Roof Area Calculator

Plan materials for a shed, gable or hip roof. Inspect sloped faces and edges, compare allowances, and price whole packages.

Roof geometry & material planning

See the roof behind your material estimate

Try a roof project

Building dimensions and roof shape

Measure the wall outline, not the sloped roof. The roof slopes across the width. Changing shape keeps the entered rise or slope.

Horizontal distance beyond each wall, not a length measured along the slope.

Horizontal distance beyond each end of the building.

Rise over half the wall width, excluding overhangs.

Roof-covering area deduction

Unpositioned total area only. This reduces roof covering, not underlayment or edge lengths. It does not model openings, cuts or reusable offcuts.

Coverage, allowances and your prices

Use effective installed coverage from the applicable product instructions; account for laps in that coverage.

Changing currency relabels entered prices; it does not exchange or convert them.

Roof covering · required

Sloped roof area minus the entered deduction, then its own allowance.

Roof covering assumptions
Underlayment · included

All sloped roof area, including the area deducted from roof covering. Enter installed coverage after laps.

Underlayment assumptions
Starter strips · included

Eaves plus sloped rakes. The shed’s high horizontal edge is excluded.

Starter strips assumptions
Ridge and hip caps · included

Ridges plus hips, each shared edge counted once. A shed has no ridge or hip cap run.

Ridge and hip caps assumptions

Sloped roof area

≈ 100 m²

≈ 10.7639 roofing squares (100 ft² each)

Roof covering to purchase

37 packages

After deduction and 10% allowance

Selected material cost

$1,505.00

Your package prices; no labor, tax or other roofing-system costs

Roof slope

≈ 9:12

≈ 36.8699°; rise 3 m

Inspect the roof geometry

The same measured roof supplies the diagram, material quantities and exported data.

Left slope: ≈ 50 m² sloped area; ≈ 40 m² horizontal plan area.
Roof plan viewed from aboveEqual horizontal scales. Colored faces show projected footprint, not sloped area. Dashed outline is the building’s walls. Selected Left slope, sloped area 50 m². Full faces, edges and coordinates are in the data tables.Left eave: 10 mRight eave: 10 mFront left rake: 5 mFront right rake: 5 mBack left rake: 5 mBack right rake: 5 mRidge: 10 m120 m4 m8 mWidth → · length ↑Y: 0 → 10 m

Top view uses the same scale in both directions. Numbered faces match the ledger; dashed lines mark the wall outline. An area deduction is unpositioned and is not drawn as a hole.

Roof faces, edges and materials

Approximate quantities are for reading; exact expressions and original assumptions are retained in the details and CSV.

Material purchase breakdown
MaterialBase quantityAllowanceRequiredWhole packagesPurchased surplusCost
Roof covering≈ 100 m²10%≈ 110 m²37≈ 1 m²$1,110.00
Underlayment≈ 100 m²5%≈ 105 m²3≈ 15 m²$240.00
Starter strips≈ 40 m5%≈ 42 m3≈ 18 m$75.00
Ridge and hip caps≈ 10 m5%≈ 10.5 m2≈ 9.5 m$80.00

Surplus is purchased coverage minus the requirement including allowance. It does not prove that offcuts are reusable. Whole-package counts use exact sufficiency checks; displayed geometry is rounded.

Face areas, unique edges and coordinates
Roof faces and exact area expressions
FacePlan areaSloped areaExact sloped expressionVertices (x, y, z)
1. Left slope≈ 40 m²≈ 50 m²50 m²
outer-front-left: (0, 0, 0) m
ridge-front: (4, 0, 3) m
ridge-back: (4, 10, 3) m
outer-back-left: (0, 10, 0) m
2. Right slope≈ 40 m²≈ 50 m²50 m²
ridge-front: (4, 0, 3) m
outer-front-right: (8, 0, 0) m
outer-back-right: (8, 10, 0) m
ridge-back: (4, 10, 3) m
Every geometric roof edge counted once
EdgeKindLengthExact lengthEndpoints (x, y, z)
Left eaveeave≈ 10 m10 m(0, 0, 0) → (0, 10, 0) m
Right eaveeave≈ 10 m10 m(8, 0, 0) → (8, 10, 0) m
Front left rakerake≈ 5 m5 m(0, 0, 0) → (4, 0, 3) m
Front right rakerake≈ 5 m5 m(4, 0, 3) → (8, 0, 0) m
Back left rakerake≈ 5 m5 m(0, 10, 0) → (4, 10, 3) m
Back right rakerake≈ 5 m5 m(4, 10, 3) → (8, 10, 0) m
Ridgeridge≈ 10 m10 m(4, 0, 3) → (4, 10, 3) m
View CSV text

Focus the text to select it. This is the same CSV requested by the download button.

What changes when you allow more material?

These are comparison assumptions, not recommended waste percentages. Only the roof-covering allowance changes.

