Foundation Repair Quote & Depth Planner

Look beyond the headline foundation repair quote. Compare supplied pier counts and depth ranges against each contractor's base price, included-depth allowance and extra-depth billing terms. See which quote is least expensive at lower, midpoint and upper depths, trace physical versus billed extension, and retain unknown prices as unknown. Add engineering, permitting, access or restoration items explicitly to the common scope. This is a written-quote audit, not a repair design, diagnosis, market-price forecast or approval of a contractor. Required support count, repair method and depth assumptions must come from the project assessment. Example prices are illustrative.

Foundation repair quote audit

Look beneath the quote. See what depth changes.

Compare supplied pier scopes and written billing terms, with every allowance, extension and missing price visible.

Upper depths: USD 11,940.

Edit scope, depth ranges and quotes

Compare written quotes for a supplied repair scope. Pier counts and depth ranges must come from the project assessment; this planner does not design a foundation repair or determine safe support depths. Illustrative prices are not market averages.

Changing units preserves depths, billing increments and rates exactly. Fractions may appear; decimals or fractions such as 1/2 are accepted.

All prices must use this same currency. Changing the label does not convert money.

Compare complete quotes with this nonnegative budget. Taxes and financing are not calculated.

Supplied pier groups

Group piers sharing the same depth range. Lower, midpoint and upper scenarios move all groups together; they are not confidence intervals. Depth allowances and rounding apply separately to each pier.

Pier group 1

Identify the corresponding part of the written scope.

Enter the supplied whole count, 1–1,000. The calculator does not infer the required number.

Positive assumed installed depth per pier, not total depth for the group.

At least the lower depth. Equal values represent a single depth assumption.

Pier group 2

Identify the corresponding part of the written scope.

Enter the supplied whole count, 1–1,000. The calculator does not infer the required number.

Positive assumed installed depth per pier, not total depth for the group.

At least the lower depth. Equal values represent a single depth assumption.

Common fixed scope items

List engineering, permitting, access or restoration items explicitly included in your comparison. Adding an item marks its price unknown in every quote. Removing it removes its prices from every quote.

A fixed project charge, not a per-pier or depth charge.

A fixed project charge, not a per-pier or depth charge.

Written quote terms

Compare equivalent repair scope and method. The cheapest entered price does not establish equivalent engineering, materials, warranty or repair outcome.

Quote 1

Identify the contractor or proposal without including private contact details.

Depth included in the base price for each pier. Unused allowance is not shared between piers.

Choose unknown when the quote does not specify this price.

Multiplied by the total supplied pier count. Enter zero only for a confirmed included or free charge.

Choose unknown when the quote does not specify this price.

Applied to billed depth beyond the per-pier allowance. An unknown rate does not invalidate a scenario with no extra depth. Enter zero only for a confirmed included or free charge.

Follow the written quote; rounding is per pier, not across the combined project.

Positive increment. For example, two piers each requiring 0.1 m extra billed in 1 m increments incur 2 m total billed extension.

Choose unknown when the quote does not specify this price.

Fixed charge added once to the project. Enter zero only for a confirmed included or free charge.

Choose unknown when the quote does not specify this price.

Fixed charge added once to the project. Enter zero only for a confirmed included or free charge.

Quote 2

Identify the contractor or proposal without including private contact details.

Depth included in the base price for each pier. Unused allowance is not shared between piers.

Choose unknown when the quote does not specify this price.

Multiplied by the total supplied pier count. Enter zero only for a confirmed included or free charge.

Choose unknown when the quote does not specify this price.

Applied to billed depth beyond the per-pier allowance. An unknown rate does not invalidate a scenario with no extra depth. Enter zero only for a confirmed included or free charge.

Follow the written quote; rounding is per pier, not across the combined project.

Choose unknown when the quote does not specify this price.

Fixed charge added once to the project. Enter zero only for a confirmed included or free charge.

Choose unknown when the quote does not specify this price.

Fixed charge added once to the project. Enter zero only for a confirmed included or free charge.

Complete quote total
USD 11,940
Quote B
Known subtotal
USD 11,940
All applicable prices known
Budget headroom
USD 8,060
Budget minus complete total; negative means over budget
Billed extension depth
8 m
8 m physical extension across 6 piers

Lowest complete quote for upper depths: Quote B. Price does not establish equivalent engineering, materials, warranty or outcome.

