Kitchen Remodel Cost & Quantity Planner
Connect measured kitchen quantities to written supplier quotes. Build separate cabinet-run elevations, place countertop rectangles on a shared plan, mark sink and cooktop exclusions, and measure backsplash sections. The planner calculates frontage and countertop union area without counting overlaps twice, then compares up to three quotes using explicit price units and gross or net area billing. Included items must identify the priced scope that covers them; missing active prices remain visible instead of becoming free work. Inspect diagrams, billable quantities and the cost breakdown, then export exact geometry and rounded quote totals. The examples contain illustrative prices, not local market estimates. This is a quantity and budget comparison, not a room layout approval, countertop fabrication plan, contractor recommendation or prediction of resale value.
Connect your kitchen measurements to the quote
See cabinet frontage, countertop geometry and billed scope together. Compare complete quotes without hiding unpriced work.
Measure once, compare the same scope
Start with illustrative measurements and prices, then enter your actual kitchen and written quotes. Cabinet runs are separate elevations; countertop rectangles describe measured area. This does not produce a room-clearance check, slab cutting plan or fabrication specification.
Project and measurement settings
Three uppercase letters. No exchange-rate conversion.
Applied to complete pretax totals after discount; kept separate from contractor cost.
Converts physical dimensions exactly. Quote price units remain explicit and unchanged.
Enter only the edge length the quote bills for finishing. It is not automatically the whole countertop perimeter.
Cabinet runs and appliance modules
Each run is a separate measured elevation. Modules appear in entered order, followed by unused space. Base, wall and tall frontages are billed separately; fillers do not become cabinet frontage. This does not check room clearances or connect corners.
Changing type preserves modules; correct any module kinds that no longer fit.
Must contain every entered module width.
Upper runs accept wall/filler; floor runs accept base/tall/appliance/filler.
Upper runs accept wall/filler; floor runs accept base/tall/appliance/filler.
Upper runs accept wall/filler; floor runs accept base/tall/appliance/filler.
Countertop plan regions
Place rectangles on one plan plane. Overlaps count once; this is measured area geometry, not slab nesting or a seam plan. Positions use a bottom-left origin.
Measured countertop exclusions
Exclusions must lie wholly inside the countertop union and must not overlap each other. Boundary contact is allowed geometrically; this does not approve fabrication, cutout shape or support details.
Each exclusion contributes one count to its quote scope.
Backsplash sections
Enter measured rectangular sections and their counts. These quantities are separate from countertops; deductions are not inferred.
Whole count from 1 through 100.
Other measured or quoted scope
Use these rows for demolition, service work, flooring or other explicitly entered scope. New rows are unpriced in every quote. A quantity of 1 with unit “job” represents a lump sum.
A label only; these extra quantities are not converted with measurement units.
Quote billing and included scope
Use supplier prices for the same measured scope. Priced rows carry their own charge. Included rows name another active priced row that covers them. Active unpriced work prevents a complete total. Changing status preserves your saved price for later restoration.
Gross counts the union before exclusions; net deducts measured exclusions. Match the written quote.
An amount from the quote; no tax rate or legal rule is inferred.
Deducted before entered tax and held contingency.
Billable quantity: 2.4 m
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 1.8 m
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 0 m — inactive scope
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 2.64 m2
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 3.6 m
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 1 each
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 0 each — inactive scope
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 0 each — inactive scope
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 1.5 m2
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 1 each
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Billable quantity: 1 job
Included work is not independently charged; unpriced active work remains missing.
Unit changes also convert an entered/saved price exactly. If six-decimal precision is insufficient, the switch is rejected.
Up to six decimal places. Each line is rounded half up to cents.
Compare the entered quotes
| Quote | Area basis | Known subtotal | Planned total | Missing scope | Comparison |
|---|---|---|---|---|---|
| Illustrative supplier | gross | USD 5,836 | USD 6,809.6 | None in entered scope | Lowest complete modeled total |
Complete means every active item in this entered scope has a price or an explicit inclusion. It does not establish that all work needed for the project is listed, or compare contractor quality. Prices, discounts and tax are entered assumptions.
Countertop area without overlap double-counting
Sink exclusion: left 0.8 m, bottom 0.1 m, size 0.6 m × 0.4 m, area 0.24 m². This geometric exclusion does not certify a manufacturable cutout.
Gross boundary length: 10 m. Separately entered finished edge: 3.6 m. The full boundary is not automatically charged as finished edge.
