Radiant Tube Heater Footprint Coverage Calculator
Use two documented rectangular radiant footprints for each layout, with both layouts referenced to the same plan. Compare how much of the bay and the priority work area they cover. The scaled view distinguishes the two projected footprints, their shared area and gaps.
Compare radiant tube footprint coverage
Compare two documented layouts and check how much of the bay and the priority work area each reaches.
Edit bay, work area and footprints
Only Layout A meets the entered footprint coverage targets.
Minimum 80% of bay and 100% of priority area
Layout A
Meets both coverage targets- Whole bay
- 80%
- 192 m² covered
- Meets target
- Priority work area
- 100%
- 48 m² covered
- Meets target
Layout B
Misses a coverage target- Whole bay
- 80%
- 192 m² covered
- Meets target
- Priority work area
- 62.5%
- 30 m² covered
- Below target
Inspect the coverage plan
Whole bay plan
20 × 12 m
Plan origin (0, 0) m
- Footprint 1
- Footprint 2
- Both
- Uncovered
- Priority area
Layout A · Whole bay
192 of 240 m²
80% covered · Meets 80% target
- Covered once
- 168 m²
- Overlap
- 24 m²
- Uncovered
- 48 m²
Review the exact coverage ledger
| Layout | Region | Total (m²) | Covered once (m²) | Overlap (m²) | Uncovered (m²) | Coverage (%) | Meets target |
|---|---|---|---|---|---|---|---|
| A | Whole bay | 240 | 168 | 24 | 48 | 80 | Yes |
| A | Priority work area | 48 | 42 | 6 | 0 | 100 | Yes |
| B | Whole bay | 240 | 168 | 24 | 48 | 80 | Yes |
| B | Priority work area | 48 | 24 | 6 | 18 | 125/2 | No |
How to use this calculator
- Enter the bay dimensions and the minimum areas you want covered as percentages of the bay and priority area.
- Enter a priority work area within the bay using its starting coordinates and extents.
- Transcribe two rectangular footprints for each documented layout into the same axes. Use projected area dimensions for the same workplane and criterion.
- Compare unique coverage and open the scaled region view. Select the layout and region to inspect overlap and uncovered areas.
- Review the exact coverage ledger and download both layouts for your record.
The Formula
The mathematical logic powering this calculation is:
The plan zero is the upper-left reference corner of the rectangular bay. Rectangles align with the bay axes and are described by a start coordinate and extent on each axis. Clip the two documented footprint rectangles to the chosen region. Each clipped width or length is the common span between max(start coordinates) and min(end coordinates), with touching or disjoint boundaries giving zero area.
Unique area covered = first clipped area + second clipped area − common area. Singly covered area = unique covered area − common area. Uncovered area = region area − unique covered area. Coverage percentage = 100 × unique covered area ÷ region area. Evaluate the whole bay and the wholly contained priority area separately. Both entered minimum percentages must be met for the layout to meet the comparison; equality qualifies. All decisions and exported values use exact rational arithmetic for the entered measurements.
Use a common documented footprint basis, projection plane and coordinate origin. For both layouts, lengths and widths are 0.001–1,000 m. Footprint starting coordinates use signed values from −1,000 to +1,000 m and can extend past the modeled bay. Priority starts are nonnegative, and the priority rectangle must fit inside the bay. Minimum percentages are 0–100. Fields accept up to three decimals.
This is an area comparison for rectangular primary footprints. Actual radiant flux is nonuniform and can extend beyond a manufacturer's primary outline. The overlap area describes the intersection of the rectangles. Heater output, temperature, thermal comfort, clearance, reflector selection, positioning and installation depend on product and project specifications.Worked Example
If you input:
- Bay: 20 m by 12 m, at least 80% covered
- Priority area: 8 m by 6 m, starts at (2, 0) m, 100% covered
- Layout A rectangles: 12 m by 9 m, starting at (0, 0) and (8, 3) m
- Layout B rectangles: 12 m by 9 m, starting at (0, 3) and (8, 0) m
Result:
Both layouts cover 192 m² of the 240 m² bay, or 80%. A covers the full 48 m² priority area. B covers 30 m² there, or 62.5%. Only A meets both minimums. Raising the bay target to 80.001% means neither layout meets both.
Frequently Asked Questions
Why compare a priority area with the whole bay?
Two layouts can cover the same total floor area while reaching different work stations. The independent priority comparison makes that difference visible.
What if a footprint extends past the bay?
The model counts only the portion inside the selected rectangle. It also counts shared area only once in unique coverage.
Does overlap double the heating in that spot?
Overlap marks geometry covered by two entered rectangles. Actual heat flux depends on location, equipment and configuration and needs separate evidence.
Do the entered examples specify equipment for my bay?
The examples are illustrative rectangles and coverage limits. Use the documentation for the contemplated layout and its conditions to choose geometry inputs.
Similar Calculators
Garage Heater Size & Door Recovery Calculator
Compare two delivered garage heater outputs through logged door-opening losses and planned heating intervals. Calculate the output needed by the deadline.
Floor Heating Cable Coverage & Quote Calculator
Measure the floor area available for electric warming after overlapping exclusions. Compare the documented coverage and price of two written quotes.
Room Heat Loss & Retrofit Calculator
Explore room heat loss and sensible cooling, compare envelope and ventilation retrofits, and visualize heat flows and outdoor-temperature sensitivity with exact CSV ledgers.
