Epoxy Floor Bid & Return-to-Service Planner

Audit two written installed floor-coating bids and compare how the actual closure times affect the operating hours that matter to you. Record separate foot and vehicle reopening milestones, check matching removal, preparation, repairs and testing, then compare the entered cost including temporary access and an optional future recoat.

Installed quotes and access schedules

Compare installed epoxy floor bids and reopening windows

See which closures block your operating schedule and what happens to the cost when a future recoat is included.

Quote B is $325.00 lower for this scenario.

Prices use the entered scope and access costs. Reopening times come from the written project schedule.

Quote A

$3,475.00

Comparable scenario cost

Known contractor charges
$2,800.00
Installation access cost
$675.00
Installation foot hours blocked
13 h
Installation vehicle hours blocked
27 h

Quote B

$3,150.00

Comparable scenario cost

Known contractor charges
$3,050.00
Installation access cost
$100.00
Installation foot hours blocked
0 h
Installation vehicle hours blocked
4 h
Closed time and operating windows

Initial installation · Vehicle traffic

Quote AQuote BOwner open hours
Vehicle traffic closures and interrupted operating hoursDotted segments span the documented closure. Thick segments mark time blocked during the owner's operating window. See the exact times below.
Monday 00:00192 h elapsed

Quote A · 8 h to 80 h closed · 27 h blocked

Quote B · 113 h to 180 h closed · 4 h blocked

Owner operating windows and costs

Enter daily hours on a 0–24 clock. A closing hour earlier than opening continues into the next day.

Foot traffic operating window
Vehicle traffic operating window

Installed scope and written milestones

Required work

Use written milestones in elapsed hours from Monday at 00:00. Treat recoat as a separate reference week. Enter ? for an unconfirmed milestone or price.

Quote A
Installation closure and reopening
Quote B
Installation closure and reopening

Bid ledger and export

Open bid and access ledger
Documented charges in USD and blocked hours
LineQuote AQuote B
Base installed price$2,000.00$2,600.00
Old coating removal$300.00$250.00
Surface preparation$350.00$200.00
Repairs$150.00$0.00
Testing$0.00$0.00
Installation foot hours blocked13 h0 h
Installation vehicle hours blocked27 h4 h
Installation temporary access cost$675.00$100.00
Known charges$3,475.00$3,150.00
Comparable total$3,475.00$3,150.00
Copy exact CSV

How to use this calculator

  1. Choose the same installed works for both offers and record known package inclusions or prices.
  2. Enter the owner’s recurring foot and vehicle operating windows. Select at most one paid temporary-access category.
  3. Enter each quoted closure start and documented foot and vehicle reopening clock.
  4. Enable one owner-specified future recoat if you have written figures for that scenario.
  5. Compare the closed operating windows, known and complete charges, reopen milestones and CSV ledger.

The Formula

The mathematical logic powering this calculation is:

Compare written contractor scope for the same measured project. The base price covers the quoted installed system. Select the removal, preparation, repairs and testing the project needs. For each required line, mark In package only when the written base fee covers the work. Enter a separate price once and use 0 for a confirmed waived fee or ? for an unquoted amount. Excluded and unclear work stay visible as scope gaps. Suppliers and project specifications determine what operations, conditions and performance are required.

Enter each stage's actual quoted closure start and separate foot and vehicle reopening times as elapsed hours from Monday 00:00 of a local reference week. Use a separate reference week for the optional recoat. The clock repeats fixed 24-hour days. Use product- and contractor-confirmed release times for the intended use. The calculator carries those times into the owner’s schedule without estimating cure, selecting a coating, or determining permission to reopen. Reopening cannot precede closure start, and recorded vehicle release is at or after the recorded foot release in this staged scenario. Use ? for an unconfirmed milestone.

For each type of traffic, set the owner’s recurring operating window on weekdays, weekends or every day. A closing time earlier than the opening time means the window continues into the next day. An overnight window belongs to the day it opens, including a preceding Sunday when relevant. Use 0 to 24 for 24-hour availability or choose No window. Count only the overlap of the closed interval [closure start, reopening) and each owner window [opening, closing). The reopening endpoint is open. Interrupted foot and vehicle hours are separate physical results. Only one of them can be monetized, using the supplied temporary-access cost per interrupted hour. This avoids adding two estimates for the same closure. Multiply quarter-hour counts by the hourly price divided by four and round each stage charge to cents, with half a cent rounded up. A confirmed zero rate or zero overlap costs zero.

First installation cost includes the entered base, separate matched work and any selected temporary access charge. Choose one recoat scenario with written scope, price and its own dated closure. The entered year labels that owner scenario and carries no service-life prediction. The combined cost adds the two stages in nominal USD with no escalation. Nonmatching scope, unpriced charges or an unmeasurable priced closure prevent a cheapest-price conclusion. They leave known charges, confirmed times and separate gaps visible. An unmonetized unknown reopening remains an access gap and can coexist with a complete dollar comparison.

Use quarter-hour steps for operating windows and quoted closure milestones. Initial and recoat stage times accept 0 to 672 elapsed hours. Opening times are 0 to 23.75 and closing times 0 to 24. Recoat year is a whole 1 to 30. USD fees and rates accept 0 to 1,000,000 with up to two decimals. Supplier examples distinguish foot traffic, full cure and other use milestones, which depend on the exact product and conditions. The example prices and schedule are authored illustrations. Authorization to resume service comes from the actual project team.

Worked Example

If you input:

  • Required access: Foot and vehicle access weekdays 08:00–17:00
  • Quote A: $2,800 contractor total, closure Monday 08:00 to Thursday 08:00 for vehicle traffic
  • Quote B: $3,050 contractor total, closure Friday 17:00 to following Monday 12:00 for vehicle traffic
  • Temporary vehicle access: $25 per interrupted operating hour
  • Recoat: Off for the initial comparison

Result:

Quote A interrupts 27 scheduled vehicle hours for $675.00 in added access costs. Quote B interrupts 4 hours for $100.00. Including those charges, Quote A totals $3,475.00 and Quote B totals $3,150.00. Quote B is $325.00 lower. The year-3 recoat example adds $400.00 to A and $1,000.00 to B without interrupting weekday hours, making Quote A $275.00 lower in that scenario.

Frequently Asked Questions

Where should I enter the cure time from a product label?

Use the written project reopening time for the intended access type after confirming the product, conditions and contractor’s schedule. The worksheet compares those supplied times with your windows.

Why does a long weekend closure cost less in the example?

Only hours where a closure overlaps a selected operating window count toward the optional temporary access cost. The full closure remains visible on the timeline.

How do overnight windows count?

The window belongs to its opening day. A Sunday 22:00 to Monday 06:00 shift can overlap a Monday morning closure even if Monday itself is outside the selected opening days.

Can I add lost revenue and parking alternatives together?

The worksheet monetizes one operating profile using your documented temporary-access cost. Use the physical foot and vehicle results to plan any other impacts separately.

Does the recoat year show when an epoxy floor needs maintenance?

It labels one written scenario you choose. Actual maintenance scope, conditions and scheduling depend on the installed system and project team.

How is this different from the epoxy material calculator?

This planner compares installed quote scope, service interruptions and a recoat invoice. Use the related Epoxy Flooring System & Cost Planner to compare coating layers, coverage and whole-kit purchases.