Countertop region and exclusion coordinates
| Region | Role | x (m) | y (m) | Width (m) | Depth (m) |
|---|---|---|---|---|---|
| Main top | Input region | 0 | 0 | 3 | 0.6 |
| Return | Input region | 0 | 0.6 | 0.6 | 1.4 |
| Sink exclusion | sink exclusion | 0.8 | 0.1 | 0.6 | 0.4 |
Cabinet frontage and unused run space
5 cabinet modules; 1 appliance modules. Fillers total 0.3 m and unused run width totals 2.9 m. Neither is silently charged as cabinet frontage.
Floor run: 3.1 m occupied + 0.9 m unused = 4 m available. Module heights in this strip are illustrative; widths are proportional.
Selected baseA (base): start 0 m, width 0.6 m, end 0.6 m.
| Module | Kind | Start (m) | Width (m) | End (m) |
|---|---|---|---|---|
| baseA | base | 0 | 0.6 | 0.6 |
| baseB | base | 0.6 | 0.8 | 1.4 |
| oven | appliance | 1.4 | 0.6 | 2 |
| baseC | base | 2 | 1 | 3 |
| filler | filler | 3 | 0.1 | 3.1 |
Trace the billable scope
Illustrative supplier bills countertop gross area. Prices use the explicit units below, independent of the measurement display unit. Included work has no separate charge; unpriced active work remains unavailable.
| Scope | Billable quantity | Unit price | Status / included in | Line cost |
|---|---|---|---|---|
| Base cabinet fronts | 2.4 m | USD 1,000 | priced | USD 2,400 |
| Wall cabinet fronts | 1.8 m | USD 500 | priced | USD 900 |
| Tall cabinet fronts | 0 m | USD 1,500 | Inactive (zero quantity) | USD 0 |
| Countertop surface | 2.64 m2 | USD 400 | priced | USD 1,056 |
| Measured finished edge | 3.6 m | USD 50 | priced | USD 180 |
| Sink exclusions | 1 each | USD 150 | priced | USD 150 |
| Cooktop exclusions | 0 each | USD 100 | Inactive (zero quantity) | USD 0 |
| Other exclusions | 0 each | USD 50 | Inactive (zero quantity) | USD 0 |
| Backsplash sections | 1.5 m2 | USD 100 | priced | USD 150 |
| Appliance modules | 1 each | USD 700 | priced | USD 700 |
| Demolition | 1 job | USD 300 | priced | USD 300 |
From priced scope to project budget
Each segment starts at the preceding total. The discount moves left; entered tax and held reserve move right. Values are in USD; zero amounts remain in the table.
| Step | Change | Running total |
|---|---|---|
| Base cabinet fronts | USD 2,400 | USD 2,400 |
| Wall cabinet fronts | USD 900 | USD 3,300 |
| Countertop surface | USD 1,056 | USD 4,356 |
| Measured finished edge | USD 180 | USD 4,536 |
| Sink exclusions | USD 150 | USD 4,686 |
| Backsplash sections | USD 150 | USD 4,836 |
| Appliance modules | USD 700 | USD 5,536 |
| Demolition | USD 300 | USD 5,836 |
| Entered discount | USD -100 | USD 5,736 |
| Entered tax | USD 500 | USD 6,236 |
| Held reserve | USD 573.6 | USD 6,809.6 |
Keep the measurements and quote trail
Export all inputs, cabinet positions, countertop union cells and boundaries, exclusions, every quote line, missing scope and complete totals. Geometry uses canonical metres and square metres with exact fractions. Prices and rounded line totals retain their billing units and entered currency.
How to use this calculator
- Load Measured kitchen example or Gross, net and missing scope, then open Edit measurements and quotes. Enter a currency label, project budget, held contingency and measurement unit. Use your supplier’s actual dimensions and written scope.
- Build each cabinet run in order using base, wall, tall, appliance and filler modules. Enter countertop rectangles and measured exclusions on a shared bottom-left coordinate plane. Add measured backsplash sections and separately entered finished-edge length.
- Add other quoted work, such as demolition, as extra scope with an explicit quantity and unit label. A quantity of 1 job represents a lump sum. New extra rows appear as unpriced in every quote until you supply their pricing status.
- Choose each quote to edit. Match its gross/net countertop basis and billing units, then enter separate unit prices or name the active priced row that includes bundled work. Leave genuinely missing prices unpriced. Enter quoted tax and discount as amounts.