How depth changes each quote

Common scale: 0–USD 12,500. Solid blue bars are complete totals; outlined amber bars are known subtotals with missing charges. All groups move together from lower through midpoint to upper depths. These are illustrative scenarios, not probabilities.

Quote A · Lower depthsUSD 10,500 total

Quote A · Midpoint depthsUSD 11,300 total

Quote A · Upper depthsUSD 12,500 total

Quote B · Lower depthsUSD 11,300 total

Quote B · Midpoint depthsUSD 11,300 total

Quote B · Upper depthsUSD 11,940 total

All quotes and scenarios; unavailable charges are never replaced with zero.
Quote / scenarioBaseExtra depthFixed scopeKnown subtotalComplete total
Quote A · Lower depthsUSD 9,000USD 0

Engineering and permits: USD 1,000

Restoration: USD 500

USD 10,500USD 10,500
Quote A · Midpoint depthsUSD 9,000USD 800

Engineering and permits: USD 1,000

Restoration: USD 500

USD 11,300USD 11,300
Quote A · Upper depthsUSD 9,000USD 2,000

Engineering and permits: USD 1,000

Restoration: USD 500

USD 12,500USD 12,500
Quote B · Lower depthsUSD 9,900USD 0

Engineering and permits: USD 800

Restoration: USD 600

USD 11,300USD 11,300
Quote B · Midpoint depthsUSD 9,900USD 0

Engineering and permits: USD 800

Restoration: USD 600

USD 11,300USD 11,300
Quote B · Upper depthsUSD 9,900USD 640

Engineering and permits: USD 800

Restoration: USD 600

USD 11,940USD 11,940

Depth ranges and included allowance

Quote B includes 8 m per pier. Purple spans show supplied lower-to-upper depth ranges; the solid center marker shows their midpoint. Dashed black marks the included depth. Common scale: 0–10 m. This is a billing diagram, not a foundation section or installation recommendation.

Front group · 4 piers

Lower 6 m · Midpoint 8 m · Upper 10 m

Side group · 2 piers

Lower 4 m · Midpoint 6 m · Upper 8 m

Physical depth versus billed extension

Selected scenario: Upper depths. Allowance applies independently to each pier. Rounding surplus is billed depth minus physical extension; unused allowances are not pooled.

Group totals except the explicitly labeled depth per pier.
GroupPiersDepth per pierPhysical depthAllowance usedPhysical extensionBilled extensionRounding surplus
Front group410 m40 m32 m8 m8 m0 m
Side group28 m16 m16 m0 m0 m0 m

Total physical depth: 56 m. Allowance used: 48 m. Physical extension: 8 m. Billed extension: 8 m. Rounding surplus: 0 m.

Save the calculation record

CSV includes supplied scope, written prices, all three scenarios, missing-price statuses and exact canonical metre quantities. Fractional values preserve arithmetic, not predictive accuracy. No taxes, financing, structural design or warranty valuation is inferred.

How to use this calculator

  1. Load Depth crossover example or Per-pier rounding example, then open Edit scope, depth ranges and quotes. Choose metres or feet, enter the common currency label and budget.
  2. Enter supplied pier groups with their assessed counts and lower/upper installed depths per pier. Group together only piers sharing the same depth assumptions.
  3. Add common fixed scope items such as engineering, permitting, access and restoration. Adding an item marks its price unknown in every quote until you enter confirmed terms.
  4. Enter each written quote's base price per pier, included depth, extension rate and exact or incremental billing rule. Mark absent prices unknown; use zero only for confirmed included or free work.
  5. Compare all three scenarios, inspect the selected quote's depth and billing ledger, and review missing scope before relying on a price ranking. Download the CSV or show its selectable text for a record of the assumptions.