Whole roof-covering packages at different allowances0%: 34 packages; 5%: 35 packages; 10%: 37 packages; 15%: 39 packages; 20%: 40 packages. Package counts change in whole steps. The table includes required area and total selected-material cost.0%34 packages5%35 packages10% · entered37 packages15%39 packages20%40 packages
Roof-covering allowance scenarios; other materials stay unchanged
AllowanceRequired coveringPackagesRoof covering costAll selected materials
0%≈ 100 m²34$1,020.00$1,415.00
5%≈ 105 m²35$1,050.00$1,445.00
10%≈ 110 m²37$1,110.00$1,505.00
15%≈ 115 m²39$1,170.00$1,565.00
20%≈ 120 m²40$1,200.00$1,595.00
How this estimate is calculated

Convert wall dimensions and overhangs into a plan

R = W + 2e; T = L + 2d (hip: d = e)

R = 8 m; T = 10 m

Apply the common slope factor

s = rise/wall run = rise-per-12/12; factor = √(1+s²)

s = 3/4; factor = 5/4

Separate surface and material bases

Gross area = R × T × √(1+s²); roof covering = gross − deduction

Gross = 100 m²; net = 100 m²

Buy whole packs for each enabled category

Required = basis × (1 + allowance/100); packs = smallest integer with packs × coverage ≥ required

Exact entered-price total: 1505.00 USD

  • One rectangular footprint with a single uniform pitch: shed, symmetric gable, or equal-pitch hip. No valleys, dormers, intersecting roofs, penetrations or curved surfaces are inferred.
  • Width and length are horizontal wall-to-wall measurements. Overhangs are horizontal projections on each relevant side. Vertical rise is over the wall run and excludes overhang.
  • The coordinate origin uses z=0 at the low/equal wall eave; negative overhang z values are expected. This is not an absolute site elevation or wall-height design.
  • Coverage is the user-entered effective installed coverage per pack or roll after laps. Allowances are user assumptions, not recommended waste rates. Packs are rounded up using exact rational-radical comparisons.
  • Starter is eaves plus rakes, excluding a shed high edge. Cap is ridge plus hips. Edge quantities do not specify fastening, cuts, product compatibility or installation details.
  • Costs include enabled material categories only; no labor, tax, shipping, flashing or other unentered items. Changing currency changes the price label and performs no exchange conversion.
  • Polygon coordinates and root magnitudes are approximate for drawing, while feasibility and integer-pack decisions use exact entered quantities. Exact cents and algebraic expressions are retained.

Roof area approximately 100 m². Selected materials $1,505.00.

Measurement and product coverage sources

This is a single rectangular-roof planning estimate, not a framing plan, cut layout, installation specification or complete quote. It does not determine product suitability, drainage, structural capacity or local code compliance. Allowances and prices are your assumptions.

How to use this calculator

  1. Choose metres or feet, then shed, symmetric gable or equal-pitch hip. Enter wall-to-wall width across the slope and length along the ridge direction. A hip roof requires length at least as large as width; equal dimensions form a pyramid.
  2. Enter horizontal overhangs beyond the walls, not lengths measured on the roof surface. Hip mode uses the same overhang on every side. Specify rise per 12 horizontal units or vertical rise over the displayed wall run; changing the pitch notation preserves slope.
  3. Inspect the roof faces and edge ledger. If you deliberately exclude measured roof openings from field coverage, enter their total sloped area. This deduction is unpositioned and does not change the gross geometry, underlayment, edges or trim requirements.
  4. Enter effective installed coverage, a separate allowance and price for each included material. Use the product's actual package information, including lap effects where relevant. The example values are editable assumptions, not product recommendations or a roof quote.
  5. Compare whole-package counts and the roofing-allowance scenarios. Review the selected face or edge, measurement conventions and exact ledger, then download the CSV or open its selectable text. Resolve invalid inputs before relying on the estimate.

The Formula

The mathematical logic powering this calculation is:

Let W and L be wall-to-wall width and length, e the horizontal eave overhang, and d the horizontal end overhang. For a hip roof, d = e. Outer plan dimensions are R = W + 2e and T = L + 2d.
Slope s = rise/run = (rise per 12)/12. The wall run is W for a shed and W/2 for a symmetric gable or equal-pitch hip. The slope factor k = √(1 + s²), so gross surface area G = RTk. A roofing square is exactly 100 ft² = 9.290304 m².
Gable: two faces each (R/2)Tk; eaves 2T, rakes 2Rk, ridge T. Shed: one face RTk; low eave T, two rakes totaling 2Rk, and a separate high edge T. Hip, with L ≥ W: ridge L − W; two side faces each [T + (L − W)]Rk/4; two end faces each R²k/4; four hips totaling 2R√(2 + s²).
Roofing basis = G − entered sloped-area deduction. Underlayment basis = G. Starter basis = eaves + rakes. Cap basis = ridge + hips. Each included material has required quantity = basis × (1 + allowance/100), packages = the least whole number whose effective coverage meets that requirement, and cost = packages × price. The shed high edge is not included in starter or cap.
Each quantity has the form A√B + C. Whole-package sufficiency is compared with exact rational arithmetic and sign-aware squared comparisons; displayed square roots and angles are approximations. Costs use exact minor currency units from the entered two-decimal prices.