- Update kitchen comparison. Inspect the countertop plan, cabinet run, billable-scope ledger and cost accumulation. Compare complete totals and budget headroom separately from known subtotals of incomplete quotes. Download kitchen CSV or show its selectable copy to retain the full calculation trail.
The Formula
The mathematical logic powering this calculation is:
Cabinet runs are separate ordered elevations. Each module starts where the preceding one ends; occupied width = sum of module widths and unused width = entered run length − occupied width. Module widths cannot exceed the run. Base, wall and tall cabinet frontage are summed separately. Cabinet count includes those three module types; appliance count includes appliance modules. Fillers and unused space are reported separately and do not automatically become cabinet frontage. No corner connection, aisle clearance or cross-run collision is inferred.
Countertop gross area is the exact union of entered axis-aligned rectangles. The model divides their combined x/y boundaries into cells and counts each covered cell once. Shared internal edges do not contribute to the gross boundary length; boundaries around empty internal regions do. Each rectangular exclusion must be fully covered by the countertop union, and exclusions may touch but cannot overlap. Net area = gross union area − total exclusion area. A boundary-touching exclusion is allowed as area geometry, not certified as a manufacturable cutout. The separately entered finished-edge length cannot exceed the gross boundary length. No seam, slab nesting, safe cutout radius, support or overhang recommendation is inferred.
Backsplash quantity = sum of entered width × height × section count. Extra scope uses its explicit entered quantity and unit label. These quantities remain independent: countertop regions are not inferred from cabinet runs, and backsplash deductions are not inferred from countertop exclusions.
Each quote chooses gross or net countertop area for billing. Length rates use metres or feet, area rates use square metres or square feet, counts use each and extra scope uses its entered unit. Billable quantity = canonical quantity / billing-unit factor, with 1 ft = 0.3048 m and 1 ft² = 0.09290304 m² exactly. Every quote contains one price-status record for each standard and extra scope row. A priced line cost = billable quantity × unit price, rounded half up to cents.
Included scope has no separate charge only when it directly names another active priced row that covers it. Self-references, chains and inactive or unpriced parents are rejected for active included work. A zero-quantity row is inactive and does not create missing scope. An active unpriced row retains an unavailable line cost; that quote has a known subtotal but no complete total, reserve, budget headroom or lowest-cost rank.
For a complete quote, known subtotal = sum of rounded priced lines. Pretax amount = known subtotal − entered discount and cannot be negative. Contract amount = pretax amount + entered tax. Held reserve = pretax amount × contingency percentage, rounded half up to cents. Planned project total = contract amount + held reserve. Budget headroom = entered budget − planned total, with negative results retained. Lowest complete modeled totals include ties, but compare only the listed scope and entered prices, not quality or project suitability. Tax is an entered amount, not a calculated legal rule.
Physical measurements support m, cm, mm, ft and in. Unit changes preserve quantities exactly; 1 in = 0.0254 m. Quote price units stay explicit. Switching a price unit converts both billing quantity and its saved price; conversion is rejected if it cannot remain exact within the supported six price decimals. Changing price status preserves the prior price draft. Adding extra scope creates an unpriced row in every quote.
Geometry uses exact rational arithmetic. Money uses integer cents after each declared rounding step, including beyond JavaScript safe-integer limits. CSV includes canonical metre/square-metre geometry, exact fractions, all input rows, union cells and edges, cabinet positions, quote line units and complete/incomplete totals. Display rounding does not feed back into the calculations.
Supported bounds: 0–8 cabinet runs with up to 30 modules each, 0–12 countertop rectangles, 0–12 exclusions, 0–12 backsplash sections and 0–20 extra scope rows; compare 1–3 quotes. Run and individual geometric lengths are positive through 100 m; countertop coordinates and outer right/top bounds are 0–100 m. Backsplash counts are integers 1–100. At least one billable scope quantity must be positive. Physical quantities accept unsigned decimals up to nine places or bounded exact fractions. Extra quantities are 0–1,000,000; prices are 0–1 billion currency units with up to six decimals. Budget, entered tax and discount allow two decimals through 1 billion; contingency allows 0–100% with four decimals. These numerical limits are not construction guidance.
