quote
PlaneQuoteLayersFirst squaresAdditional squaresDisposal squares
Main roofQuote A213.5 sq13.5 sq27 sq
GarageQuote A13.5 sq0 sq3.5 sq
Main roofQuote B214 sq14 sq28 sq
GarageQuote B14 sq0 sq4 sq

How to use this calculator

  1. Enter the contractor’s measured sloped area and known layer count for each roof plane or region.
  2. Copy each quote’s first-layer, additional-layer and disposal rate per roofing square, along with its labor minimum and fixed charges.
  3. Choose the quoted square billing basis. Select one plane and add a hypothetical layer to see the effect on both quotes.
  4. Review the billed quantities, minimum adjustment and exact ledger before comparing written totals.

The Formula

The mathematical logic powering this calculation is:

A roofing square is 100 square feet. Use measured sloped area for each plane. One confirmed layer contributes the plane area to first-layer removal. Each additional layer covering that plane adds the same area to extra-layer removal. For partly covered planes, enter separate measured regions so their layer counts match the actual scope.
Use the entered quote’s billing basis for all three per-square lines. Measured basis divides each sloped area by 100. Whole-plane basis rounds each distinct plane’s area up to the next whole square before multiplying by layer counts. From the first and extra billed quantities, calculate each labor line and round once to cents. If the total removal labor is below the entered labor minimum, add the difference. Disposal uses all billed layer squares at the entered per-square rate. Round it once to cents and add the separate fixed charge once. Round half cents up.
For the sensitivity comparison, add whole layers to one chosen plane up to six total, while holding the other measured quantities and quote terms fixed. It is a sequence of explicit work scopes. It does not infer layers or findings.
Enter one to six planes, measured areas 0.01–1,000,000 square feet with two decimals, one to six full layers per region, and USD charges through $1 million with two decimals. Use comparably scoped removal and disposal terms. New materials, decking repair, measured disposal tonnage, access requirements, special handling and permits need separate terms.

Worked Example

If you input:

  • Main roof: 1,350 sq ft, two layers
  • Garage: 350 sq ft, one layer
  • Quote A: Measured squares, $45 first layer, $32 additional, $10 disposal, $35 fixed
  • Quote B: Round per plane, $50 first layer, $20 additional, $7 disposal, $135 fixed

Result:

A is lower on the confirmed scope at $1,537 versus $1,539. With another garage layer, A totals $1,684 and B is lower at $1,647.

Frequently Asked Questions

Is a roofing square a square foot?

A roofing square equals 100 square feet. The calculator uses measured sloped area for each roof region.

Why do the two bids show different disposal squares?

A quote that rounds each plane before multiplying by layers can bill more squares than one using measured area.

When does the minimum affect the estimate?

The labor minimum raises the first and extra layer labor subtotal. The separately entered disposal and fixed charges still apply.

What if a layer covers only part of the plane?

Enter distinct measured regions with their own layer counts, using per-plane rounding only if that is how the quote bills those regions.

Can this turn the shingles into dumpster weight?

This compares stated disposal rate per billed square. A haul quote with weight limits needs a measured or documented weight basis.