Worked Example

If you input:

  • Measurement unit: Metres and m²
  • Roof shape: Symmetric gable
  • Wall-to-wall width: 8
  • Wall-to-wall length: 10
  • Horizontal eave overhang: 0
  • Horizontal end overhang: 0
  • Pitch notation: Vertical rise over wall run
  • Vertical rise: 3
  • Deducted sloped area: 0
  • Price currency: USD
  • Roofing coverage per package: 3
  • Roofing allowance (%): 10
  • Roofing price per package: 30
  • Include underlayment: Yes
  • Underlayment coverage per roll: 40
  • Underlayment allowance (%): 5
  • Underlayment price per roll: 80
  • Include starter: Yes
  • Starter coverage per package: 20
  • Starter allowance (%): 5
  • Starter price per package: 25
  • Include ridge and hip cap: Yes
  • Cap coverage per package: 10
  • Cap allowance (%): 5
  • Cap price per package: 40

Result:

An 8 m × 10 m gable with a 3 m rise over each 4 m wall run has 5 m sloped sides and two 50 m² faces: 100 m² gross roof area. Eaves total 20 m, rakes 20 m and ridge 10 m. With the entered allowances, roofing requires 110 m², underlayment 105 m², starter 42 m and cap 10.5 m. Packages are respectively 37 × 3 m², 3 × 40 m², 3 × 20 m and 2 × 10 m. At the illustrative prices shown, costs are $1,110 + $240 + $75 + $80 = $1,505. Labor, flashing, fastening and other materials are not included.

Frequently Asked Questions

Which roof shapes and measurements does this support?

One rectangular footprint with a single-slope shed, a symmetric gable, or an equal-pitch hip roof. Width is measured wall to wall across the slope; length is along the ridge direction. The hip length must be at least the width. Overhangs are horizontal projections beyond the walls. Intersecting roofs, valleys, dormers, different pitches on different faces, curved surfaces and joined buildings need separate measured geometry; their areas or shared edges are not inferred here.

Why can a hip and a gable have the same area but different materials?

For the same outer rectangular plan and uniform slope, each part of the plan has the same slope factor, so total surface area is the plan area times √(1 + slope²). The faces and edges differ. A gable has sloping rakes and a long ridge; a hip has perimeter eaves, sloping hips and a shorter ridge. Starter and ridge/hip cap quantities therefore need their own edge measurements rather than a percentage of roof area.

What does a roofing square or bundle mean here?

A roofing square is 100 square feet of surface area, exactly 9.290304 square metres. A bundle or package does not have one universal coverage: the installed coverage depends on the specific product. Enter that coverage directly. The planner does not assume that three bundles always cover one square, nor that nominal roll area equals installed underlayment coverage after overlaps.

How are openings and waste treated?

The optional deduction is a total measured sloped-surface area removed only from the field-roofing basis. It does not draw or validate the location of skylights, chimneys or penetrations, and it does not remove their flashing or cutting needs. Underlayment uses gross area; edge products use measured edge lengths. Each material has a separate editable allowance. The scenario table changes only the roofing allowance and holds the other assumptions fixed; it is not a recommended waste schedule.

Can I use the slope length as a rafter cut or structural design?

No. The diagrams describe ideal roof surfaces and their geometric edges. They do not deduct ridge thickness, birdsmouths, seats, bevels, joints or material thickness, and they do not size members or evaluate loads, span capacity, drainage or local installation requirements. A zero-slope shed represents flat geometry only. These measurements are not a framing cut list or a determination that a roof or product is suitable.

How do unit, pitch and currency changes affect the estimate?

Metre/foot changes retain the same physical lengths, areas and package coverage, including when displayed conversions need rounding. Switching between rise and rise-per-12 also retains slope. An incomplete dimensional draft prevents a unit change until it can be converted safely. Changing the roof shape keeps the entered ratio or vertical rise, so its different wall run may change slope. Currency selection changes the price unit; it does not obtain exchange rates or convert the entered prices.

How are package thresholds and prices rounded?

Package counts are the smallest whole quantities that meet the entered requirement, using exact comparisons of rational and square-root expressions. There is no tolerance that rounds a small shortage down to a full package. The visible areas, angles and geometry are approximate, and the exact expressions remain in the ledger and export. Prices allow two decimal places; package costs and their sum use exact minor units. Exact arithmetic does not make measurements or allowance assumptions exact.

What limits and costs are included?

Wall dimensions are 0.1–1,000 m, horizontal overhangs 0–20 m and slope at most 4 rise per 1 run. Gable and hip slopes must be positive. The deduction cannot exceed gross area. Effective package coverage is 0.0001–10,000 m² or m as appropriate; allowances are 0–100%, prices 0–1,000,000, and a material may require at most one billion packages. Authored measurements allow 16 significant digits and 12 effective decimal places. Costs include only the selected four material categories at your prices; tax, delivery, labor, fastening, flashing, ventilation and other system components are excluded.

Similar Calculators