The model excludes automatic local prices, installation labor unless entered, waste, material suitability, structural/code checks, appliance clearances, countertop fabrication or nesting, schedules, financing, tax advice and resale returns. The sources provide measurement and planning context. Union geometry, quote inclusion rules and cost accounting above are the calculator’s declared method, not supplier-specific billing requirements.Worked Example
If you input:
- Cabinet runs: Floor: base widths 0.6, 0.8 and 1 m, one 0.6 m appliance and 0.1 m filler in a 4 m run. Upper: 1 and 0.8 m wall modules plus 0.2 m filler in a 4 m run.
- Surfaces: Countertops: 3 × 0.6 m plus a 0.6 × 1.4 m return. Sink exclusion: 0.6 × 0.4 m. Backsplash: 3 × 0.5 m. Finished edge: 3.6 m.
- Illustrative prices: USD 1,000/m base frontage, 500/m wall frontage, 400/m² gross countertop area, 50/m edge, 150/sink, 100/m² backsplash, 700/appliance and 300 demolition.
- Budget adjustments: USD 100 discount, USD 500 entered tax, 10% held reserve and USD 8,000 budget.
Result:
Base frontage is 2.4 m and wall frontage is 1.8 m. Gross countertop area is 2.64 m²; the 0.24 m² exclusion leaves 2.4 m² net. Backsplash area is 1.5 m². Priced lines total USD 2,400 + 900 + 1,056 + 180 + 150 + 150 + 700 + 300 = USD 5,836. After the USD 100 discount, pretax is USD 5,736. The contract amount including entered tax is USD 6,236; the separately held reserve is USD 573.60. Planned total is USD 6,809.60, leaving USD 1,190.40 budget headroom. The same rates billed on net countertop area produce a USD 6,704 planned total. The comparison’s bundled-sink quote with an unpriced appliance has only a USD 4,986 known subtotal and no complete final total.
Frequently Asked Questions
Does this estimate local kitchen remodeling prices?
No. It derives quantities from your measurements and applies prices you enter. Example prices are illustrative. Include installation, delivery, services, demolition or other needed work explicitly; a complete modeled quote only covers the rows you listed.
Why are gross and net countertop areas different?
Gross area counts the union of measured countertop rectangles before exclusions. Net area deducts the measured sink, cooktop and other exclusions. Suppliers may use different billing conventions, so each quote explicitly chooses gross or net. The calculator does not claim that one convention applies universally.
What happens when countertop rectangles overlap?
Overlapping regions are counted once. The exact union method also excludes shared internal edges from boundary length. Turning on cell boundaries reveals calculation subdivisions; these are not seam locations or a slab-cutting plan.
How do included items avoid double-counting?
An included item names another active priced scope row that covers its work. Its separate cost is zero because it is bundled, not because it is missing. Active included rows cannot point to themselves, another included row, an inactive row or an unpriced row.
Why can an incomplete quote show a subtotal but no total?
Known priced work can be added accurately while other active work remains unpriced. Presenting a final total or calling that quote cheapest would imply the missing work is free. Complete totals, reserves and rankings remain unavailable until the active scope is priced or explicitly included.
Are cabinet frontages interchangeable with cabinet counts?
No. Frontage sums widths separately for base, wall and tall modules, while cabinet count counts those modules. Appliance modules have their own count. Filler and unused run widths stay separate. Match the chosen billing basis to the written quote; use extra scope for a pricing method not represented by the standard categories.
Does the plan confirm a safe or manufacturable layout?
No. Cabinet runs are independent elevations, not a connected room layout. Countertop rectangles and exclusions describe area only. The tool does not check appliance clearance, supports, edge profiles, cutout corner radii, seams, slab availability, structural requirements or code compliance.
Can I change units without changing costs?
Measurement unit changes preserve physical quantities and leave quote units unchanged. Billing-unit changes convert the quantity and price together when the new price is exactly representable within six decimals. If not, the switch is rejected so you can keep the original billing unit or obtain a quote in the desired unit. Currency labels do not convert money.
Similar Calculators
Bathroom Remodel Cost & Quote Calculator
Compare bathroom remodeling quotes, allowances, changes and missing scope. Plan contingency and contractor payments with a cash timeline, exact tables and CSV.
Tile Project Calculator
Estimate tile quantity, box count, waste allowance, and project material cost.
Paint Coverage Calculator
Estimate paintable wall area, paint needed, gallons to buy, and project cost with room-by-room deductions.
Cabinet Layout Fit & Installation Quote Planner
Compare kitchen cabinet installation quotes and fit. Plot open drawers and appliances, find clearance conflicts, and inspect the aisle between opposing runs.
