Insulation Roll Calculator & Cut Purchase Planner

Enter up to twelve measured insulation strip lengths at a common cut width. The worksheet finds a cut allocation using each option’s compatible remnant and the fewest new rolls. Compare full packs, unopened rolls and written checkout costs on a shared length chart.

Roll material

Compare insulation roll cuts and purchase costs

Measured strips

Enter each continuous length at the common cut width agreed for this job.

Offer A
Offer B
Offer B has the lower entered purchase cost.
Offer A
$152.00
2 packs · 3 new rolls used · 1 unopened
Offer B
$125.00
2 packs · 2 new rolls used · 0 unopened
Measured cuts across rolls and remnant

All bars share a length scale. Colored segments are measured cuts. Gray is unused material in an opened roll.

Offer A

  1. New roll 130.00 of 30.00 ft

    Strip 1 (18.00 ft) · Strip 6 (12.00 ft)

  2. New roll 230.00 of 30.00 ft

    Strip 2 (17.00 ft) · Strip 5 (13.00 ft)

  3. New roll 330.00 of 30.00 ft

    Strip 3 (16.00 ft) · Strip 4 (14.00 ft)

Offer B

  1. Held remnant16.00 of 20.00 ft

    Strip 3 (16.00 ft)

  2. New roll 135.00 of 40.00 ft

    Strip 1 (18.00 ft) · Strip 2 (17.00 ft)

  3. New roll 239.00 of 40.00 ft

    Strip 4 (14.00 ft) · Strip 5 (13.00 ft) · Strip 6 (12.00 ft)

Review strip allocation and purchase CSV

How to use this calculator

  1. Enter the agreed cut width and one continuous length per measured strip.
  2. For each offer enter the usable roll dimensions, compatible remnant, and the new roll pack and freight terms.
  3. Compare full packs, unused sealed rolls and the lower complete quote.
  4. Review both allocation charts and export the strip-by-roll cut list.

The Formula

The mathematical logic powering this calculation is:

Check that the entered usable roll width meets the common required cut width. The worksheet allocates each measured strip intact, in sequence, along the length of one roll or compatible held remnant. Each strip occupies the full working width for that run. It does not join pieces for a strip or use side trim to produce another strip.
For every subset of required strips, find the fewest equal-length new rolls that fit the quantity: place a feasible subset containing the earliest remaining strip into one roll, then take the minimum over the remaining subsets. Evaluate each feasible subset of strips that fits in the separate held remnant. Choose the fewest new rolls overall. On a tie, use less of the held material and keep a deterministic ordering. This guarantees the minimum fresh roll count for the declared sequential-cut model. Lengths use whole hundredths of a foot.
Whole packs equal opened new rolls divided by rolls per pack, rounded up. New rolls bought but unused remain unopened. Compare whole packs times written pack price plus the entered freight when at least one pack is bought. If entered compatible stock supplies every strip, no purchase or freight is applied.
Enter one to twelve strips, 1–200 ft each, required and usable roll widths 4–72 in, new roll length 1–200 ft, held remnant length 0–200 ft, and 1–12 rolls per pack. Prices and freight accept up to 10,000 USD each to cents. Enter usable dimensions and already agreed trim allowances, product and application. The worksheet compares stock and cut geometry. It leaves product selection, performance, cavity condition, comfort, fire and moisture details to the specification and installation guidance.

Worked Example

If you input:

  • Cuts: Six 15-in-wide strips at 18, 17, 16, 14, 13 and 12 ft.
  • Offer A: 15 in × 30 ft roll, 20 ft compatible remnant, two new rolls per $72 pack, $8 freight.
  • Offer B: 16 in × 40 ft roll, 20 ft compatible remnant, one new roll per $60 pack, $5 freight.

Result:

Offer A opens three new rolls and buys two packs for $152.00. Offer B uses its remnant and two new rolls in two packs for $125.00.

Frequently Asked Questions

Why can a roll with more total material still need another pack?

Every required strip is one continuous piece. The worksheet places whole strips inside each separate roll length, then applies the pack size.

Why did the worksheet leave held stock unused?

When using the remnant would not reduce the number of fresh rolls, the tie rule preserves more of the held stock.

Does it count side scraps as available rolls?

Each listed length consumes a strip along the full working width. Side trim and future reuse outside the cut list are outside this allocation.

Can I combine different widths or insulation products?

Use one common cut width and compatible stock per offer. Use separate worksheets for different materials or widths.

Similar Calculators