Pool Removal Cost Calculator & Fill Quote Comparison

Model a rectangular pool with one straight floor slope, then compare the pool fill and debris hauling quantities in two written scopes. Check the visible volume profile and single-trip capacity markers, and export the exact quote ledger.

Pool removal planning

Compare pool removal and fill quotes

Measured rectangular pool

Use end depths for a single straight floor slope over a constant width.

Quote A · Written quantities and charges
Quote B · Written quantities and charges
Quote A costs less for its entered scope.
Quote A · Entered total
$4,705.00
52 yd³ finished fill · 5 fill deliveries · 1 haul trips
Quote B · Entered total
$4,730.00
45 yd³ finished fill · 6 fill deliveries · 1 haul trips

Inspect fill and haul quantities

Longitudinal section48 yd³ shared interior
3 ft6 ft24 ft length

12 ft constant width. Depth scale expands to fit the section.

Review cost ledger and exact CSV
Cost by written scope
ChargeQuote AQuote B
Loose fill$2,210.00$2,160.00
Fill deliveries$925.00$990.00
Outbound hauling$230.00$210.00
Fixed scope$1,340.00$1,370.00
Total entered quote$4,705.00$4,730.00

How to use this calculator

  1. Enter the inside rectangular dimensions and end depths from the same measured pool profile.
  2. For each quote, enter additional documented void, separately confirmed displacement, the loose-fill factor, and loose debris to leave the site.
  3. Enter usable capacity and per-trip charges for fill delivery and debris hauling separately, plus fill price and fixed charges from that scope.
  4. Review the measured section, trip quantities and cost ledger. Compare scope coverage with the quote documents before interpreting a lower entered total.

The Formula

The mathematical logic powering this calculation is:

The shared rectangular interior void in cubic yards equals length × width × (near depth + far depth) ÷ 54, with dimensions in feet. It covers a constant width and a single straight floor slope. For each written scope, finished imported fill equals the shared interior plus separately documented additional void minus approved displacement already counted inside that void. Loose imported fill equals finished imported fill times the entered loose yards per finished yard. Loose outbound debris volume is an independent documented quantity.
Round each positive loose volume divided by the corresponding confirmed usable capacity up to a whole trip. Zero volume takes zero trips. Exactly one full capacity takes one trip, even with a rounded visual display. Add loose fill times its unit price, fill deliveries times their price, outbound trips times their price, and the written fixed scope. Round fill material cost once to the nearest cent, half up. Enter capacities that already account for the contractor’s accepted material, weight and site restrictions.
Dimensions accept 1–500 ft length and width and 0.01–50 ft depth. Additional void, approved displacement and debris accept 0–100,000 yd³, loose-to-finished ratios 1–5, and confirmed capacities 0.1–300 yd³. Volume and dimension fields accept three decimals. Monetary fields accept two. Verify the written scope and intended use separately. Permit, fill and future building requirements vary by jurisdiction and site. The worksheet compares supplied quote terms and performs no design, approval or site feasibility assessment.

Worked Example

If you input:

  • Pool: 24 × 12 ft, 3 to 6 ft deep
  • Quote A: 65 yd³ loose fill at 13 yd³ per delivery
  • Quote B: 54 yd³ loose fill at 10 yd³ per delivery

Result:

Shared interior void is 48 yd³. Quote A takes five fill deliveries and totals $4,705.00. Quote B takes six fill deliveries and totals $4,730.00. With the example’s far depth increased to 6.001 ft, A needs a sixth delivery and B has the lower entered total.

Frequently Asked Questions

Can I model a pool with a curved plan or several slopes?

This worksheet supports a rectangular footprint with one straight slope. A profile with benches, stepped sections or several pitches needs a measured takeoff appropriate to that shape.

Why are finished fill and loose fill different?

Quotes can describe the volume in place and delivered loose material separately. The entered ratio applies the supplier’s documented relationship so trip counts and loose material prices use the same basis.

Does outbound debris equal the inside pool volume?

Enter the loose outbound load from the written scope. The measured void and removed material describe different quantities, and different quotes can cover different outbound work.

When does another fill delivery appear?

The count increases as soon as loose fill exceeds a whole multiple of the entered per-delivery capacity. At exactly that multiple it stays at the lower count.

What is an approved displacement credit?

It is the portion of the entered finished void already covered by documented displacement within that scope. Confirm which volume is approved before entering a credit.

Does the cheapest result include permits or inspections?

The result includes the entered quote lines. Confirm any permit, inspection, testing, restoration and other fixed charges with the bid before making a like-for-like comparison.

Similar Calculators