Deck Repair Scope & Allowance Quote Planner

Compare two written deck repair offers against the same measured boards, treads, railing, finishing and haul-away scope. Explore a contractor-defined range for one extra item. See when an included allowance creates a credit or surcharge and when the lower offer changes.

Installed repair quotes

Compare deck repair bids across extra quantities

Check measured scope and written allowance terms, then see how extra work changes the quote you pay.

Quote A is $196.00 lower at 2 extra boards.

Quote A

$3,174.00

Complete quote at selected quantity

Written subtotal
$3,274.00
Applied adjustment
$100.00 credit

Quote B

$3,370.00

Complete quote at selected quantity

Written subtotal
$3,370.00
Applied adjustment
$0.00

Repair quote by extra quantity

Whole quantities of extra boards. Curves show complete entered quotes only.

  • Quote A
  • Quote B
Settled quote price by extra repair quantityComparison across whole units. 0–3 · Quote A lower. 4–12 · Quote B lower. Read exact prices in the quantity ledger.$2.9K$3.5K$4.1K036912
  • 0–3 · Quote A lower
  • 4–12 · Quote B lower

Measured repairs and extra-work range

Choosing a different item clears its quantity range, written base and allowance terms.

Written scope and pricing

Enter 0 for a confirmed zero. Use ? for an unquoted amount or quantity limit.

Edit Quote A
Extra work and allowance

Leave a dollar cap blank if your quote states no limit. Enter ? if the terms are unclear.

Edit Quote B
Extra work and allowance

Leave a dollar cap blank if your quote states no limit. Enter ? if the terms are unclear.

Quantity and price ledger

Show measured scope charges
Costs before the extra work adjustment
Measured workQuote AQuote B
Deck boards$1,440.00$1,380.00
Stair treads$220.00$240.00
Railing$464.00$500.00
Haul-away$150.00Included
Written subtotal$3,274.00$3,370.00
Show every quantity

How to use this calculator

  1. Enter measured repairs common to both quotes and choose any haul-away.
  2. Pick the extra work item and the contractor-supplied range of possible quantities.
  3. Enter each quote’s base, covered repair lines, written allowance rules, and unit and dollar limits.
  4. Select an extra quantity, inspect where the lower offer switches, and download the scenario ledger.

The Formula

The mathematical logic powering this calculation is:

Use the same inspected repair scope and quantities for both written offers. Deck board and stair tread inputs are counts. Enter railing in linear feet and finishing in square feet. Haul-away is one job. Each required line is either included in the quoted base, charged as a fixed fee, or extended at its written unit price. Multiply measured quantities by the unit price and round each extension to cents, with half a cent rounded up. Add separately priced items once. Include confirmed taxes and fixed charges in the written amounts.

Explore one class of potential extra work measured in whole units. Set the low and high quantities using the contractor’s proposed pricing schedule and your documented scenario. Extra work beyond the written quantity limit requires a revised quote. Quote A and Quote B use the same quantities and item. Changing the item clears the relevant written terms, so the new quantity is priced with its own quote.

Use Pay per extra unit when the quoted base has no allowance for the selected extra scope. The unbounded adjustment is the entered per-unit price multiplied by actual extra quantity. Use Credit or charge when the written base includes an allowance and its difference from actual charges is reconciled. Subtract the included allowance from the unit price extension to find the adjustment. Overage only applies the positive difference, with a zero adjustment when the extension remains within the allowance. Enter the allowance as part of the quoted base and as the amount to reconcile, so it enters the total only once. The allowance cannot exceed the known base. A signed maximum credit bounds a negative adjustment. A maximum surcharge bounds a positive adjustment. Blank bounds mean the quote states no applicable limit in dollars. A 0 cap confirms zero on that side. A question mark preserves an unknown term. Neither dollar cap extends the supported quantity.

Settle each comparable total by adding the signed adjustment to the entered subtotal. Evaluate every whole quantity in the selected interval. The chart and table show exact checked outcomes and aggregate adjacent quantities where the result is the same. If a required scope or amount is unconfirmed, or a quantity exceeds a written limit, keep that scenario unresolved. Its written subtotal can be higher or lower than the eventual total because credits and charges can both apply.

Use contractor-inspected scope and written terms. The example prices are authored to show the arithmetic and do not indicate typical local rates. The worksheet handles commercial terms and quantity sensitivity. The project team determines suitable repair, actual quantities and any inspections or permits needed.

The shared counts and quantity limits are whole 0 to 500. Railing and finish quantities accept 0 to 10,000 with two decimals. Quote amounts, rates and dollar caps are nonnegative USD up to 1,000,000 with two decimals. Enter 0 only for a confirmed zero.

Worked Example

If you input:

  • Known repairs: 12 boards, 4 treads, 14.50 linear ft of railing and haul-away
  • Extra boards: 0 to 12, with 2 selected
  • Quote A: $3,274 before adjustment, $400 included allowance, $150 per added board, $250 credit cap and $700 surcharge cap
  • Quote B: $3,370 before adjustment, $300 included allowance, $90 per added board and $400 surcharge cap. Overage-only terms.

Result:

At two added boards, A receives a $100 credit and totals $3,174. Quote B totals $3,370. A is $196 lower. At six, A totals $3,774 and B totals $3,610, making B $164 lower. A leads through three added boards and B leads from four through twelve.

Frequently Asked Questions

What happens to the allowance already inside the base quote?

It stays in the starting quote and is reconciled through the signed difference. Enter the applicable written policy for whether the unused amount is credited.

Can a dollar cap price extra work beyond the contractor’s quantity limit?

Confirm a revised written scope before comparing beyond the stated unit limit. The model leaves quantities above that limit unresolved.

What does a subtotal mean if terms are incomplete?

It is the amount of the written base and known separate lines before the extra work adjustment. Additional charges or credits can still change it.

Does the tool determine if a deck can be repaired safely?

The project team determines the suitable repair scope. Use this worksheet to compare quantities and charges supplied in the written bids.

Where can I compare staining expenses?

Use the Deck Stain Coverage & Quote Planner for measured staining coverage and product or contractor costs.

Similar Calculators