The Formula

The mathematical logic powering this calculation is:

For a group of n piers with lower depth a and upper depth b, evaluate depth d at a, (a+b)/2 and b. Each group moves to its corresponding endpoint or midpoint simultaneously. These are supplied scenarios, not probability distributions or design recommendations.
For a quote with included depth A per pier, physical extension per pier E = max(0, d − A). Under exact billing, billed extension B = E. Under incremental billing with increment h, B = ceil(E/h) × h. Apply rounding to each pier before multiplying by n. Do not pool unused allowance or extension depth across piers. Group physical depth = n × d; allowance used = n × min(d,A); physical extension = n × E; billed extension = n × B; rounding surplus = n × (B − E).
Base charge = total pier count × base price per pier. Extension charge = sum of group billed extensions × quoted extension price per length unit. Add each explicitly priced fixed scope item once per project. An unknown extension rate does not affect a scenario with zero billed extension. Any other applicable unknown charge leaves the complete total unavailable; the known subtotal is retained and excluded from cheapest-quote rankings. Keep all tied lowest complete quotes. Budget headroom = budget − complete total, or unavailable for incomplete quotes.
1 foot = 0.3048 metres exactly. Unit conversion changes depths and billing increments by the length factor and changes per-length rates by the inverse factor. Currency labels do not convert money. Rational arithmetic preserves exact quantities in calculations and exports; display rounds to two decimal places except meaningful tiny nonzero values. Input bounds are computational limits, not engineering constraints. Taxes, financing, warranty value, repair adequacy and soil capacity are not inferred.

Worked Example

If you input:

  • Supplied pier groups: 4 front piers at 6–10 m; 2 side piers at 4–8 m
  • Budget: USD 20,000
  • Quote A: USD 1,500 per pier; 6 m included; USD 100/m extra, rounded per pier to 1 m; USD 1,500 fixed scope
  • Quote B: USD 1,650 per pier; 8 m included; USD 80/m exact extra depth; USD 1,400 fixed scope

Result:

Six piers give base costs of USD 9,000 for A and USD 9,900 for B. At lower depths, neither quote bills extensions, so totals are USD 10,500 and USD 11,300. At midpoint depths (8 m front, 6 m side), A bills 8 m of extensions at USD 100/m while B bills none: both total USD 11,300. At upper depths (10 m front, 8 m side), A bills 20 m and totals USD 12,500; B bills 8 m and totals USD 11,940. Quote A is lowest at lower depths, both tie at midpoint, and B is USD 560 lower at upper depths. B's upper-depth budget headroom is USD 8,060. Total installed depth at the upper endpoints is 4 × 10 + 2 × 8 = 56 m. These counts and prices demonstrate billing only, not an actual repair recommendation.

Frequently Asked Questions

Does this estimate the number of piers my foundation needs?

No. Counts, method and depth assumptions must come from the project assessment. The calculator compares written billing terms for a supplied scope and does not design, diagnose or approve a foundation repair.

Why can the cheapest quote change with depth?

Quotes can include different depths in their base prices and charge different rates or increments for extensions. A lower base price can be overtaken by additional depth charges. The comparison shows three supplied depth scenarios, not a prediction of final installed depth.

How does per-pier rounding work?

If two piers each require 0.1 m of extra depth and the contract bills full 1 m increments per pier, the billed extension is 2 m. Rounding their pooled 0.2 m to 1 m would understate that contract charge.

Can unused included depth transfer to another pier?

Not in this model. The allowance applies separately to each pier. If your contract pools allowances or uses a different billing rule, this workflow does not represent those terms.

What happens when a price is unknown?

Any scenario requiring the missing charge retains a known subtotal but has no complete total or budget headroom and is excluded from cheapest-price ranking. An unknown extension rate does not invalidate a scenario requiring no billed extension.

Are midpoint and upper scenarios confidence levels?

No. Midpoint is the arithmetic average of each supplied lower and upper depth. All groups move together. The scenarios do not represent probabilities, soil predictions or an engineered minimum or maximum.

Are the default prices market averages?

No. They are illustrative values chosen to demonstrate a price crossover. Real proposals depend on assessed scope, site access, depth, method and local terms. The cited commercial sources provide context, not adopted price defaults or universal requirements.

Does the lowest complete quote represent the best repair?

No. Price arithmetic does not establish equivalent method, engineering, materials, scope, warranty or outcome. Fixed scope items are included only when you list them, and taxes, financing and warranty valuation are not automatically added.

Similar Calculators